Neil JacksonUK-V RAL 8th September 20041 Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Truck-Trailer Refrigeration Equipment
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Refrigerators.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
16/5/2003SCT PAR, Georg Viehhauser1 Assembly of Modules to Cylinders Georg Viehhauser.
Components of HVAC System
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
DMK Mechanical Services Ltd Pipework Solutions… Service Excellence.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
The new Super Multi from TCUK
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
HEAT PUMPS BY: DINESH BAKTHAVATSALAM ID#: M-I.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
V. Bobillier1 Cable installation status.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
S A Griffiths CM42 June 2015 Electrical & Control.
5 November 2002J.Pater - Systemtest Report1 Endcap Systemtest Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules.
Automotive Heating And Air Conditioning
ATLAS Internal ID Service Integration
P. Sutcliffe Liverpool University
Installation of the T600 at Fermilab
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Automotive Heating And Air Conditioning
Service channels between Tracker and PP1
Service channels between Tracker and PP1
MODULE QUALIFICATION STATUS AT LIVERPOOL
OBJECTIVES Discuss the various methods of loosening the brake bleeder valve. Discuss the need for brake bleeding. Describe the manual bleeding procedure.
End-cap Mechanics FDR Overview of the Project
Micro Vertex Detector of PANDA Strip Detector
TEC assembly and commissioning at Lyon
Presentation transcript:

Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests on disc 9 –Redundancy link results –Cooling performance Current Inventory Future plans

Neil JacksonUK-V RAL 8th September Infrastructure Services and test box –Optical Fibres and DCS in place –Test cables terminate in patch panels allowing the connection to PPF0 through a short length of ribbon cable –Test box is equipped with simple removable aluminium covers front and back

Neil JacksonUK-V RAL 8th September Evaporative cooling system –4 heat exchangers have been constructed –Pipe-work, valves and distribution blocks have been installed –Connections are made using flexible stainless steel pipe-work –Leak testing is very time consuming!

Neil JacksonUK-V RAL 8th September Disc Handling –The disc handling jig using the crane has been modified to optimise the smooth attachment and removal of discs for both the mounting tooling and the test box –Further modification will be required for transferring the disc to and from the tooling to mount the disc in the end-cap cylinder

Neil JacksonUK-V RAL 8th September Redundancy Link Results The inclusion of the redundancy links on disc 9 introduced additional noise Investigations identified the following improvements –Replacement of a 5k  resistor in the ground line with 0  –An improvement in the redundancy link grounding For a full report see

Neil JacksonUK-V RAL 8th September Extracts from the report

Neil JacksonUK-V RAL 8th September Results with 0W resistor + new links still show a distortion at~ 0.3 fC Occupancies look OK

Neil JacksonUK-V RAL 8th September Cooling Performance The cooling system tests have involved running the Cold Room with a low dew point (<-25C) but operating at room temperature –Test box is flushed with dry air The evaporative cooling for Disc 9 was turned on quadrant by quadrant (no power load) –Each quadrant will cool down to –25C but when all four operate together one quadrant was not cooled efficiently The suspect heat exchanger has been replaced –All quadrants now cool together to –25C –Need to check performance with power on all quadrants

Neil JacksonUK-V RAL 8th September One problem is that the programmed switch-off mode for the cooling rig allows the temperature to fall to –40C –Simple cure is to enter the cold room very briefly and close valves feeding the disk –Can also investigate possibility of modifying the code in the controller 8 Hybrids and 4 modules were mounted without thermal grease, powered and clocked with ambient temperature of ~20C –the hybrids temperatures varied between 6C and 13C (Ambient in test box ~ +10C) –Hybrids ran cooler ~ 6C-8C, modules at ~12C-13C Modules with grease run ~ 5C cooler (ambient ~ 20C)

Neil JacksonUK-V RAL 8th September Current Inventory Disc 9C has been accepted and is in use Disc 8C has arrived and is awaiting acceptance tests Disc 7C is expected next week In terms of modules we currently have in Liverpool –171 (Good + Pass) outer modules –76 (Good + Pass) Middle modules –15 Outers and 29 Middles being processed

Neil JacksonUK-V RAL 8th September Future Plans There is a proposal to mount the least good modules on Disk 9 (~10 bad channels) Next step is to mount all the lower modules using correct tooling and thermal grease –Electronic characterisation –Thermal tests with thermal camera Mount the remaining modules and characterise a completed disc In parallel perform acceptance tests on discs 8 and 7