Presentation is loading. Please wait.

Presentation is loading. Please wait.

PIP Update Aug 22 th 2012. Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster.

Similar presentations


Presentation on theme: "PIP Update Aug 22 th 2012. Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster."— Presentation transcript:

1 PIP Update Aug 22 th 2012

2 Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster RF Modulators – Craig Drennan - Booster Cogging Hardware

3 Update General Info Current Work – Booster RF cavity 5 refurbishment - welding – Linac Transformer – Has arrived! Installation plans still ongoing – Booster Transformer – soon to have bids (may buy two this FY) – LCW – Work Continues – looks to be on schedule – RFQ – final beam tests continue before install (CW shutdown ceremony today) – REPORT for High Power –Submission of proposal to Directorate for approval this Friday – High Power Ferrite Testing - Testing done!!! Meeting to decide ferrite purchase…. – Booster Absorber – absorber built and now connecting up motor controls for testing – Linac Modulator – Testing DTI, planned SLAC meeting postponed, – Modulator – SLAC will be in on Aug 27 to discuss their work – Booster Modulators – Slides Shutdown - comments (Fernanda, Todd, Mary) Updated Schedule (With RFQ updates) Quarterly Report submitted END OF Fiscal Year – deadline soon (have been signing more PO’s)

4 Talks – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster RF Modulators – Craig Drennan - Booster Cogging Hardware

5 All Good Things Must End Some Day

6 PIP Wednesday Meeting Schedule Updates Elmie Peoples-Evans 8/22/2012

7


Download ppt "PIP Update Aug 22 th 2012. Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster."

Similar presentations


Ads by Google