API 17P TASK GROUP January 15, 2013. BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO 13628-15 new recommended practice API 17 P.

Slides:



Advertisements
Similar presentations
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
ISO Liaison Report Hidenori Shinoda Charles Parisot.
SC18:TG8 API Specification Q1 Guidance Document.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
TGDC Meeting, Jan 2011 Review of UOCAVA Roadmap Nelson Hastings National Institute of Standards and Technology
Doc.: IEEE r0 Submission November 2002 Matthew B. Shoemake, TGg Chairperson IEEE TGg Chairs Status Update Matthew B. Shoemake TGg Chairperson.
Minutes Document March 2006 Terry Cole, AMDSlide Editor’s Best Practices Terry Cole, AMD WG Technical Editor & Simon Barber, Devicescape.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group G Report January 17, 2003
Editor’s Guideline Version 1.0
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
Status Report November 2007
Matthew B. Shoemake Task Group G Chairperson November 15, 2002
API RP 17A - Discussion Points
Submission Title: TG4m 4TV Closing Report for May 2013
doc.: IEEE <doc#>
ISO Task Group Update Wayne Mabry.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
doc.: IEEE <doc#>
Specification on float equipment
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
Standards Break Out Session
doc.: IEEE <doc#>
Task Group G Report March 10, 2003
doc.: IEEE <doc#>
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
doc.: IEEE <doc#>
IEEE Motions in July Plenary DCN:
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Specification on float equipment
doc.: IEEE <doc#>
<month year> doc.: IEEE ptc May 2013
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Submission Title: [REVCOM Submission Information]
doc.: IEEE <doc#>
Review plan of the nature reporting – update 6
September 2009 Closing Report
Submission Title: TG4m 4TV Closing Report for September 2013
Task Group G Report January 17, 2003
TG 1 November Session Opening Report
TGg Report to the IEEE Working Group
Liaison Report Date: Authors: November 2011
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP 13 June, 2012.
API 17P TASK GROUP June 26, 2013.
Standards Review Subcommittee Update
Presentation transcript:

API 17P TASK GROUP January 15, 2013

BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P / ISO new recommended practice Effort is being led by API task group Effort is being led by API task group Draft relied heavily on specifications from a number of operators Draft relied heavily on specifications from a number of operators

SCOPE production and injection manifolds production and injection manifolds modular and integrated single satellite and multiwell templates modular and integrated single satellite and multiwell templates subsea processing and subsea boosting stations subsea processing and subsea boosting stations flowline riser bases and export riser bases (FRB, ERB) flowline riser bases and export riser bases (FRB, ERB) pipeline end manifolds (PLEM) pipeline end manifolds (PLEM) pipeline end terminations (PLET) pipeline end terminations (PLET) T- and Y-connections T- and Y-connections subsea isolation valve (SSIV) subsea isolation valve (SSIV) subsea controls and distribution structures subsea controls and distribution structures other subsea structures other subsea structures protection structures associated with the above. protection structures associated with the above.

TASK GROUP NameCompany Charles WhiteBG Victor Jeff WhippleINTEC Eric Kim DysonINTEC Chad Matthew Ron Jon Stienar Anders

TASK GROUP NameCompany Eric Marcelo Luiz Ligeiro Roberto Maxwell Brandão de Frederico NicolettiSubsea

CURRENT STATUS Committee Draft version has been competed and passed Committee Draft version has been competed and passed –Completed April 2009 –24 pages of comments Draft International Standard version was sent to technical writer for final formatting Draft International Standard version was sent to technical writer for final formatting Draft International Standard version has been competed and accepted Draft International Standard version has been competed and accepted –Completed March 2010 –26 pages of comments (all have been addressed) –Structural steel section added (updated) Final Draft International Standard version has been competed and submitted for Ballot Final Draft International Standard version has been competed and submitted for Ballot

CURRENT STATUS Result of FDIS ballot was approved Q Result of FDIS ballot was approved Q ISO has been released ISO has been released API adopt back ballot closed November 22, 2011 API adopt back ballot closed November 22, 2011 –15 affirmative votes –2 negative votes (1 operator, 1 hardware supplier) –3 technical comments API recirculation ballot opened August 29, 2012 API recirculation ballot opened August 29, 2012

CURRENT STATUS API recirculation ballot closed September 26, 2012 (affirmed) API recirculation ballot closed September 26, 2012 (affirmed) –14 affirmative votes –5 negative votes –Document has been published with editorial comments included New work item needed to start next revision New work item needed to start next revision

NEXT STEPS Start next revision Start next revision –Major work in clause 7 (materials) –Reconsider comments from adopt back ballot

OPEN ISSUES Need new work item Need new work item