1 API 17P TASK GROUP June 26, 2013

2 BACKGROUND NWI Initiated in 2006
API 17 P / ISO new recommended practice Effort is being led by API task group Draft relied heavily on specifications from a number of operators

3 SCOPE production and injection manifolds
modular and integrated single satellite and multiwell templates subsea processing and subsea boosting stations flowline riser bases and export riser bases (FRB, ERB) pipeline end manifolds (PLEM) pipeline end terminations (PLET) T- and Y-connections subsea isolation valve (SSIV) subsea controls and distribution structures other subsea structures protection structures associated with the above.

4 TASK GROUP Name Company E-mail Charles White BG Norge
Victor Vargas FMC Jeff Whipple INTEC Engineering Eric Baltmanis ExxonMobil Kim Dyson Chad Hughs Chevron Matthew Herrold BP Ron Pfluger Cameron Jon Stienar Knutsen Statoil/Hydro Anders Husby DnV

5 TASK GROUP Name Company E-mail Eric Hevle Nexen eric_hevle@nexen.com
Marcelo Luiz Ligeiro Barbosa Petrobras Roberto Martins FMC Maxwell Brandão de Cerqueira Frederico Nicoletti Subsea 7

6 CURRENT STATUS Committee Draft version has been competed and passed
Completed April 2009 24 pages of comments Draft International Standard version was sent to technical writer for final formatting Draft International Standard version has been competed and accepted Completed March 2010 26 pages of comments (all have been addressed) Structural steel section added (updated) Final Draft International Standard version has been competed and submitted for Ballot

7 CURRENT STATUS API adopt back ballot closed November 22, 2011
Result of FDIS ballot was approved Q3 2011 ISO has been released API adopt back ballot closed November 22, 2011 15 affirmative votes 2 negative votes (1 operator, 1 hardware supplier) 3 technical comments API recirculation ballot opened August 29, 2012

8 CURRENT STATUS API recirculation ballot closed September 26, 2012 (affirmed) 14 affirmative votes 5 negative votes Document has been published with editorial comments included API 17 P 1st edition published Jan 30, 2013

9 NEXT STEPS Start next revision Major work in clause 7 (materials)
Reconsider comments from adopt back ballot

10 OPEN ISSUES Need new work item for next revision


Download ppt "API 17P TASK GROUP June 26, 2013."