Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.

Similar presentations


Presentation on theme: "Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the."— Presentation transcript:

1 Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the LHCb detector Technical Specification

2 Main scopes of the work 1.construction of a cooling unit at demineralised water for the Outer Tracker sub-detector 2. installation of: - supply/return transfer lines and distribution manifolds for the OT - supports for pipelines on the RB84 side of the cavern 3.supply and installation of pipelines and equipments for primary water networks and compressed air line 4.control and electricity works for the OT 5.tests on hydraulic performances and control functionalities 6.commissioning, training and validation of both the OT and primary systems 7.supply of all required technical documents Paolo Guglielmini TS / CV / DC08th April 2005

3 Underground areas – Point 8 Paolo Guglielmini TS / CV / DC08th April 2005

4 Experimental cavern UX 85 – Layout

5 LHCb detector – Overview

6 Positioning of the platform

7 Passage around shielding wall

8 Transfer lines – Passage through the TX84

9 Installation of supports for the pipelines

10 Outer Tracker distribution manifolds Outer Tracker manifolds represented in light blue

11 Primary water systems on RB86 side

12 Primary water systems - Details 1 2 3 1. Connections to barracks D1 and D2 2. Connections to barracks D3/A and D3/B 3. Connections to cooling systems

13 Compressed air and demineralised water networks RB84 RB86 - the arrows indicate from where the existing pipelines have to be prolonged - in light blue on the RB84 side the demineralised water network - in white on both sides the compressed air network

14 Outer Tracker – Requirements Pressure drop inside the detector (including all piping located after the manifolds) 1.5 bars Flow rate 10 m 3 /h (flow to the detector) 1 m 3 /h (flow in the demineralization loop) Inlet temperature19 ± 1 °C Temperature increasing inside the detector2 °C Volume of coolant in the detector (including all piping located after the manifolds) 50 litres Demineralised water conductivity0.1 to 1 mS/cm Cooling capacity23 kW CERN Mixed water network: - Inlet temperature - ΔT available - Inlet pressure - ΔP available 13 °C 5 °C (!) 10 bar (a) 2 bar Ambient conditions inside the cavern: - Dry temperature - Dew point 17 to 27 °C ≤12 °C Paolo Guglielmini TS / CV / DC08th April 2005

15 Outer Tracker – Principle Schema Paolo Guglielmini TS / CV / DC08th April 2005

16 Pipe works in the UX85 experimental cavern Activities related to WORK LOT 1 - fixation of the supports for 16 transfer lines (OT included) along the RB84 side and on top of the vault TX84 - installation of the OT transfer lines in stainless steel (multilayer pipes use to be quoted as an option) - installation of the supply/return OT distribution manifolds Activities related to WORK LOT 4 - installation of pipelines for chilled and mixed water (RB86), demineralised water (RB84), compressed air (both sides) networks, including supports and required equipments Due to INTEGRATION matters the detailed activities shall be scheduled and performed during: JUNE – JULY 2005 Paolo Guglielmini TS / CV / DC08th April 2005

17 Integration in the SCADA local supervision IT 3307 – Paragraph 4.2.2.1 “Communication” Four additional cooling systems will also be locally supervised and operated from the SCADA local supervision platform. These cooling systems are controlled by 3 PLCs, which are also built on Schneider Premium TSX equipment. These PLCs are not included in the scope of the supply of this Technical Specification. 1 PLCInner Tracker - Tracker Trigger 1 PLCRICH 1 & 2 1 PLCVELO The Contractor shall integrate in the SCADA local supervision platform database the process data from these 3 external PLCs. The Contractor shall develop, test, install and validate on-site the local supervision means corresponding to these external cooling stations... Provided commissioning of the cooling systems whose PLCs shall be integrated: end of FEBRUARY 2006 Paolo Guglielmini TS / CV / DC08th April 2005

18 Provided delivery schedule Contract signatureApril 2005 Design MeetingMay 2005 Pipe works in the UX85 cavernJune – July 2005 Complete installation of the OT cooling station at Contractor’s premisesSeptember 2005 Performance tests at Contractor’s premisesOctober 2005 Installation of the unit in the cavern, connection to CERN networks, tests, commissioningEnd 2005 Integration in the SCADA of the additional cooling systemsFebruary 2006 Paolo Guglielmini TS / CV / DC08th April 2005