Presentation is loading. Please wait.

Presentation is loading. Please wait.

ITU-R Liaison Group Report - Session #68 Opening Plenary

Similar presentations


Presentation on theme: "ITU-R Liaison Group Report - Session #68 Opening Plenary"— Presentation transcript:

1 ITU-R Liaison Group Report - Session #68 Opening Plenary
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date Submitted: Source: Reza Arefi Voice: Intel Corporation Venue: IEEE Session #68, WG Opening Plenary Base Contribution: None. Purpose: ITU-R Liaison Group presentation to Opening Plenary of the WG, containing plan for the week Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.

2 ITU-R Liaison Group Report - Session #68 Opening Plenary
Reza Arefi 802.16’s ITU-R Liaison Official IEEE Session #68 San Diego, USA, July 2010

3 Relevant Documents from Previous Sessions
IEEE L /0017r2 IEEE ITU-R Liaison Group Workplan IEEE L /0057r1 ITU-R Liaison Group Report to Closing Plenary of Session #67 ========== Also =========== IEEE L /079 IEEE IMT-Advanced review process (IEEE /r6)

4 Input Documents for Session #68
Liaisons IEEE L /0069 Notice of Approval of Rec. ITU-R M ( ) IEEE L /0071 Liaison Statement to Independent Evaluation Groups for Final Evaluation Reports ( ) Contributions None.

5 Proposed Objectives for Session #67
per Workplan Examination of finalized Independent Evaluation Group reports Review outcome of WP 5D #8 w.r.t. IMT-Advanced evaluations and next steps Prepare contribution to WP 5D on external evaluation matters including questions raised in ITU- R CG Prepare input material for WP 5D Workshop on IMT for the Next Decade (October 2010)Note 1 Prepare a contribution to WP 5D on IMT.UPDATE Prepare meeting X contribution for M Note 2 Review any IMT-Advanced related contributions to ITU-R with Review any ITU-R liaison statements/contributions with Approve any ITU Liaison and/or contributions including on IMT-Advanced at the EC beyond Workplan Review input contributions and take appropriate action Review input liaison statements and prepare responses as appropriate, including initiation of development of a contribution to WP 5D on IMT.RSPEC Update ITU LG workplan as appropriate Note 1: This workshop has been postponed to a later date. Note 2: To be postponed. This will not happen until 2011.

6 Proposed Agenda for the Week
Introduction, approval of the agenda Review and follow workplan of IEEE L /0017r2 Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary Update workplan Approve all outgoing documents Other business

7 Proposed schedule for the Week (Room: Esquire 2)
Monday Tuesday Wednesday Thursday AM 09:00 to 13:00 1) Introduction, approval of the agenda 2) Review and follow workplan of IEEE L /0017 3) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary 4) Update Workplan 5) Approve all outgoing documents PM 14:30 to 19:00 6) Other business

8 Update on ITU-R IMT-Advanced process

9 Summary of Oct. 2009 ITU-R WP5D #6
Six proposals received by Oct 7, the IMT-Advanced proposal submission deadline Proposal based on (from IEEE, Japan, TTA) Proposal based on LTE-Advanced (from 3GPP, Japan, China*) Reviewed all proposal submissions at the 6th ITU-R WP5D meeting of Oct in Dresden, Germany Considered as two technologies IEEE Technology (three proposals are technically identical) 3GPP Technology (three proposals are technically identical) All proposals considered “complete submissions” Step 3 (proposal submissions) completed and Step 4 (external evaluations) initiated Correspondence Group (CG) formed to facilitate external evaluations Evaluation Groups presented in 3rd IMT-Advanced Workshop * China proposed only TDD component of LTE-Advanced (TD-LTE-Advanced)

10 Summary of Feb. 2010 ITU-R WP5D #7
12 IEGs submitted preliminary evaluation reports IMT.RADIO – See C /0014 IMT.RSPEC – See C /0014 2nd IEEE IMT-Advanced Evaluation Group Coordination Meeting – 17 May 2010, Beijing, China

