Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Architecture CAD living sleeping service SPACE PLANNING
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Competency: Draw Floor Plans Objective: Analyze accepted principles of single-view residential space planning.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
Understanding House Plans
House Plans and Home Design. House Plan Symbols Wall: Window: Door: Shower: Tub: Toilet:
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
Room Planning, and living area
Room Planning Living Area 1.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
After studying this unit, you will be able to: Interpret architectural drawings Describe how computers can assist in understanding house plans Organize.
Building Codes and Interior Design
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Room Relationships and Sizes
Room Relationships and Sizes
Room Relationships and Sizes
Grace Bible Church Ministry Goals & Master Plan Presentation.
Building Codes Intended to protect the public by establishing minimum standards of building safety.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
Affordable housing project
Capital Improvement Program for September 9, 2014.
LIVING AREAS. Living area Part of the house that friends and guest see. It is usually a place of show, recreation and entertainment. It roughly consumes.
Data Center Facility & Services Overview. Data Center Facility.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Building 185 Orientation Briefing 101 Nelson Drive Offutt AFB,
Learning, Health, and Safety Capital Project Alternates and Change Order
Southeast Financial Center
Drafting 2 (Arch) Quiz Review #2 Quiz Review. 1.Name the building parts that have been preassembled either in a plant or on-site. Sills Jambs Mullions.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Residential planning. Zones Social: public area and most used portion of the home. Comprised of the entry, family room, living room, media room, game.
House Project.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
Planning Electrical Circuits Original by Ryan Talton Modified by Georgia Agriculture Education Curriculum Office –June 2004.
DURHAM COUNTY COURTHOUSE. Current Judicial Building 18 deputies total Main judicial Building has 17 courtrooms  13 deputies working plus 2 supervisors.
IET 120 Project #4 Matthew Porter Construction Project.
Standard  Students will prepare residential floor plans.
White Pigeon Community Schools
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Pond-Front In Hamlin Plantation!
Bell Work Answer the following review questions. You may use your notes. What does the term “scale” mean? What does the term “proportion” mean?
Drawing Floor Plan.
Cornwall Central School District
Amazing Natural Light & Great Outdoor Living
Wilson Hall Fire Protection Features
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
Logans Bridge Cottage.
How & When to Get Permits for Work in Your Home
Alorro Designs.
CV Futures Task Force Report May 8, 2017
Our Vision Chickasaw Point - An inviting community on Lake Hartwell where residents work, play and enjoy life together ”A welcoming place to.
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Master Facilities Committee Evaluation and Identification
Building standards Mr. Da Silva.
Floor Plans and Symbols
Stoughton Public Library
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
Presentation transcript:

Houston TranStar Building Expansion 2009 Status

Aerial of Existing Building

Existing Building Diagram on Aerial Imagery

Existing Building Diagram

Project History: Original Center was opened in 1996 Functions have been added to the original mission of the Center from time to time Space Study was completed to address housing of these additional functions in 2004 Preliminary studies for placing Harris County Sheriff dispatch functions at the Center were made in 2006 Federal Funds were approved for priority transportation and emergency management expansion projects in 2007 Local Funding for Sheriff expansions failed to pass approval in 2007 Projects to be constructed by Federal funds were prioritized in 2008

Master Plan Project Priorities:

Federal Funding (TxDOT Account Numbers) TxDOT ACCOUNT NUMBER APPROVED AMOUNT FOR PROJECT $ 2,625, $ 3,038, $ 2,625,000 TOTAL$ 8,288,766

1. Computer Room Expansion MARIO RODRIQUEZ HAS SOME PRELIMINARY PLANS FOR COMPUTER ROOM Office layout has changed some since that design. Mostly the same Sq ft expansion of equipment and office space (all raised flooring) Additional A/C Chiller and upgrade A/C plumbing to bigger feed lines Additional electrical service

1. Computer Room Expansion

2. Disaster Support Center Minimum of 4700 Sq ft Auditorium, Toilets, Showers, Locker Rooms Enclosed Loading Dock with Garage Door

2. Disaster Support Center

3. Second Floor Traffic Operations

4. Second Floor Conference Suite 2064 sq ft Extend existing Conference Room and add sliding divider. Add adjacent offices.

4. Second Floor Conference Suite

5. Third Floor EOC and Police Center 3600 Sq ft expansion and 3933 Sq ft interior office partitions in existing shell. General Office, cubicals, and radio equipment room.

5. Third Floor EOC and Police Center

6. Generator Access Room Utility room to connect main building to emergency generator building for access to generator during hurricanes. Also used as storage and building maintenance shop (833 sq ft).

6. Generator Access Room

7. Elevator Installation Second existing shaft with pit next to existing elevator in Lobby Equipment and Installation Equipment room already sized for second elevator

7. Elevator Installation

8. Front Entrance Security Project ROBERT PERRY HAS PLANS FOR FRONT ENTRANCE WITHOUT BULLET PROOF INTERIOR GLASS STOREFRONT Enlarge Foyer into exiting porch. Sliding front doors. Rolldown storm doors. Construct new porch with handicap ramps and planters. Storm resistant windows to outside, bullet proof storefront panels to lobby side

8. Front Entrance Security Project

Bullet Proof Glass and Sliding Doors

9. Emergency Kitchen Minimum of 500 Sq ft Replace existing Men’s & Women’s showers with kitchen equipment With counters opening into existing break room. Demolish existing kitchen space & extend break room into that space.

9. Emergency Kitchen

10. Transportation Control Room Support Suite Minimum of 2400 Sq. ft. Expand control Room into existing Viewing Room. Close hallway and move walls to change size of four offices Move doors and add two more offices at front of control room

10. Transportation Control Room Support Suite

11. Public Parking Expansion Minimum of 5200 Sq ft. Add concrete paving Move security gate and fencing

11. Public Parking Expansion