Presentation is loading. Please wait.

Presentation is loading. Please wait.

September 2009 Closing Report

Similar presentations


Presentation on theme: "September 2009 Closing Report"— Presentation transcript:

1 September 2009 Closing Report
Month Year doc.: IEEE yy/xxxxr0 September 2009 September 2009 Closing Report Date: Authors: Dorothy Stanley (Aruba Networks) John Doe, Some Company

2 Month Year doc.: IEEE yy/xxxxr0 September 2009 Abstract This document contains the TGv closing report for September 2009. Dorothy Stanley (Aruba Networks) John Doe, Some Company

3 Goals and Accomplishments
Month Year doc.: IEEE yy/xxxxr0 September 2009 Goals and Accomplishments Comment resolution from LB 155 Completed resolution of LB 155 comments, see Met requirements for Conditional Approval for Sponsor Ballot Report in Teleconferences, ad-hoc None Dorothy Stanley (Aruba Networks) John Doe, Some Company

4 Comment Processing Summary
Month Year doc.: IEEE yy/xxxxr0 September 2009 Comment Processing Summary Total 24 Technical 12 Editorial Editor Done/To Do 24/0 – No changes to the draft Comment resolutions adopted to date 21, 3 withdrawn Comments remaining Dorothy Stanley (Aruba Networks) John Doe, Some Company

5 Month Year doc.: IEEE yy/xxxxr0 September 2009 Output Documents v-TGv-September-2009-closing-report.ppt v-September-2009-agenda.ppt v-September-2009-meeting notes Dorothy Stanley (Aruba Networks) John Doe, Some Company

6 Motion – Approve LB155 Comment Resolutions
Month Year doc.: IEEE yy/xxxxr0 September 2009 Motion – Approve LB155 Comment Resolutions Move to adopt the comment resolutions in as the approved comment resolutions for TGv Draft 7.0 LB 155 comments. Moved: Allan Thomson Seconded: Qi Wang Result Motion Passes Dorothy Stanley (Aruba Networks) John Doe, Some Company

7 Motion – Approve Report on Conditional Approval Requirements
Month Year doc.: IEEE yy/xxxxr0 September 2009 Motion – Approve Report on Conditional Approval Requirements Approve document as the report to the 802 Executive Committee (EC) showing that P802.11v has met the conditional requirements to proceed to sponsor ballot. Moved: Allan Thomson Seconded: Qi Wang Result Motion passes Dorothy Stanley (Aruba Networks) John Doe, Some Company

8 TGv Timeline – Updated Sept, 2009
Month Year doc.: IEEE yy/xxxxr0 September 2009 TGv Timeline – Updated Sept, 2009 Initial Working Group Letter Ballot: July 07 – completed Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0 Re-circulation Working Group Letter Ballot: November 08 (D4.0) Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged) Form Sponsor Ballot Pool: August 09 (was June 09) Initial Sponsor Ballot: Oct 09 Oct 09 – D7.0 (was Sept 09) Approved Sponsor Ballot: Nov 09 Jan 09 – D8.0, Feb D9.0, March D10.0, April D11.0 May 12th ( or so) for Revcom June Approval Final WG/EC Approval: July 2010 RevCom/Standards Board Approval: June 4th/June 5th(or so) Note: TGv PAR is authorized through Dec 2010 Dorothy Stanley (Aruba Networks) John Doe, Some Company

9 Goals for November 2009 Comment resolution on Initial Sponsor Ballot
Month Year doc.: IEEE yy/xxxxr0 September 2009 Goals for November 2009 Comment resolution on Initial Sponsor Ballot Recirculation Sponsor Ballot Dorothy Stanley (Aruba Networks) John Doe, Some Company

10 References September 2009 Month Year doc.: IEEE 802.11-yy/xxxxr0
Dorothy Stanley (Aruba Networks) John Doe, Some Company


Download ppt "September 2009 Closing Report"

Similar presentations


Ads by Google