Building Project Milestone December 16, Lantana Road, Lake Worth, FL 33467
Project in Progress: 11/11/2007 – ERM allowed us to plant trees instead of paying for the trees, savings at least $100K 11/26/2007 – Audio design complete 11/30/2007 – Pew layout finalized
Sanctuary Height: 20’ Platform to Ceiling: 16’
Where are we now Consolidating Audio design to the master architecture drawings to begin the engineering drawings (Jon Deng, John Pang)
Prayer Items Building Permit Submittal by March –For architect Steve Brock in the design phrase (structural, electrical and mechanical engineering) –For applying for the tree removal permit For timely & accurate project cost estimate from General Contractor (Chuck Clark) For all consultants under contracts to assist us For all Plan and Permits review for speedy approval For church unity, wisdom and passion