Hall D Civil and Cryogenic Issues Ravi Anumagalla.

Similar presentations


Presentation on theme: "Hall D Civil and Cryogenic Issues Ravi Anumagalla."— Presentation transcript:

1 Hall D Civil and Cryogenic Issues Ravi Anumagalla

2 Hall D Side View The Required Crane Hook Height wrt Finish Floor is 10 m or higher.

3 The Required Beam Height wrt Finish Floor is 3.5 m, Civil Drawings show a height of 3.89 m (9.00-5.11).

4 Cryo Building The Cryo Building is exactly located at the end of the Earth Berm The length of the Transfer line required for this setup is 91 ft (27.5 m)

5 Move by 6m Counting House should be moved by 6 m to facilitate the installation Transfer Line A 47.5 Deg Angle for the transfer line fits perfect to the current location of the Cryo Building

6 The Transfer line is at angle of 5.5 Deg wrt to the horizontal Transfer Line Orientation A A The above figure shows Section A-A Along the Transfer Line

7 Cryo Plant End View Transfer Line

8 Counting House should be moved by 6 m to facilitate the installation of Transfer Line With the current setup, the length of the transfer line reduced to 9.5 m compared to 27.5 m with the earlier setup.

9 Counting House should be moved by 6.5 m to facilitate the installation of Transfer Line With the current setup, the length of the transfer line is reduced to 9.5 m compared to 27.5 m with the earlier setup.

10 Location of the stairs is not changed Road to access the Mech/Elec Room