API 17P TASK GROUP January 15, 2013
BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P / ISO new recommended practice Effort is being led by API task group Effort is being led by API task group Draft relied heavily on specifications from a number of operators Draft relied heavily on specifications from a number of operators
SCOPE production and injection manifolds production and injection manifolds modular and integrated single satellite and multiwell templates modular and integrated single satellite and multiwell templates subsea processing and subsea boosting stations subsea processing and subsea boosting stations flowline riser bases and export riser bases (FRB, ERB) flowline riser bases and export riser bases (FRB, ERB) pipeline end manifolds (PLEM) pipeline end manifolds (PLEM) pipeline end terminations (PLET) pipeline end terminations (PLET) T- and Y-connections T- and Y-connections subsea isolation valve (SSIV) subsea isolation valve (SSIV) subsea controls and distribution structures subsea controls and distribution structures other subsea structures other subsea structures protection structures associated with the above. protection structures associated with the above.
TASK GROUP NameCompany Charles WhiteBG Victor Jeff WhippleINTEC Eric Kim DysonINTEC Chad Matthew Ron Jon Stienar Anders
TASK GROUP NameCompany Eric Marcelo Luiz Ligeiro Roberto Maxwell Brandão de Frederico NicolettiSubsea
CURRENT STATUS Committee Draft version has been competed and passed Committee Draft version has been competed and passed –Completed April 2009 –24 pages of comments Draft International Standard version was sent to technical writer for final formatting Draft International Standard version was sent to technical writer for final formatting Draft International Standard version has been competed and accepted Draft International Standard version has been competed and accepted –Completed March 2010 –26 pages of comments (all have been addressed) –Structural steel section added (updated) Final Draft International Standard version has been competed and submitted for Ballot Final Draft International Standard version has been competed and submitted for Ballot
CURRENT STATUS Result of FDIS ballot was approved Q Result of FDIS ballot was approved Q ISO has been released ISO has been released API adopt back ballot closed November 22, 2011 API adopt back ballot closed November 22, 2011 –15 affirmative votes –2 negative votes (1 operator, 1 hardware supplier) –3 technical comments API recirculation ballot opened August 29, 2012 API recirculation ballot opened August 29, 2012
CURRENT STATUS API recirculation ballot closed September 26, 2012 (affirmed) API recirculation ballot closed September 26, 2012 (affirmed) –14 affirmative votes –5 negative votes –Document has been published with editorial comments included New work item needed to start next revision New work item needed to start next revision
NEXT STEPS Start next revision Start next revision –Major work in clause 7 (materials) –Reconsider comments from adopt back ballot
OPEN ISSUES Need new work item Need new work item