Alain Blondel MICE collaboration meeting CM25 RAL November4-7 2009   MICE The International Muon Ionization Cooling Experiment.

Slides:



Advertisements
Similar presentations
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE Funding Agencies Committee.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
CMPB Alain Blondel 14 April STATUS OF MICE.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May o VC 17th June o CM27 (RAL)
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE Spectrometer Solenoid Review A summary of P.Fabbricatore on behalf the review board Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold,
Collaboration Board Summary MICE CM 25 November 7, 2009.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Status of the MICE Construction Project
MICE CM31 Schedule summary
Report on EUCARD WP6: MICE Transnational Access (TA)
Presentation transcript:

Alain Blondel MICE collaboration meeting CM25 RAL November   MICE The International Muon Ionization Cooling Experiment

Alain Blondel MICE collaboration meeting CM25 RAL November Welcome to MICE CM25: Goals of the meeting Alain Blondel MICE is running again! (and again today) 1. Step I: all OK installed and running …DK Solenoid, target still: optics, lumi monitor, intensity climb 2. Step II: Spectro solenoid SSI. Tracker, diffuser, Shielding plates Where we stand with Spectrometer solenoid? 3. Step III: SSII and tracker II, EMR, LiH absorber, wedge 4. Step IV: Liq H2 system, FC module, absorber, windows etc. Some infrastructure issues 5. Step V: RF cavities production, RF power station assembly Coupling coils, RF infrastructure. 6. Step VI: approved scientifically but not funded completely … Getting there?. 7. Review status of conferences and publications Thanks to Rose and to Chris Booth for organization!

Alain Blondel MICE collaboration meeting CM25 RAL November Synopsis -- decay solenoid now routine operation! -- infrastructure items enormous progress, still need PPS – some other worries -- target target in ISIS working ‘perfectly’ replica still not perfect -- results of Sep09 beam measurements running again! MUONS! beam loss up to 2V! ~40  ’s/spill/Volt still factor ~25 to go for stepV (was 500) -- spectrometer solenoid ran 90% current burned High Tc lead -> Apr10/Jul10 -- detectors and EMR all OK, TOF2 dec09 EMR in construction -> Jul10 -- RF cavity production 5 cavities by dec09 -- RF power source First 1MW power amplifier to be tested by Dec09 -- RF power infrastructure still tight MRI proposal: low level RF and piping -- Focus coils necessary modification spotted delivery May hydrogen absorber first absorber completed. LiH system progressing now -- Coupling coils large test coil complete fabrication delegated to Qi Huan (Beijing) Mucool CC end-2010 MICE Q3-Q ??? would be great to have these dates by the end of this CM25 -- DAQ, monitoring software & analysis operational – still much to perfect! Mousepower welcome everywhere

Alain Blondel MICE collaboration meeting CM25 RAL November STEP II All is ready for step II -- all detectors OK, tracker has been ready now for awhile -- Floor and infrastructure plans for stepII will be discussed at tech. board Delay due to spectrometer solenoid -- SSI reached 88% of max current (238/270A) but 8 July HTs lead failure (burned) insufficient cooling in this area of magnet proposed fix is to add an aditional 1-stage crycooler cryocooler ordered, expected early November -- vendor working now on both magnets to implement space for additional cryocooler Review of Solenoids ongoing to investigate -- need for further improvements -- how to avoid incident again

Alain Blondel MICE collaboration meeting CM25 RAL November Magnet Cross Section View Fill Vents

Alain Blondel MICE collaboration meeting CM25 RAL November Assessment of situation: (MZ) High likelihood of being able to train both magnets to full current NO guarantee that magnet 2 will operate without needing “top-up” of cryogens; carrying out thermal calculations now to examine this, but real proof awaits testing. Consequences in MICE hall (cost, space, safety) -- possible need for additional compressors and -- possibly presence of cryogen dewars under evaluation. Best estimate of schedule at present: delivery at RAL April 2010 of magnet 2 (SSI for step II) magnet 1 (SSII for step III) three months later Will work hard to maintain Step II in early July’10 – ISIS shut down 15Aug’10! Otherwise Step II postponed to Mar11…