11 IMT-Advanced Process We are here

12 Outcome of WP 5D #8 Evaluation Reports from external evaluation groups were presented and reviewed (see next slide) WP 5D developed acknowledgments back to evaluation groups (IMT-ADV documents) WP 5D agreed that steps 4 and 5 of the process are COMPLETE WP 5D preliminary concluded that step 6 is also complete Started filling out of M.2113 compliance templates which contains WP 5D view that both technologies meet the requirements To be included in IMT.RADIO  to be finalized at 5D#9

13 Doc. # Source Comments 781 CEG 780 REG 779 WFEG 769 WINNER+ 763 ChEG
Complete set of evaluations for both IEEE and 3GPP Technologies Note: Contains weird DL FDD cell SE results, which can be said for both IEEE and 3GPP Technologies, i.e. 2x2 SU-MIMO results are better than 4x2 MU-MIMO results 780 REG Presentation slides on [ 743 ] 779 WFEG Complete set of evaluations only for IEEE Technology 769 WINNER+ Complete set of evaluations only for 3GPP Technology Note 1: Some conservative cell SE results can be found Note 2: Including some results for India OARM environment 763 ChEG ChEG's evaluation results on TDD RIT of 3GPP Technology (TD-LTE-Advanced) for India OARM environment 760 Complete set of evaluations only for 3GPP Technology 757 TCOE India Presents UMi/UMa/RMa/OARM results for both 3GPP and IEEE Technologies Note 1: 2x2 antenna configuration in DL (i.e. different from proponents' assumptions - 4x2 or 8x2 (only in 3GPP)) Note 2: MU-MIMO + CDR 750 WCAI EG 743 Almost complete set of evaluations for both IEEE and 3GPP Technologies Note: Including DL TDD/FDD cell/cell-edge SE results for India OARM environment 740 TTA PG707 Complete set of evaluations only for IEEE Technology Note: Including DL TDD cell/cell-edge SE results for India OARM environment 739 736 TIA TR-45 Complete set of evaluations for both IEEE and 3GPP Technologies 717 ATIS WTSC Complete set of evaluations for 3GPP Technology 716 Complete set of evaluations for IEEE Technology 715 ETSI Just an activity report, no evaluation results at all 710 Israeli EG Partial evaluations for IEEE Technology Note: Only DL TDD RMa cell/cell-edge SE results in simulations are presented i.e. no results for other scenarios and no VoIP/Mobility results

14 Expectations for WP 5D Meeting #9
Expect to complete Step 6 and Step 7 Step 6: Review to assess compliance with minimum requirements Step 7: Consideration of evaluation results, consensus building and decision Finalize IMT.RADIO Announce final decision on IMT-Advanced technologies

