1 GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE

2 … getting there … 212/02/2014A. Fabich, EN-MEF-LE

3 GIF in EHN1 - Gas piping and CDC 312/02/2014A. Fabich, EN-MEF-LE

4 GIF Schedule 412/02/2014A. Fabich, EN-MEF-LE EDMS 1328252 V0.3 Functional specs: -Juli 2013 Functional specs: -Juli 2013 Design -Dec. 2013 Design -Dec. 2013 CE start Jan. 2014 CE start Jan. 2014 Infrastructure installation March-July 2014 Infrastructure installation March-July 2014 Irradiator delivery Aug. 2014 Irradiator delivery Aug. 2014 Commissioning Sept.-Oct. 2014 Next major installations: -Structures (EN/MEF) -False floor -Service - First floor -Dem. Water & compr. Air (EN/CV) -Cabling (EN/EL) -AC, controls, light -Access & safety systems (GS/ASE)

5 H2 beam shielding modifications 5 In view of the Primary Ion Run (from Jan. 2015)  Achieve legal RP limits in corridors and barracks  Also during accidental beam loss upstream of PPE152  Additional shielding (min. 80 cm concrete equivalent)  PPE132 and 142: fully covered to protect personnel in corridor and workshop  PPE152: lateral shielding up to 2 m above first floor  Effort  About 300 concrete blocks 12/02/2014A. Fabich, EN-MEF-LE

6 PPE132/142 shielding 613/5/2014A. Fabich

7 PPE152 shielding 7  Only lateral  No roof cover 13/5/2014A. Fabich Central passage NA61 target beam