Global Design Effort - CFS 08-12-09 ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.

Slides:



Advertisements
Similar presentations
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Advertisements

Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
Integration Ideas for the Central Region Some old some new
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Tom Lackowski Revised 10/12/2011
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
Presentation transcript:

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V. Kuchler

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 2 Overview General Planning for the ALCPG 09 Meeting General Planning for the ALCPG 09 Meeting Status of CFS Area System Design Development Status of CFS Area System Design Development Status of CFS Response to SB 2009 Working Assumptions Status of CFS Response to SB 2009 Working Assumptions Status of CFS Milestones Listed in the ILC R&D Plan Status of CFS Milestones Listed in the ILC R&D Plan

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 3 CFS Planning for ALCPG 09 A Full 2D Beamline and Enclosure Layout will be Developed Prior to the Albuquerque Meeting A Full 2D Beamline and Enclosure Layout will be Developed Prior to the Albuquerque Meeting Some Work on a 3D Layout will also be Completed by ALCPG 09 Some Work on a 3D Layout will also be Completed by ALCPG 09 The Effects of Area System Redesign and SB 2009 Working Assumptions will be Incorporated into the CFS Machine Layout The Effects of Area System Redesign and SB 2009 Working Assumptions will be Incorporated into the CFS Machine Layout CFS Progress on the ILC R&D Milestones will also be Reported at ALCG 09 CFS Progress on the ILC R&D Milestones will also be Reported at ALCG 09

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 4 CFS Area System Design Development e- and e+ Sources have New Position, Configurations and Lengths Established, However Details for Injection and Extraction to the Damping Rings Still Need to be Finalized e- and e+ Sources have New Position, Configurations and Lengths Established, However Details for Injection and Extraction to the Damping Rings Still Need to be Finalized Most Information for the Damping Ring has been Defined Most Information for the Damping Ring has been Defined RTML Length has been Reduced and Overall Layout has been Defined RTML Length has been Reduced and Overall Layout has been Defined Most Information for the Main Linac has been Defined with the Exception Some Revised Definition for Shaft Spacing with Respect to Cryogenic Requirements Most Information for the Main Linac has been Defined with the Exception Some Revised Definition for Shaft Spacing with Respect to Cryogenic Requirements Beam Delivery System Information is Established, but Work is Needed to Develop Enclosure Configurations When Area Systems Share a Common Tunnel Beam Delivery System Information is Established, but Work is Needed to Develop Enclosure Configurations When Area Systems Share a Common Tunnel

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 5 Schematic Machine Layout

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 6 Typical Area System Criteria Spreadsheet

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 7 Typical Area System Milestones

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 8 SB 2009 Working Assumptions (WA)

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 9 SB 2009 CFA WA Status WA 1 – Dependent on Technical Decision WA 1 – Dependent on Technical Decision WA 2a & 2b WA 2a & 2b  Americas Region - Klystron Cluster is Complete, DRFS Still to be Completed. Tunnel Diameter Still needs Optimization  European Region - Both Schemes are Being Worked on by Amberg Consulting  Asian Region - Both Schemes have been Investigated. Cost estimates Need to be Updated WA 3 – Undulator-Based e+ Source has been Incorporated into the New CFS Machine Layout WA 3 – Undulator-Based e+ Source has been Incorporated into the New CFS Machine Layout WA 4 – Low Power Option is Reflected in the New Area System Criteria and CFS Machine Layout WA 4 – Low Power Option is Reflected in the New Area System Criteria and CFS Machine Layout WA 5 – 3.2 km Damping Ring has been Incorporated into the New CFS Machine Layout WA 5 – 3.2 km Damping Ring has been Incorporated into the New CFS Machine Layout WA 6 – Single Stage Bunch Compressor has been Incorporated into the RTML and New CFS Machine Layout WA 6 – Single Stage Bunch Compressor has been Incorporated into the RTML and New CFS Machine Layout WA 7 – Coordination of the Central Region Beam Layouts are Being Developed and will be Incorporated into the New CFS Machine Layout. Specific Lattice Information is Still Needed WA 7 – Coordination of the Central Region Beam Layouts are Being Developed and will be Incorporated into the New CFS Machine Layout. Specific Lattice Information is Still Needed

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 10 CFS R&D Plan Milestone Status Process Water Value Engineering Process Water Value Engineering  Completed Alternative Tunnel Configuration Alternative Tunnel Configuration  Preliminary Work was Resumed by Hanson Engineering  T. Lundin Attended the Workshop to Review the Dubna Geotechnical Report in June, 2009  2-Day Workshop was Held at Fermilab on Aug 3-4, 2009 to Review Progress and Begin to Develop Cost Estimates  A Second 2-Day Workshop is Planned to Internally Review the Final Configuration Analysis and Cost Estimates on August 24-25, 2009 at Fermilab  Project Manager’s Review will be Scheduled Prior to the ALCPG 09 Meeting in Albuquerque in September  This Milestone will be Completed by ALCPG 09

Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 11 CFS R&D Plan Milestone Status Life Safety and Egress Global Document Life Safety and Egress Global Document  Hughes and Associates will now begin to Review the Alternative Tunnel Configurations to Develop Life Safety and Egress Plans for Each Alternative. The Initial Planning Meeting is Scheduled for Aug 12, 2009 at Fermilab.  CLIC Document Is Complete  XFEL Document has been Translated into English  LHC Document is being Developed  Asian Document has been Completed  All Individual Documents will be Compiled into a Single Comprehensive Document with an Executive Summary Which will Describe Commonalities and Distinctions in the Various Reports The Executive Summary will be Added to Complete the Document Prior to the AAP Review in January, 2010 Surface Building Criteria Review Surface Building Criteria Review  Not Scheduled for Completion Until July, 2010