7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010.

Slides:



Advertisements
Similar presentations
Doc.: 18-11/58r0 Submission July 2011 John Notor, Notor ResearchSlide 1 Summary of ITU-R Documents Notice: This document has been prepared to assist IEEE.
Advertisements

DOCUMENT #:GSC16-PLEN-xx FOR:Presentation SOURCE:TIA AGENDA ITEM:OPENING PLEN X.1 CONTACT(S): Fran O’Brien Mark Epstein.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
DOCUMENT #:GSC15-PLEN-11 FOR:Presentation SOURCE:TTA AGENDA ITEM:Plenary 4.8 TTA activities since GSC14 Keun Hyeob LEE, TTA President.
DOCUMENT #:GSC15-PLEN-14 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.1 CONTACT(S):Asok Chatterjee
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document.
1 ITU-R Liaison Group Report - Session #69 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0087r1.
Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration Updated CCSA Activities on IMT Standardization and industry in China Ke Wang, CCSA Document.
DOCUMENT #:GSC15-PLEN-13r1 FOR:Presentation SOURCE:ARIB AGENDA ITEM:OPENING PLEN 6.1 CONTACT(S):Kohei Satoh Update ARIB.
DOCUMENT #:GSC15-PLEN-69; GSC15-GRSC8-10 FOR:Presentation SOURCE:ARIB AGEND ITEM:OPENING PLEN 12.2; GRSC 7.1 CONTACT(S):Kohei Satoh
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04r1 Source:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
ITU-R Liaison Group Report - Session #73 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0020 Date.
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
ITU-R Liaison Group Report - Session #63.5 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0111r1.
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
1/6 CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China CJK-IMT Possible Contribution to 11 th Meeting of WP5D ~ Related to Report ITU-R.
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/7 CJK-IMT Way forward on Chapter 4 of CJK White Paper by SIG-Future IMT ATARASHI,
WP5D Meeting Results Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Results of 10 th Meeting of WP 5D in Are ~ WG Spectrum Aspects ~ TANNO,
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
Doc.: IEEE Submission May 2008 Michael Lynch, Nortel Networks RR-TAG Opening Report Report on March 2008 plenary meeting.
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Doc.: IEEE /0172r0 Submission January 2008 Bruce Kraemer (Marvell); Darwin Engwer(Nortel)Slide 1 IMT-Advanced Opening Report Date:
Doc.: IEEE /0004r0 Submission Jan 2016 Andrew Myles, CiscoSlide 1 Next steps for IEEE as an IMT-2020 technology? 18 Jan 2015 Authors: NameCompanyPhone .
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
1July 12th, 2002 S00VISION Update of Vision Issues in ITU-R WP 8F Christine Di Lapi Motorola Inc. Global Government Relations PH:
Jeju, 13 – 16 May 2013Standards for Shared ICT Stephen Hayes Director of North American Standards Ericsson ATIS Activities on IMT Standards Document No:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Possible Contribution to 11th Meeting of WP5D ~ Related to Updating of.
Realizing Green ICT Dream with TTA Review of General WG activities at ITU-R WP5D#10 CJK IMT 28 Xi’an (西安), China June 2 ~ 3, 2011 SONG, Juyeon Samsung.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010 Copyright Statement. Alcatel-Lucent grants a free, irrevocable license.
ITU-R activities on WRC-19 AI 1.12
HEADING FOR SLIDE Sub Heading
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
GSC IMT Task Force Report
ITU-R WP5D Preliminary Update – February 2009 Geneva Switzerland
ITU-R Liaison Group Report - Session #68 Opening Plenary
TTA activities on IMT-Advanced Standardization
IMT-2020 Contribution Content
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for January 2017]
ITU-R Liaison Group Report - Session #62 Opening Plenary
ATIS Activities on IMT Standards
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
TTA′s Transposing Plan Mar
Sergio Buonomo Counselor ITU-R Study Group 5
GSC IMT Task Force Report
Update of ARIB Activities on IMT Standardization
ITU-R Liaison Group Report - Session #65 Opening Plenary
GSC IMT Task Force Report
Status report from ITU-R WP 5A on ITS activities
GSC IMT Task Force Report
ITU-R Liaison Group Report - Session #65 Opening Plenary
Activities of ARIB on IMT Standards
GSC IMT Task Force Report
TTA activities on IMT-Advanced Standardization
TTA Activities on IMT-Advanced standardization
Presentation transcript:

