2 The project is devided in 4 parts: EHN1 North Wall dismantling (WG1) EHN1 extension building infrastructure (WG2) Extension of the H2 and H4 beam lines (WG3) Installation of detectors and associated infrastructure (WG4) Fuctional specification: Edms: 1552999 Budget specification: Edms: 1543155

3 Work units - infrastructure PBS-IDTitleGroup IN.2.1Ventilation, heating and air-conditioningEN-CV IN.2.2Fluids- and water coolingEN-CV IN.2.3Electrical infrastructure and lightsEN-EL IN.2.4Counting roomsEN-MEF IN.2.5Gas networksEN-MEF ÎN.2.6Metal structures ΕΝ-MEF or GS (tbc) IN.2.7DoorsEN-MEF IN.2.8Alarms- and detectionGS-ASE IN.2.9Personnel accessGS-ASE IN.2.10IT-networksIT-CO IN.2.11Transport- and handlingEN-HE Total Project contingency (10%) Total request

4 Cooling and Ventilation – Jerome Rodary

5 Building general ventilation: adding of 2 new ventilation units total flowrate: 210 000 m3/h total heating power: 2 440 kW Existing ventilation unit inside EHN1 building Fire fighting water hose Argon extraction unit Fluid networks

6 Electric infrastructure - James Devine This work unit for electric infrastructure includes consolidation up-stream of EHN1, which must be done to connect the extension. The cost sharing (proposal) is based On the surface of the extention vs. existing hall. EL will need a consolidation budget (from NA Cons) of 1’488 kCHF in addition to this sum.

7 MEF-Items A full FTE from MEF for the project coordination during the whole project.

8 Platform «jura side» Counting rooms Personnel access door with card reader Neutral gas panel MEF-Items

9 GS-ASE – M Dore, R Nunes, D Vaxelaire A safety hazard assessement with HSE is in progress

10 IT networks – Federico Lerda

11 Transport & handling - R Rinaldesi / I Ruehl Note: the two 40 ton overhead cranes are renovated on the consolidation project

12 Infrastructure items in WG2 - Summary

13

14 Funding problem EL-infrastructure

15 Thank you !

16

17 Direct stairs Stairs tower 1 Stairs tower 3 Stairs tower 2 Passerelle 1 Passerelle 2 Passerelle 3 Passerelle 4 Passerelle 5 Passerelle 6 Platform + passerelle 7 EHN1 extension Metallic structures Layout 14 th October 2015 H4 platform Unloading quay

18 A exist = 14500m3 A ext = 3600 m3 Consider that after the phase one, the whole extension and half of the existing hall is renovated; the sharing is (for common items): 33.2 % (extension) and 66.8 % on consolidation)