Presentation is loading. Please wait.

Presentation is loading. Please wait.

MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.

Similar presentations


Presentation on theme: "MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel."— Presentation transcript:

1 MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel

2 MICE RLSR – 13Nov2013 Alain Blondel 2 OVERVIEW Recommendation 1. Create a living, accessible and regularly updated one-page "dashboard" summary of milestone achievements demonstrating the evolving status of deliverables (eg magnets), initially focusing on Step IV, as soon as possible. (a dynamic presentation of the data normally contained in Gail’s Milestone table after selection of most significant milestones)  Roy Preece Recommendation 2. Produce a one-page specification for the operation of the MICE International Project Office and present at the next MPB meeting This was drafted by Andy Nichols, pending full approval by CB.  Ken Long Conclusions and recommandations from MPB in May 2013(I) also written up in the written report to MPB

3 MICE RLSR – 13Nov2013 Alain Blondel 3 SUPERCONDUCTING MAGNETS Recommendation 3. Investigate the potential reasons for the slow and unusual training of Spectrometer Solenoid 2 (and Focusing Coil 1). Check the protocols (eg travelers) for the Spectrometer Solenoids and Focusing Coils, to establish the level of quality assurance and to seek explanations for slow training. Present results at the next MPB meeting. We dont have a predictive understanding of the behaviour of the magnets but we have collected the data and made a number of tests.  John Cobb Recommendation 4. Re-evaluate the possibility of proximity shielding (partial yoke) that takes into account the detailed situation of the present infrastructure in the MICE hall and present a plan for future work at the mitigation shielding review at RAL in August/September. The magnetic mitigation group did this.  Holger Witte RF SYSTEMS Recommendation 5. Prepare a plan to test a prototype Low Level RF system with the RF Coupling Coil at the Fermilab MTA, and present the plan at the next MPB meeting. We have decided not to do this. Conclusions and recommandations of MPB (II)

4 MICE RLSR – 13Nov2013 Alain Blondel 4 COMMISSIONING, CONTROLS & OPERATIONS Recommendation 6. Present an integrated plan for all aspects of the control system at the next MPB meeting. (Controls team is preparing this. Very much work in progress!)  Pierrick Hanlet Recommendation 7. Present the requirements and design of the MICE timing system at the next MPB meeting, with particular emphasis on absolute calibration by particle arrival phase measurement. Work ongoing, in collaboration between DAQ expert and RF group at DL.  Kevin Ronald Recommendation 8. Explore the potential to achieve synergistic economies of scale in the maintenance and operation of the liquid hydrogen system by working with the ISIS moderator cryogenics team, and present at the next MPB meeting.  Ken Long Recommendation 9. Develop an on-site support plan for day-today operations, maintenance and repair of the MICE hardware, and present at the next MPB meeting. (  MICE operations group)  Ken Long Conclusions and recommandations of MPB (III)

5 MICE RLSR – 13Nov2013 Alain Blondel  Provisional MICE SCHEDULE update: May 2013 STEP I STEP IV (Q2 2014, no field) Q1 2015 to Q1 2016 STEP VI Run date: EMR run July 2013 Under construction: Possible Step V run Q4 2017 Step VI 2019

6 MICE RLSR – 13Nov2013 Alain Blondel Provisional MICE SCHEDULE update: November 2013 Begin Run date: EMR run Oct 2013 done (possibly : w/o field July14) Q1/Q3 2015 to Q1/Q4 2016 Step VI Q2 2020/Q1 2021 best case / worst case possible Step V Q3 2018/Q2 2019

7 MICE RLSR – 13Nov2013 Alain Blondel 7 A lot has happened in the last few months! Have arrived at RAL: -- RF amplifier -- 11 crates of RF equipement from U-Miss -- The EMR and all its kit -- the Upstream Spectrometer Solenoid (USS) (aka SS2) -- the AFC2 + we have carried out the EMR run with beautiful results  (and with all available detectors included in the DAQ) + we have decided on the field mitigation strategy and passed a review. + our paper on emittance measurement of the MICE beam with TOFs is published. Avatars: -- Decay solenoid had a burned LTS lead during test of new QPS  fix by Apr14 -- Downstream Spectrometer Solenoid had a few issues  delivery in May14 -- Coupling Coil test had 2: He leak in June, thermal insulation needs redone. Coupling coil test  Q1 2014.