7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010

2 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  SWG M.1457 (SWG IMT.SPECS)  The updated final material should be submitted for all six technologies by the June meeting.  It was clarified that the Roadmap is focusing on Rec. ITU-R M.1457 as the title suggests, and it was also noted that this is indeed a living document, subject to continuous changes and updates.  Input contributions are invited on this topic for the next meeting –It was commented that the Roadmap should be in terms of functionalities rather than standards might be helpful. –For the time being, a footnote was added to the updated Roadmap and it was clarified that the information toward IMT-Advanced is included for information only.

3 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  General Aspects  General Aspects is considering updating the Handbook and Supplement 1  The group will seek input from ITU-T and ITU-D for their intention, because the Handbook has been developed by all three sectors.  A drafting group was established to consider what area is required for the update. It was also suggested to consider the work of WP5D of the supplement to update the Guidelines on the Smooth Transition of Existing Mobile Networks to IMT-2000 for Developing Countries (GST).  Work for timeframe  The meeting generally agreed with the principles that the mobile broadband industry’s mission is to continue meeting the demands of consumers by advancing the IMT service offerings and provide even higher data rate connectivity.  Therefore it is necessary to provide equally high data rate services and quality to the mobile broadband consumer

4 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  General Aspects: Work for timeframe  Two general points were highlighted that would be useful for the future work on IMT:  take into account new behaviors, particularly while considering the usages of smart phones and personal computer devices  longer term aspects by means of new estimations and market forecasts  In the light of these increasing consumer demands, mobile data traffic, subscriber numbers and forecasts, the meeting deemed to be very timely to review and consider existing and new operational requirements for current and future developments of terrestrial IMT networks.  Members are invited to contribute on this to the next meetings of WP5D.

5 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  SWG Coordination  The group reviewed documents by the technology proponents (for IEEE Evaluation Coordination meeting and for 3GPP Evaluation Workshop) and the Correspondence Group activities held after the 6th meeting of WP 5D.  SWG Coordination acknowledged that the activities were successful in providing the Independent Evaluation Groups with sufficient information for external evaluations. It was agreed that the Correspondence Group would continue as scheduled.  SWG Coordination also noted that a 2nd Evaluation Coordination meeting and a 2nd Evaluation Workshop are planned in May 2010.

6 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  SWG Coordination  Preliminary/interim evaluation reports on the candidate technologies:  They are from ten Independent Evaluation Groups in twelve contributions, that are 5D/650 (ChEG), 5D/651 (WFEG), 5D/652 (TTA), 5D/653 (TTA), 5D/657 (TCOE India), 5D/661 (WINNER+), 5D/662 (REG), 5D/667 (WCAI), 5D/668 (CEG), 5D/669 (TR-45), 5D/670 (ATIS), and 5D/671 (ATIS).5D/6505D/6515D/6525D/6535D/6575D/661 5D/6625D/6675D/6685D/6695D/6705D/671  SWG Coordination reviewed all the preliminary/interim evaluation reports in the administrative aspects and agreed that evaluations in the Independent Evaluation Groups are on track for final evaluation reports submitted in June 2010

7 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  SWG Coordination  Other business  SWG Coordination noted that the open area rural model with low mobility presented should be discussed after 7th meeting of WP 5D. A new topic for this question should be created under Forum 3 of the Correspondence Group for IMT-Advanced Evaluation. Contributions are encouraged on a way forward for the open area rural model with low mobility.

