Presentation is loading. Please wait.

Presentation is loading. Please wait.

2016.

Similar presentations


Presentation on theme: "2016."— Presentation transcript:

1 2016

2 Fire Detection & Evac Continuous maintenance & operation
Including evacuation drills Replacement of LHC Experiment’s smoke detectors for rack protection ~885 det. Installation of ~1500 new detectors and ~80 new sirens Continuous renewal of existing installations Completed - Meyrin: Z19, Z31 (B513) Started - Meyrin Z29 (PS), Z30 (AD, Isolde, Booster), Z22, Z26 Laser detectors replacement: SDX1, SX1, 513, SX5 Linear detectors replacement: 355, 358, 112 Projects SM18 Cluster D MEDICIS – Ongoing – several phases GIF ++ AWAKE EAR 1 modification RWTC – Ongoing – several phases SPS Fire Safety Project started Numerous “small” projects (~80 projects/year, 1.5 MCHF) 653, 54, 169, 4

3 Gas/ODH Detection & SNIFFER
Continuous maintenance & operation Replacement of LHC central’s chargers Completed – Refurbishing of SD18-SM18 central Continuous renewal of existing installations Started – EHN1 Infr. (JURA side) – new SYNTEL technology Started – Meyrin: Z22 (Chaufferie) – new SYNTEL technology Started – BB5 - ODLHAM Projects - Ongoing EHN1 Extension – new SYNTEL technology GIF ++ – new SYNTEL technology Project - Under definition Crab cavities Building new SYNTEL technology Meyrin zone 26 External Review for ESS – ODH systems

4 Alarm transmission Continuous maintenance & operation
Weekly updates Follow-up of the FB interventions Monthly meeting with FB Continuous renewal of existing infrastructure Completed - Replacement of CSAM Text Display to Magelis Completed - Replacement of CSAM Servers Completed - RoMMD project (301 terminal blocks SIEMENS installed) Completed - OPC Kepware for gas centrals Completed - Upgrade of CSAM Long Term History Projects - Ongoing Improvements of CSAM Configuration Manager Migration of Orgabat software Migration of CSAM PLC to UNITY Projects - Under preparation Working Group for the review of CSAM Requirements to define the direction for CSAM2 implementation Management of CCC Alarm Display by CSAM PLC Concentrator for reliability improvement CSAM= CERN Safety Alarm Monitoring System

5 SPS - Upgraded automatic fire detection & protections systems – WP2
SPS Fire Safety SPS - Fire Sprinkler Protection Systems – WP4 Launched MS for Feasibility study and a technical proposal of water based Automatic Fire Extinguishing system Feasibility study performed SPS - Upgraded automatic fire detection & protections systems – WP2 2 posts opened Project leader & technical responsible named Project launched MS under preparation Fonction X … moving towards: Voice Alarm Safety Systems

6 Global Infor EAM PPE Working Groups
Completed - Classes & Categories (EDMS ) Improved - Material obsolescence management Improved - Park reports Testing – Checklist PPE Reevaluation of PPE after Infor update Working Groups GIS Protal information for FB BE-AMF Forum

7 Global Trainings IPAC 2016 HL-LHC Automatic Fire Protection systems
Automatic Fire Sprinklers systems ATEX - Electrical installations Batteries IPAC 2016 Concept of Fire & Gas safety system for Accelerators HL-LHC Cost estimates prepared Preliminary design

8 Technical student(s) for red phones maintenance (~ 10 days, end of december to end of January)
EDMS


Download ppt "2016."

Similar presentations


Ads by Google