Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Safety aspects: electrical and gas safety, Cs handling, radiation & fire protection Matthias Kronberger, Mats Wilhelmsson On Behalf of the Linac4 ion source,
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Construction and Installation of the CLIC Experimental Area
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
HVACR116 – Trade Skills Mechanical Drawings.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Fire Prevention for Construction. Four classes of fires  A, B, C, and D 1a.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
PLC NANO MANAGING SAFETY FUNCTIONS acting on electrical power for MEY/NA Experiments/Barracks.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
October, 2009 MeRHIC Conventional Facilities Al Pendzick October, 2009 Internal Review.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
EHN1 North Wall Dismantling Schedule Bastien Rae.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
Update on the Laser Beam Line
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
1/21/2016D.S. Sachdev1 Internal Cladding Systems in Buildings.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
Annual Workshop on Crystal Collimation H8 Layout and infrastructure 1October 2010J.LENDARO EN/STI/ECE.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
TC meeting P2 planning wks 3&4 A.Tauro
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Status of Gas Barrack(SPS) and Exhaust JAILLET David EN/EA/CT.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
The Next Generation of a Gamma Irradiation Facility GIF++
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
CBETA Technical Review
CLIC Civil Engineering & Infrastructure Working Group Meeting
EHN1 Extension planning
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
News from Integration WG
Building 107 Update Introduction Project team Location Design status
CERN Data Centre ‘Building 513 on the Meyrin Site’
Budget specification EHN1 Extension: Infrastructure (WG2)
EN-CV Progress EHN1 Extension Project
CE Status: Activities executed until 03/08 and ongoing
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
CEDAR Detector Ventilation System Review
North Area Safety Review 2019
Presentation transcript:

Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015

The project is devided in 4 parts: EHN1 North Wall dismantling (WG1) EHN1 extension building infrastructure (WG2) Extension of the H2 and H4 beam lines (WG3) Installation of detectors and associated infrastructure (WG4)

Infrastructure items in WG2 PBS-IDTitleGroupBudget [CHF] IN.2.1Ventilation, heating and air- conditioning EN-CV634’500 IN.2.2Fluids- and water coolingEN-CV684’316 IN.2.3Electrical infrastructure and lights EN-EL1’033’709 IN.2.4Counting roomsEN-MEF96’000 IN.2.5Gas networksEN-MEF130’700 ÎN.2.6Metal structuresΕΝ-MEF or GS (tbc)193’200 IN.2.7DoorsEN-MEF20’500 IN.2.8Alarms- and detectionGS-ASE150’000 IN.2.9Personnel accessGS-ASE50’000 IN.2.10IT-networksIT-CO88’700 IN.2.11Transport- and handlingEN-HE97’200 Total3’178’825 Project contingency (10%)317’883 Total request3’496’708

Cooling and Ventilation IN Ventilation, Heating and Air-conditioningEN-CV 634,500 General ventilation system 326,790 Air-conditioning of the counting barracks 140,800 Ventilation of the detector pits (air supply) 116,910 Extraction of Argon from experimental pits is in WG4 Connection to the central heating network 50,000 Estimate by MW (wait for a refined quote from GS) IN Fluids and water coolingEN-CV 684,316 Raw water 78,243 Compressed air 25,660 Demineralized water 128,317 Chilled water 270,728 Fire fighting water 56,034 Drinking water(domestic) 28,534 Design&Works (by FSU) 96,800 The Argon extraction system for the pits is estimated to 338,173 CHF !

Electric infrastructure IN Electric infrastructure and lightsEN-EL 1,033,709 DC-Cabling is in WG3 HV switchgear - 18kV Stable + 3.3kV Secure 92,811 Transformers 12,573 Containment for substations only 40,000 Cabling and connections 57,447 Lighting 67,230 Power distribution 84,316 UPS 9,027 Barracks/Counting Room Fit out (Based on 8 times 9x4m) 210,970 Structural Earthing 23,752 Earthing in the concrete slab of extension Documentations 39,583 Cabletrays 396, kE

MEF-Items IN Counting roomsEN-MEF 96,000 Barracks 96,000 12kCHF x 8 IN Gas network 130,700 Neutral gas network and panel(s) in extension 130,700 IN Metal structures EN-MEF or GS (tbc) 193,200 Metal structure which are not included in CE-workpackage Platform, walkways and gridded separations 140,250 Staircases and ladders (crinolines) 52,950 IN DoorsEN-MEF 20,500 Personnel and motorized doors 20,500 !

GS-ASE Items IN Alarms - and detectionGS-ASE 150,000 Estimate by MW (wait for a refined quote from GS) Fire detection ODH detection Evacuation alarm IN Personnel accessGS-ASE 50,000 Access system for machine/detectors is in WG3 SUSI access and video 50,000 6 doors + 5 surveillance cameras !

IT networks IN IT networksIT/CS 88,700 Ethernet 46,00067 UTP Ethernet sockets Wi-Fi 18, UTP Ethernet and Wi-Fi Bases Connection to fiber-optics network 24,200 22kE - Provided by EN/EL/CF

Transport & handling IN Transport and handlingΕΝ-ΗΕ 97,200 Heavy handling and transport for infrastructure work 97,200 two teams of two FTEs for a three months period

Profile PBS-IDTitle IN.2.1 Ventilation, heating and air-conditioning31’725317’250285’525 IN.2.2 Fluids- and water cooling35’216342’158306’942 IN.2.3 Electrical infrastructure and lights103’371465’169 IN.2.4 Counting rooms 76’80019’200 IN.2.5 Gas networks 39’21091’490 ÎN.2.6 Metal structures 154’56038’640 IN.2.7 Doors 20’500 IN.2.8 Alarms- and detection 75’000 IN.2.9 Personnel access 50’000 IN.2.10 IT-networks 44’350 IN.2.11 Transport- and handling 58’32038’ ’3121’643’3171’365’196