Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

Similar presentations


Presentation on theme: "1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base."— Presentation transcript:

1 1 Final Estimates and Asphalt Reports

2 2 Setting Spread Rate For Asphalt Base

3 3 Setting Spread Rate For Asphalt Super-pave Concrete

4 4 Setting Spread Rate For Asphalt Concrete Friction Course

5 5

6 6

7 7 Roadway Target Spread Rate  The Target for Traffic Level D, Design Mix SP 04-3807, Coarse SP-9.5 with a gmm of 2.339.  43.3 lbs./SY x 2.339 = 101.28 Lbs/SY/in.  101.28 Lbs/ in. x 1.5” = 151.92 lbs./SY or a target of 152 lbs./SY  +/- 5%  Minimum = 144.4 lbs/SY  Maximum = 159.6 lbs/SY

8 8 Asphalt Road Reports

9 9

10 10 Target Spread Rate Set

11 11

12 12 Asphalt Road Report Header

13 13

14 14

15 15

16 16

17 17

18 18

19 19 330-2.2 Minimum Process Control Testing Requirements  5. Monitor the mix spread rate at the beginning of each day’s production, and as needed to control the operations, at a minimum of once per 200 tons (200 metric tons) placed to ensure that the spread rate is within 5% of the target spread rate. When determining the spread rate, use an average of five truckloads of mix.  If the Contractor fails to maintain the construction process in accordance with the approved Quality Control Plan, the Engineer may elect to stop the construction operation at any time until the deficiencies are corrected.

20 20

21 21 Target and Actual Spread Rate

22 22

23 23 Paving Completed

24 24 Pay Is Limited To 105% Of Set Spread Rate

25 25

26 26 Lot Density

27 27 How the Quantities of Density and Non-Density Tons Affect the Composite Pay Factor (CPF)

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39 Plant Reports

40 40

41 41

42 42 Lot Submittal Package

43 43

44 44

45 45

46 46

47 47

48 48

49 49

50 50

51 51


Download ppt "1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base."

Similar presentations


Ads by Google