8 MICE RLSR – 13Nov2013 Alain Blondel 8

9 9 CERN mapping team @Wang

10 MICE RLSR – 13Nov2013 Alain Blondel 10 Construction of Coupling coil cryostat at LBNL And testing of CC1 at Fermilab hmmm, MLI wrapping needs to be redone...

11 Mapped Currents Mode Solenoid100281256234274253 95266.95243.20222.30260.30240.35 80224.80204.80187.20219.20202.40 50140.50128.00117.00137.00126.50 Flip100265280234278249 95251.75266.00222.30264.10236.55 80212.00224.00287.20222.40199.20 50132.50140.00117.00139.00124.50 Runs cover the above currents, plus: 0A measurements (residual field) 30A individual coil measurements (superposition) With and without Virostek plate A lot of data 3/21 V. Blackmore

12 MICE RLSR – 13Nov2013 Alain Blondel 12 EMR run took place 4 week-ends Thursday 13:00 to Monday night MOM: Ryan Bayes

13 MICE RLSR – 13Nov2013 Alain Blondel 13 several millions of triggers.

14 MICE RLSR – 13Nov2013 Alain Blondel 14 e-e- -- --

15 MICE Field Mitigation Review 23-09-2013 Alain Blondel 15 Magnetic shielding review panel endorsed MICE proposal... with caveats: Principle has been reviewed and decided. next steps : implementation, while taking into account comments of review panel  towards PRReview

16 MICE Field Mitigation Review 23-09-2013 Alain Blondel 16 Changes 1. New spokesperson : Ken Long We are working together to ensure a smooth transition. ABlondel will be Collaboration Board chair for next two years. 2. Project manager will now be Roy Preece Andy Nichols will continue as Project Engineer 3. Linda Coney has moved on -- Ian Taylor is now the head of the online group -- new MICE Operations Coordinator will be needed

17 MICE Field Mitigation Review 23-09-2013 Alain Blondel 17 LOOKING FORWARD TO STEP IV

18 MICE RLSR – 13Nov2013 Alain Blondel this was discussed yesterday in RLSR

19 MICE RLSR – 13Nov2013 Alain Blondel No or empty absorber Alignment Optics studies Solid absorber(s) LiH Plastic C, Al, Cu LiH Wedge absorber Emittance exchange Liq H 2 absorber (full/empty) Multiple scattering Energy loss  Cooling STEP IV EXPERIMENTS (2015-2016)

20 MICE RLSR – 13Nov2013 Alain Blondel

21 21

22 MICE Field Mitigation Review 23-09-2013 Alain Blondel 22 HOWEVER... a lot will depend on what the magnets can deliver we will know only when the beamline is assembled the Upstream Spectrometer Solenoid USS (SS2) was tested and passed for all requested ‘design’ curents. AFC1 passed for the maximum requested current in «solenoid mode», but not in «flip mode» where the ‘nominal setting’ (center of 3x3 matrix) is barely achieved. Situation may be worse (or better) when all magnet are powered in step IV configuration.

23 MICE Field Mitigation Review 23-09-2013 Alain Blondel 23 Flip mode design (maximal) setting flip mode nominal setting Solenoid mode design setting

24 MICE Field Mitigation Review 23-09-2013 Alain Blondel MICE Note 434

25 MICE RLSR – 13Nov2013 Alain Blondel 25 Conclusions 1. MICE is in happy shape, looking forward to step IV! -- With new Spokesperson, Project Manager, Project Engineer -- Several important milestones have been passed 2. Decision was made to implement the Partial Return Yoke -- schedule will be more predictable 3. Next large uncertainty concerns the performance of the magnets when powered all together -- we are preparing to adapt to peformance being lower than design but above the ‘nominal point’. (modify beta function at absorber) -- however if performance were below the ‘nominal point’ MICE would force more drastic questionning to know how to go forward with the experiment. 4. Preparations for STEP V/VI are progressing

26 MICE RLSR – 13Nov2013 Alain Blondel 26 SPARE SLIDES

27 MICE RLSR – 13Nov2013 Alain Blondel

28 28 THEN we can do the physics!

29 MICE RLSR – 13Nov2013 Alain Blondel

30

31

32 32 MICE beam Successful run in Oct’13 but rate limited because DS has a burned LTS lead (to be fixed during the winter shut down) muon (or pion) stops and decays


Download ppt "MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel."

Similar presentations


Ads by Google