Alain Blondel MICE collaboration meeting CM25 RAL November Spectrometer Solenoid Plans Review process underway: -- charge and list of requested documents issued -- documents on the web by 23 September -- in person review November -- reviewers call 5 october to introduce material Review panel: Pasquale Fabbricatore (Genoa, chair) Elwyn Baynham (RAL+ITER) Mike Couthold and Tom Bradshaw,(RAL) Amalia Ballarino (CERN) Chris White (Daresbury lab) Comments until 19 October, meeting with LBNL people 2 November In person meeting at BNL November to conclude. Review web site: Concern for other MICE magnets: implications of construction of large magnets with cryocoolers Small or large lessons to be learned e.g. ‘protect HTs leads!’

Alain Blondel MICE collaboration meeting CM25 RAL November Review Charge:

Alain Blondel MICE collaboration meeting CM25 RAL November  MICE Schedule as of Sept 2009 Sep-Dec 2009 (running now) STEP I Q2/Q Q > 2011 STEP II STEP IV 2011 STEP V STEP VI  2013 STEP III/III.1 Run date:

Alain Blondel MICE collaboration meeting CM25 RAL November ISIS Schedule as received from David Findlay 29/10/09 2-8Nov09 / 10Nov09-20Dec09 /21-23Dec092009/4STEP I 1-14Feb10 / 16Feb10-25Mar10 /26-28Mar102009/5STEPI 12-18Apr10/20Apr10-28May10 /29-30May102010/1STEPI 7-20Jun10 /22Jun10-12Aug10 /13-15Aug102010/2STEPII? 1-27Feb11/ 1Mar11-14Apr11 /15-17Apr112010/3STEP III? 2-8May11/ 10May11-9Jun11 /10-12Jun11 *)2011/1STEP III? 27Jun11-3Jul11/5Jul11-4Aug11/5-7Aug112011/2STEPIII.1? 5-18Sep11/ 20Sep11-27Oct11 /28-30Oct11 *)2011/3STEPIV? 7-13Nov11/ 15Nov11-22Dec11 /23Dec11 *)2011/4STEPIV 16Aug10-30Jan LONG SHUT DOWN Run-up&MP / ---users run--- / Machine PhysicsCycle nameMICE *) provisional Some decisions may be open to us: We may be in position to skip/shrink step II Step IV may be ready earlier than completion of steps III and III.1? Do we try to run all the time or skip one period for step IV installation?

Alain Blondel MICE collaboration meeting CM25 RAL November Funding agency committee 16 October 09 Presence of DOE (None) NSF (Marv. Goldberg, James Whitmore remote) INFN (U. Dosselli, A. Vacchi) STFC (J. Womersley, C. Jamieson, J. Bennett) RAL (N.McCubbin pt) MICE (A.Blondel (spokesperson), A. Nichols, K.Long,(project management ) MICE status report MICE note 267 Thanks for all contributions! Please read and correct/improve. Open session: (Mike Tarrant, Chris Booth, Yagmur Torun) (a very nice set of slides on MICE) Schedule (A.Nichols) Some uncertainties to step V, still, in particular power station upgrade. Report on Common Fund usage (progress on clarifying presentation of this!) UK STFC confirms that Step VI is full part of MICE program. UK funding.for step VI will be discussed this coming winter. Hope to have decision in March2010. Also promised to re-organize oversight of MICE experiment at large.

Alain Blondel MICE collaboration meeting CM25 RAL November Worries and problems by PM Andy Nichols Infrastructure for Step II will be ready several months before delivery of first spectrometer solenoid A bit of a hiatus then What if we have to disperse the installation team? No news of substation upgrade – we’ve effectively moved this risk from Step IV to Step III Space for storage and pre-integration at RAL will be a problem around Steps IV & V, given how long this takes we must act now (some progress with R40) 12

Alain Blondel MICE collaboration meeting CM25 RAL November Party Thursday evening in hall R22 – simple the MICE facebook team Verguilov/Graulich/Ellis/Kyberd/Nebrenski is volunteered to organize games etc… -- upload your talks! Indico modification key is cm25 -- comments etc.. on organization of MICE meetings -- or – -- comments or questions/points to raise in conclusions --- send mail – hand out note -- talk.  To me