15 ITU-R Action/Deliverable/Milestone
Activity Start Stop ITU-R Action/Deliverable/Milestone WP 5D Meeting #8 9 Jun. 10 16 June 10 Liaison to External Organizations on the procedural details and detailed timelines for the completion of draft new Rec. ITU‑R M.[IMT.RSPEC]. RIT/SRIT Proponents - Due to ITU-R by 6 Oct. 10 Delivery to ITU-R by RIT/SRIT Proponents of Form A. See Item 4 (Table 3). WP 5D Meeting #9 13 Oct. 10 20 Oct. 10 WP 5D takes note of the Form A’s in order to determine the structure of draft new Rec. ITU-R M.[IMT.RSPEC]. WP 5D provides liaisons to RIT/SRIT Proponents and GCS Proponents. GCS Proponents Due to ITU-R by 2 Mar. 11 Delivery to ITU-R by the GCS Proponents of the Overview and either titles and synopsis of the GCS, or the Directly Incorporated Specification when GCS is not utilized. See Item 1(Table 2). Delivery to ITU-R of the Global Core Specifications by the GCS Proponents. Detailed transposition references would not be required at this point. See Item 2 (Table 2). Delivery to ITU-R of Certification B by GCS Proponents. See Item 5 (Table 3). WP 5D Meeting #10 9 Mar. 11 16 Mar. 11 WP 5D takes note of the Certification B’s. WP 5D finalizes and preliminarily agrees draft new Rec. ITU-R M.[IMT.RSPEC] (not necessarily including the detailed transposition references). WP 5D Liaison of the preliminary WP 5D agreed draft new Rec. ITU-R M.[IMT.RSPEC] to the relevant GCS Proponents and authorized Transposing Organizations for their use in developing their inputs of the detailed references. WP 5D Meeting #11 15 Jun. 11 22 Jun. 11 WP 5D addresses responses from External Organizations on draft new Rec. ITU-R M.[IMT.RSPEC] Transposing Organization (in the case of a GCS being utilized)s Due to ITU-R by 21 Sep. 11 Delivery to ITU-R of transposition references by each Transposing Organization for incorporation into the WP 5D preliminary agreed draft new Rec. ITU-R M.[IMT.RSPEC] See Item 3 (Table 2). Delivery to ITU-R of Certification C by each Transposing Organization. See Item 6 (Table 3). WP 5D Meeting #12 12 Oct. 11 19 Oct. 11 WP 5D reviews and agrees the completed draft new Rec. ITU-R M.[IMT.RSPEC] (which now includes all transposition references) and forwards to Study Group 5 Radiocommunication Bureau 14 Nov. 11 Submission by Counsellor for SG 5 of completed draft new Rec. ITU-R M.[IMT.RSPEC] (with all transposition references) to SG 5, based on currently anticipated SG 5 meeting schedule Study Group 5 21 Nov. 11 22 Nov. 11 Study Group 5 considers adoption of the new Rec. ITU-R M.[IMT.RSPEC] for forwarding to the Radiocommunication Assembly for approval. Radiocommunication Assembly 16 Jan. 12 20 Jan. 12 Radiocommunication Assembly considers approval of Rec. ITU-R M.[IMT.RSPEC]

16 Evaluation Groups – Evaluation plans as of now
ARIB Evaluation Group: No plans for further evaluation work ATIS WTSC: Both technologies, submitted prel. report Canadian Evaluation Group (CEG): Both technologies, submitted prel. report Chinese Evaluation Group (ChEG): Both technologies, submitted prel. report ETSI: ? Israeli Evaluation Group (IEG): Both technologies but priority with IEEE technology Russian Evaluation Group (REG): IEEE technology, submitted prel. report TCOE India: Both technologies, submitted prel. report TR-45: Both technologies, submitted prel. report TTA PG707: Both technologies but only FDD for LTE-Advanced, submitted prel. Report WiMAX Forum Evaluation Group (WFEG): priority with IEEE technology, submitted prel. report Wireless Communications Association International (WCAI EG): Both technologies, will start with IEEE first, submitted prel. report WINNER+: LTE-Advanced, submitted prel. report

17 Feb 17-24, 2010 – 7th ITU-R WP5D Meeting in Turin, Italy
Key Milestones Dec 17-18, 2009 – 3GPP Workshop on LTE- Advanced Evaluation in Beijing, China Jan 13, 2010 – IEEE IMT-Advanced Evaluation Group Coordination Meeting in San Diego, USA Feb 17-24, 2010 – 7th ITU-R WP5D Meeting in Turin, Italy EGs to submit “preliminary” evaluation results Jun 9-16, 2010 – 8th ITU-R WP5D Meeting in Vietnam EGs to submit “final” evaluation results Oct 13-20, 2010 – 9th ITU-R WP5D Meeting in China Complete “Step 7” of IMT-Advanced Process


Download ppt "ITU-R Liaison Group Report - Session #68 Opening Plenary"

Similar presentations


Ads by Google