Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
PIP Update Aug 22 th Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Proton Improvement Plan Bob Zwaska July 7, 2014 All-Experimenters Meeting.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
PIP Status Report Linac Startup plans 12/05/2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
PIP Status Report Linac Startup plans 12/05/2012.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Proton Improvement Plan William Pellico Fermilab Institutional Review June 6-9, 2011.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Proton Improvement Plan (PIP) William Pellico Fermilab Annual Science and Technology Review September 5-7, 2012.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
Proton Economics Eric Prebys FNAL Accelerator Division.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Operations Department
Presentation transcript:

Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 2 Summary Preparing for beam  Most installations for this shutdown are complete: RFQ Linac Vacuum / Motor Control Center Booster Absorber Booster Solid State Booster Vacuum & Water Much work to go:  Linac & Booster RF systems  Loss minimization

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 3 New RFQ Installed

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 4 RFQ Status RFQ is Installed and commissioned  November mA into Linac Tank 1 – goal is 40 Used for treating patients since Dec. 11  28 mA at Tank 3 Transverse emittances are 2x smaller than previously with Cockcroft-Waltons Tuning is ongoing  Possibility of beam exiting RFQ at large angle leading to losses Correctors will be added

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 5 Linac Status Linac vacuum and Motor Control Center upgrades performed over shutdown 66 MeV beam has been delivered for NTF patient treatment 400 MeV start up initiated the week of December 17  First beam to the dump Dec.18th Commissioning continues Efficiency still lower than expected at high energies (~ 10% lower):  Ongoing problems with LRF5 which has been running at 7% lower gradient. Significant impact on poor efficiency and high losses observed.  Phase matching is not totally optimized yet. It will help when HEP beam resumes by the end of this month  Problems with instrumentation (unprecedented behavior of the HE motor controller of the wire scanners). Wires are unidirectional. They seem not to be retrieving to the opposite position once inserted. Investigation will resume after the holiday break.  Nevertheless, beam was observed at the dump area. More work to cleaning accelerate and dump the beam to the absorber continues.

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 6 Booster Solid State Upgrade Will be completed during shutdown Major benefits to reliability and the cost of operation To Be Done Nearly Done Prototype Upgraded

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 7 Booster RF Cavity Refurbishment RF cavity and tuner refurbishment is proceeding and will continue while running 4/19 Cavities refurbished To Be Done Removed Being Refurb. Refurbished

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 8 Spare Cavity Ferrite Testing Cavity Modeling Refurbished Solid State Cavity Tuner Rebuild Failed Tuner Connection Booster RF Repaired Tuner Connection

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 9 Booster Upgrades Major LCW replumbing and vacuum work also completed New notcher and absorber installed  Will create cleaner notches in the beam, and direct the notched beam into a controlled dump location

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 10 Booster Startup Booster work is wrapping up this week Startup will occur towards the end of next week New notch absorber and RF will be commissioned Aperture alignment and potential magnet moves will occur Beam studies for optics and cogging will continue Will wait for MI & RR for high-throughput startup  In the meantime, we will test cavities for high-pulse rate

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 11 Long-Term Items Linac RF Systems Modernization  High cost of upkeep  High-risk for failure in both modulator and power amplifier  Have developed an alternative klystron amplifier that solves both the above problems Ready to build a prototype! – addressing finance issues Booster RF Cavities  Need to be refurbished to operate at higher rates  Have now refurbished four cavities ( /19) to operate at 15 Hz Yet to be proven with beam As of a year ago, it was unclear whether cavities could ever run at 15 Hz  Need at least three additional, new stations for RF control to limit losses Provides a consistent accelerating voltage  More cavities may be needed, depending on results of refurbishment New cavities offer the possible of reduced losses and improved performance  Refurbishing continues and design work is underway for additional cavities.

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 12 Summary Proton Source ready for startup  Numerous PIP upgrades during the shutdown  There was additional non-PIP work (not covered here) Should experience immediate operational improvements from:  RFQ  Linac and Booster utilities  Solid-state upgrade  Notch Absorber  Four refurbished cavities Work will continue  RF systems are the major focus  Several activities to decrease losses / increase intensity  More utility / reliability work is pending

Jan. 7, 2013 Bob Zwaska All-Experimenters Meeting 13 Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting