ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.

Slides:



Advertisements
Similar presentations
Facilities Management and Design Chapter 4 Safety and Security systems.
Advertisements

Objective: Develop plans for kitchen cabinets.
Safety Training Safety First. EXITS All exit doors shall be maintained in operable condition. Exit doors shall not be locked, chained, bolted, barred,
References: Ballast, D. K. (2002). Interior Construction and Detailing for Designers and Architects. Belmont: Professional Publications, Inc Reznikoff,
Ceilings and Stairs RCPs good place for building systems coordination More three-dimensional variety than plans Coordinate vertical elements like elevators.
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
Mechanical Plan Review. Review Plan Package Use Group/Occupancy Correct Code Reference/Conformance Revisions Mechanical Plans/Spec Books Structural Plans.
Chapter 16 Floor Plan Symbols.
Four Learning Objectives Understand Smoke Control Theory Understand Design Methods Know Your Role in Commissioning Tests Be Familiar with Hardware, Test.
The Life Safety Surveyor Facility Tour
Chapter 19 Electrical Plans.
Smoke Control Fire-Rated Stairwells Fireproofing of Structural Components Egress Lighting Fire-Resistive Construction Elements Fire and Smoke Dampers Emergency.
Won’t count Won’t count Another quiz, in two weeks Another quiz, in two weeks The Quiz.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FALAR Part 3 – Post Construction  Compilation of  Maintenance records of fire protection/life safety equipment  Test records of fire protection/life.
FPF190: Fire Protection Fundamentals FPF190 Fire Protection Fundamentals 1 Code Consultant.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
HVACR116 – Trade Skills Mechanical Drawings.
Code Analysis. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical.
Fire Safety By Alicia Civile and Alexandra Fernandez.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
MINNESOTA CHAPTER AUTOMATIC FIRE ALARM ASSOCIATION Requirements of the 2003 Minnesota State Fire Code relating to Group R Occupancies September 14, 2006.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
Code Analysis: Don’t try this at home. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Chapter 7 Lighting Controls © 2006 Fairchild Publications, Inc.
Fire Protection Systems Chapter 6. Fire Protection Systems Most of the time you will work with an electrical engineer or fire-protection designer to coordinate.
Fire No institution is immune from fire. Flood damage can be dried out and restored, stolen property has a chance of being recovered; damage from fire.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
code calculations, construction drawings
ID 234 Building Codes Life Safety Diagram:Review.
FLOOR PLANS WHERE IT ALL BEGINS. FLOOR PLANS 1.Column Grids Backbone of all the documents, especially the floor plans Alpha characters horizontal Numeric.
Design Development Code analysis Partition types.
Fire Prevention Facilities of Building 1 Civil Engineering Department Safety Promotion Project.
ID 234 Building Codes Fall 2012 Means of Egress Chapter 4.
Agenda SDFD – CEDMAT Program & Staff 2013 CA Fire Code
ID 307 Construction + Materials III: Lighting Prof. Brody Endicott College Fall 2012 Custom Luminaires.
Means of Egress Part 3 Chapter 4.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
LIGHTING LAYERS DIAGRAMS. individual layers might be… Focal – vertical surfaces and objects Task- specific activities Daylight- may provide any role Decorative.
A-211 – Reflected Ceiling Plan, First Floor Building 1
Codes.
Chapter 6 ID 234 Building Codes Fire Suppression.
ID 234 Building Codes Fall 2011 Means of Egress Chapter 3, part II.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Chapter 6 ID 234 Building Codes Fire Suppression.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
New Energy Centre at Megawatt Park 15 April 2014.
Safety Rule #1 Open flames are not allowed without first obtaining a permit. The exception to this rule is during a period of closely supervised instructions,
Final half of the semester Putting theory into practice 1.
Civil Courthouse 201 Caroline
Family Law Center 1115 Congress
Construction Documents
ID 234 Building Codes Fall 2008 Fire Suppression Chapter 5.
Total Fitness Gym By Student Architect Jhonatan Rubio
Commercial Building Project Portfolio
Fire Door Inspections Qualified Training
Juvenile Justice Center 1200 Congress
Chapter 19 Electrical Plans.
WHERE IT ALL BEGINS.
Architectural Drawing
Presented by: Tim Knisely
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
Fire Safety Training 1.
Criminal Justice Center 1201 Franklin
Fire Evacuation Procedures
Presentation transcript:

ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination

All that other stuff Fire protection –Sprinklers –Exit lighting and signage –Smoke detection systems HVAC diffusers and registers Miscellaneous electrical –A/V, including speakers, network repeaters, (telephones), etc –Retractable screens, projectors, etc

Dimensions of recessed lighting

Structural Systems

Steel yourselves

Concrete systems

Most restrictive

Heating and A/C symbols

Mechanical Plans from the Engineer

You need the duct sizing and register locations

Air systems: how they work

Parts of a furnace: this is what goes in your mechanic al room

Supply air diffusers

Linear diffusers and return grilles

Fire codes See NFPA 72 Three parts: –Initiation –Notification –Control

Manual Pull Stations By each required exit

Smoke detectors One in every enclosed space One every 41’ along corridors (for ceilings below 24’) Optical sensitivity Hard-wired

Fire Detectors One near each required exit in exit access corridors Required in some specific occupancies (hazardous)

Exit signage Wall or ceiling mtd; can be lit internallyceiling At every exit door Every 100’

Strobe lights and horns Spread out so that they’re visible within major egress components Also in bathrooms

Battery-powered lights Integrated with built-in lighting Mounted on walls with battery packs (for retrofit, or where built-in lighting is not suitable)

Sprinklers Use this process when working with an engineer of any sort –Start with rule of thumb for initiation layout –Read engineer’s drawings for final design, and copy onto your RCP –Coordinate: look for interferences with lighting, ducts, soffits and structure –note any changes and send back to engineer –7.5’ from wall, 15’ OC both directions

Fire Extinguishers One near each required exit in exit access corridors Required in some specific occupancies (hazardous)

Hose cabinets By required exits

Other operable devices Hold-opens Fire department notification Stairwell pressurization Smoke management systems

Wireless Wireless repeaters –Every 150’ within direct line of sight –50’ through interior partitions –Not at all through masonry/exterior walls

Rules of Thumb For schematic layouts Use and engineer or other consultant for final layout

A/V equipment TV’s, projectors, etc Sight lines are critical (for viewer and projector) Speakers: –Coverage varies greatly by system –One in a room –Wall or ceiling mtd –Stereos, CD’s, etc: within the room

Don’t Forget Signage!!! Exit signs at all the doors (show in elevation, if you’re doing them) Strobe emergency lights in the bathrooms Emergency lights along all the paths of egress All need to be located in the drawings and specified

Fire Extinguishers Per NFPA 11 Every 150’ in assembly Use Groups (place public areas) Hazardous locations (kitchens)

What to do this week on your projects Calculations are due this week! As for the rest of the term… –Add all dimensions to RCPs –Add all notes –Start drawing up details –Finish up Lighting Schedule –Keep saving and labeling your fixture cuts as you decide on them

Ceiling Construction Details Interface of horizontal elements and vertical

ACT meeting GWB wall

ACT hung off structure

GWB ceilings

Special conditions

Stretched ceiling