 Overview of the run 2009 for CV  Major improvements in 2009 - Water treatment - Demineralised water production - Cooling control  Major concerns for.

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
André Augustinus 16 June 2003 DCS Workshop Safety.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
ATC/ABOC 23 January 2008Session 5 / MTTR and spare parts G. Peon, J. Inigo-Golfin TS/CV MTTR and Spare parts for the LHC BACKBONE (TS/CV)
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Update on the PSB Cooling and Ventilation Systems
EN-CV activities for LHC during LS2
1 ) Infrastructure consolidation (TS/FM and TS/CE groups)
Situation of the Static Var Compensators at CERN.
VENTILATION OF AD TARGET Kick off meeting
Evolution and future of the Access safety and control systems
AD consolidation activities in LS2
the high-voltage network of CERN ToMORROW
Installations, modifications, consolidation in 2005:
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
CV maintenance works during YETS
Cooling systems for HL-LHC (WP17.3)
2016.
EN-CV interventions during EYETS for PS and PSB
COOLING & VENTILATION INFRASTRUCTURE
Alexander Herlert, CERN (PH-SME-IS)
Maintenance at ALBA facility: Strategy for the conventional services
Experimental Areas – LS2 planning
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for the future  Reject water treatment  PS Ventilation and Linac 3 cooling  North area ventilation and chilled water  Conclusion IEFC 2010 Workshop - Reliability of the cooling and ventilation installations for injectors

Cooling stationAvailability for beam Problem LINACS + LEIR <100 %22/09 wrong connexion in the cubicle → 1h10 LINAC 2100 % LINAC 3<100%Several problems with the PS chilled water circuit BOOSTER100%23/4 Leak on the user side → 6h55 PS Magnet100% PS Central Bldg100% PS thyristor100% Isolde100% Isolde target100% AD<100% In June, two leaks on the user side → 9h00 05/09 broken motor of a secundary pump: 1h16 EAST area100% CTF3100%

Cooling stationAvailability for beam Problem BEQ2100 % BEQ3100 % BA1100 % BA2<100 %2/11 PLC power supply → 1h40 BA3100% BB3100% BA4100% BA5100% BA6<100%03/08 faulty leak detection sensor → 3h02 CNGS100% BA80100% BA81100% BA82100% TCC8100%

 PS Chilled water failures  Leaks difficult to repair (very rusty + asbestos)  Lack of pressure for the cooling of Linac 3 source  The 5th of August reject pipe blocked for the sump in TT6→ several access and stops (10/10, 19/10) needed to fix the temporary solution implemented during technical stops  The 27th of September: belt broken for the ventilation of the CNGS Target area. → 21h50  North area :  Important leak for the chilled water circuit  Ventilation of the EHN1 Barracks : lack of spare parts and regulation not compatible with the present needs of the user. IEFC 2010 Workshop - Reliability of the cooling and ventilation installations for injectors

 Optimization of the water treatment has shown good result.  SC has accepted the compensatory measured proposed to face a longer run (more than 12 months but less 2 years). IEFC 2010 Workshop - Reliability of the cooling and ventilation installations for injectors

Wizcon : CoolPS2 Wizcon : CoolPS1 CCC - TIM BoosterPS magnetPS Central BldgLEIR LinacsEast Area CTF3 Technical network CCC - TIM CTF3

Booster PS magnet PS Central Bldg LEIR Linacs East Area CCC - TIMPCVIEW CTF3 Technical network OPC server PCVIEW

Wizcon : VCoolBA1 CCC - TIM BA1BB3BA2BA3BA4 Technical network BA5BA6BA7BA81BA82BA80 JEC Wizcon : VCoolBA2 Wizcon : VCoolBA3 Wizcon : VCoolBB3 Wizcon : VCoolBA4 Wizcon : VCoolBA5 Wizcon : VCoolBA6 Wizcon : VCoolBA7 Wizcon : VCoolBA80 Wizcon : VCoolBA81 Wizcon : VCoolBA82

PCVIEW OPC server PCVIEW BA1BB3BA2BA3BA4 Technical network BA5BA6BA7BA81BA82BA80 JEC CCC - TIM

In 2009 CERN receive a letter from the Swiss authorities mentionning that the reject water (coming mainly from the cooling towers) is not compliant with « ordonnance sur la protection des eaux ». Even if the reject is respecting the limit given by SC. The difference between the concentration of Zinc in the river before and after the reject must be lower than 5μg/l. 450 MW of cooling capacity →all the reject goes in the Nant d’Avril and CERN is providing more than 50% of the river‘s flow in summer. Several meetings with the Swiss Authorities in order to find an agreement. Study to change the treatment → test done in SF1 (reduction of 20% of the Zinc) will be compensate by the increase of the load (LHC) We‘ll have to treat the reject water → very important work and no budget foreseen. Long run = compensatory measure = more treatment = the problem will getting worse. IEFC 2010 Workshop - Reliability of the cooling and ventilation installations for injectors

PS ventilations: number of repair has increased considerably for the last three years. The technical stops become too short to be able to fix all the problems. So we’re running constantly with one or two air handling units not fully operational. → we need technical stop (long anough and often) →[ref. Mid-term consolidation plan for the cooling and ventilation facilities, – August 2009] Chilled water circuit of the PS is not so reliable and affecting the Linac 3 cooling: Lack of pressure for Linac 3 cooling → several improvements and replacement of the pumps already foreseen this year. Commissioning has to be done during the technical stop Piping →[ref. Mid-term consolidation plan for the cooling and ventilation facilities, – August 2009] IEFC 2010 Workshop - Reliability of the cooling and ventilation installations for injectors

North area ventilation : No spare part available for the controller → modification of the control cubicle. Important down time. Ventilations not adapted anymore to user need → study. Chilled water circuit of the north area: bad state, difficult to repair (asbestos) Piping →[ref. Mid-term consolidation plan for the cooling and ventilation facilities, – August 2009] IEFC 2010 Workshop - Reliability of the cooling and ventilation installations for injectors

Improvement in 2009: reliability increased for the production of the demineralised water, for the water treatment and for alarm transmission of the PS cooling station PS Improvement foreseen in 2010 for the Linac 3 cooling but it remains a strong concern for this run Following the agreement with the Swiss Authorities on the CERN water reject limit, We‘ll have to find the appropriate technical solution to treat the reject → resources will be needed To be able to maintain condition in the PS and to implement the replacement of the pumps for the PS chilled water we need technical stops IEFC 2010 Workshop - Reliability of the cooling and ventilation installations for injectors