8 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  Evaluation  The SWG considered the following Documents to this meeting:  5D/630 (China, Korea, Japan), 5D/645 (China), 5D/650 (ChEG), 5D/651 (WFEG), 5D/652 (TTA PG707), 5D/653 (TTA PG707), 5D/657 (TCOE India), 5D/660 (WINNER+), 5D/661 (WINNER+), 5D/662 (REG), 5D/667 (WCAI EG), 5D/668 (CEG), 5D/669 (TR-45), 5D/670 (ATIS), 5D/671 (ATIS), 5D/674 (Correspondence Forum Convener). 5D/6305D/6455D/6505D/6515D/6525D/653 5D/657 5D/6605D/661 5D/662 5D/667 5D/668 5D/669 5D/6705D/671 5D/674

9 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  SWG Sharing SWG Sharing  Revision of Report ITU-R M.2039 Revision of Report ITU-R M.2039  At the 5th meeting, Working Party 5D had agreed to initiate a this revision to include the technical and operational characteristics for IMT-2000 systems to be used in sharing studies applicable to the frequency bands identified for IMT at WRC-07 and developed a detailed workplan accordingly. At the 5th meeting, Working Party 5D had agreed to initiate a this revision to include the technical and operational characteristics for IMT-2000 systems to be used in sharing studies applicable to the frequency bands identified for IMT at WRC-07 and developed a detailed workplan accordingly.  Received two contributions (Documents 5D/624 and 5D/635) proposing text for the revision of Report ITU-R M Received two contributions (Documents 5D/624 and 5D/635) proposing text for the revision of Report ITU-R M  Additionally, a Liaison statement to External Organizations was developed to facilitate the revision of this report. Additionally, a Liaison statement to External Organizations was developed to facilitate the revision of this report.

10 | ITU-R WP5D Meeting Summary |March 2010 ITU-R WP5D Meeting Summary – February 2010  SWG Sharing  PDNR ITU-R M.[IMT-MITIGATION] PDNR ITU-R M.[IMT-MITIGATION] –As agreed at the previous meeting of Working Party 5D, Drafting Group IMT.MITIGATION developed a working document towards a PDNR ITU-R M.[IMT.MITIGATION] based on three input contributions (Documents 5D/625, 5D/633 and 5D/664).As agreed at the previous meeting of Working Party 5D, Drafting Group IMT.MITIGATION developed a working document towards a PDNR ITU-R M.[IMT.MITIGATION] based on three input contributions (Documents 5D/625, 5D/633 and 5D/664). –Furthermore, two Liaison statements were developed to Working Party 4A and to External Organizations to facilitate the further development of this working document at the next meeting.Furthermore, two Liaison statements were developed to Working Party 4A and to External Organizations to facilitate the further development of this working document at the next meeting.  Antenna isolation of base stations Antenna isolation of base stations –Six input contributions had been received (Documents 5D/606, 5D/639, 5D/641, 5D/646, 5D/649 and 5D/673) related to the working document towards a PDN Report working document towards a PDN Report on isolation for antennas of base stations in the land mobile service including IMT.Six input contributions had been received (Documents 5D/606, 5D/639, 5D/641, 5D/646, 5D/649 and 5D/673) related to the working document towards a PDN Report working document towards a PDN Report on isolation for antennas of base stations in the land mobile service including IMT. –Based on these input contributions and further discussion at the meeting, Drafting Group Antenna Isolation further developed the working document towards a PDN Report.Based on these input contributions and further discussion at the meeting, Drafting Group Antenna Isolation further developed the working document towards a PDN Report. –Additionally, a liaison statement to Working Parties 1A and 5A was developed to inform them about the progress of work on this topic.Additionally, a liaison statement to Working Parties 1A and 5A was developed to inform them about the progress of work on this topic.