PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.

Slides:



Advertisements
Similar presentations
Watch the following video and answer the questions on your question sheet. Importance of Testing.
Advertisements

C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
IMPACT Report SSMO Receiving Review– January 23, 2007.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
1 PFP MSR, 8/21/2012 Particles and Fields Package Monthly Status Review (MSR) August 21, 2012 Dave Curtis, PFP PM.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
18-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Package Dave Curtis, PFP Package Manager Mars.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
GLAST Large Area Telescope:
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
Start Counter Construction Update Eric Pooser 08/21/2014.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
MAVENIPSR3 - SWEA – March 1, SWEA Particles and Fields Package Pre-Ship Review March 1, 2013 Project-Level Assessment Jim Morrissey, MAVEN ISM Mars.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
SPICA / AIV&T issues Spacecraft test program & model philosophy
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
S-17 Reference Model Status Robin Lafever 21 October 2004.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
1 PFP QSR, 10/9/2012 Particles and Fields Package Quarterly Status Review (QSR) October 9, 2012 Dave Curtis, PFP PM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
SPP Fluxgate MAG input to FIELDS Quarterly Review – 7/18/2013 Bob MacDowall, Ron Oliversen, Dave Sheppard, Scott Murphy, Jim Odom, Jack Connerney.
CONTROL SYSTEM: RISK IDENTIFICATION AND MITIGATION PLAN Françoise GOUGNAUDJanuary 14th
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
1 PFP MSR, 9/18/2012 Particles and Fields Package Monthly Status Review (MSR) September 18, 2012 Dave Curtis, PFP PM.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
Torsten Böker TIPS May 16, 2002 status Instrument status 1) Final temperature adjustment 2) Fine Optical Alignment 3) Remaining SMOV timeline.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
FIELDS MEP Thermal Vacuum Cycling iPER
SWEA sensor FM model work remaining before delivery
GLAST Large Area Telescope:
Gayle K. Martin November 14, 2016
SPF MAG Quarterly Report – Feb 2015
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Particles and Fields Package Quarterly Status Review (QSR)
Integration and Test Organization Chart
Presentation transcript:

PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment shims not flat re-shimmed, CLOSED –SEP temperature sensor noise Temp sensors relocated; now quiet, CLOSED –SEP Heater noise (from TAME) Plan to shield heaters; works on EM, installed on FM this week? –MAG temperature monitor offset Monitor temperature calibration updated. –Missing Time Update Counter Spacecraft flight software fix planned –SASM/LPW timing offset Phase difference identified (on PFP side) Identified an operational fix, which works on EM but has not yet been tested on FM

SWEA Status High Voltage Discharges and instability in Thermal Vac Reworked instrument to stabilize over temperature and reduce the risk of discharges and reduce the risk of damage should a discharge occur Instrument reassembled and in test: –Test in calibration chamber with high voltage, no issues –Vibrated, no issues –Tested again in calibration chamber, no issues – In thermal vacuum, no problem with first few cycles High voltage powered on Cycle 5 (2/19) with no problems –Post-environmental; calibration next week Pre-Ship Review Friday 3/1; Delivery to LM Monday 3/4, ready for integration after bench test, as soon as the afternoon of 3/5.

SWEA In Calibration Chamber