March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.

Slides:



Advertisements
Similar presentations
Parks and Recreation Commission Meeting April 10, 2006 Thunderbird Conservation Park Update.
Advertisements

Occupancy Classifications and Loads
Cathedral of the Immaculate Conception Project Information Session.
Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture The Trellis and the Vine Oakwood Presbyterian Church.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Existing Maximum Capacity = 240 (approx.) Comfortable Seating = 170 (approx. 70%) Current Sunday Attendance = 160 (approx.) During Awana Night, Every.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
2012 Town Hall Meeting. Parish History Master Plan Phase 1 Costs Next Steps Parish Survey 2012 Town Hall Meeting Questions + Answers Agenda.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
Transport.tamu.edu Parking Garage Feasibility Study TSAC December 5, 2012.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Feb 27, 2007 Informational Meeting 1 St Paul United Methodist Church Faith Works! “Building for Christ’s Ministry” Informational Meeting February 27, 2007.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Planning Back- of-House Support Areas Chapter 4 (c) 2014 by John Wiley & Sons, Inc.
Mary Lin Elementary School 586 Candler Park Drive Phasing Plan March 25, 2010.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
SAME GOAL: TO UNITE ON ONE SITE NEW DESIGN: MORE EFFECTIVE AND EFFICIENT REDUCED TOTAL COST: FROM $20 MILLION TO $17.2 MILLION BUILDING PROJECT UPDATE.
Grace Bible Church Ministry Goals & Master Plan Presentation.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
My house Brian Griffiths 1013 sq. ft.. Living room 15’2”-14’8” The living room is large enough to hold two couches and end tables and coffee tables The.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
EDWARDS CONGREGATIONAL UNITED CHURCH OF CHRIST CONGREGATIONAL MEETING July 10, 2011 SCHOLTZ GOWEY GERE MAROLF A R C H I T E C T S & I N T E R I O R D E.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.
GROWING THE DREAM. Welcome Purpose of Tonight “Growing the Dream”. No doubt you have seen and heard several bits of information or discussion on “Growing.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
SACRED SPACES UPDATE November 20, /20/111.
Counter & Cabinets Counter Cabinet Office Women Men Kitchen Area Dining Entrance ~30 FT ~80 FT Approximate Sizes – Not to Scale.
BUILDING COMMITTEE REPORT FELLOWSHIP BIBLE CHURCH “Together, one passionate pursuit: to know Him and make Him known” OSKALOOSA, IOWA.
Services Currently Provided  FHA/ADA Inspections  Bank Draw Requests  Existing Condition Documentation Services.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Design II (Final Project – a Capstone) Parish Center Design, Integrating program & form Program Statement: St. Patrick’s Roman Catholic in Mystic, CT is.
MALLORY, JESS, HAYLIE, AVERY, KENDALL KITCHEN. LOCATION Near the service entrance and the dining area Access to the main entry and the living room, but.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Will Rogers Memorial Center Multi-Purpose Building & Public Events Infrastructure Maintenance City Council Presentation January 26, 2010.
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
Government Center Study Update City of Creve Coeur December 8, 2014.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
Service Area Planning. Standard ACT-ADDI-1 Students will identify components related to the design process.
White Pigeon Community Schools
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
July 11, 2017.
St. Luke Lutheran Church
Forsyth County 2016 Bond Referendum
Building Committee April 20th, 2016.
Occupancy Classifications and Loads
“Gather & Grow” Agenda Welcome & Opening Prayer Monsignor Bronkiewicz
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Mary Queen of Apostles Facilities Master Plan Update
Albemarle County Public Schools
Troy School District Bond Program – Series 1 Construction Update
Occupancy Classifications and Loads
Fair Lawn BOE: Concept Planning
PHASE I NEW SANCTUARY BUILDING COMPLETE WORSHIP SPACE FOR 350
CV Futures Task Force Report May 8, 2017
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Park Place Wesleyan Gala 2019
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
Presentation transcript:

March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study

2 Agenda Review: Building Diagrams Opinion of Probable Costs Schedule: Timeline for Completed Study Questions and Discussions

3 Progress Tasks Completed to Date  Existing drawings reviewed  Site visits performed to collect initial data  General observation made of site drainage, adjacent site improvements and visible utility services  Meeting with City of Altoona to discuss known utility routing and storm water conveyance structures  Met with staff December 17 th to gather program information  Developed Conceptual Building Diagrams  Utility Survey Completed  Probable Costs Re-evaluated  Conceptual Building Diagrams Updated (Parish Hall Scheme A & D – Faith Development Center Scheme B & D  Conceptual Building Diagrams Updated  (Parish Hall Scheme A3 – Faith Development Center Scheme B3, B4 E & F)  Draft of Feasibility Study Completed  Parish Hall Scheme A3.1 & Faith Development Center B4.1

4 Building Concepts Parish Hall Addition Scheme A3  Enlarged Paris Hall to seat 512  Kitchen: 1000 sf

5 Building Concepts Parish Hall Addition Scheme A3.1  7630 sf Parish Hall (can be expanded) Seating Capacity  967 sf Kitchen serving Parish Hall  Dish pit and dish storage 120 sf  Dry Storage = 60 sf  Walk-in refrigerator = 80 sf, add 32 sf for freezer  Cold line(s) = 120 sf/cook (includes reach-in refers)  Hot line(s) =80 sf/cook (sauté, Broiler, Deep fry, etc. (includes cooking equipment and plating area)  Pass 60 sf (6'x10') This adds up to around 600SF to serve 350 individuals  Men’s & Women’s Restrooms (4 Fixtures/ 2 Lavatories each)  505 sf Table & Chair Storage  65 round tables (end) – 70 sf  65 flat stack tables – 140 sf  500 folding chairs – 150 sf  500 stacking chairs – 100 sf Worse Case 290 sf to 320 sf required

6 Building Concepts Scheme A3.1 Scheme B4.1 Parish Hall & Faith Dev. Center Scheme A3.1 & B4.1  A3.1 deletes parking spaces  B4.1 deletes 0 parking spaces  Existing trash enclosure would be relocated  Access to North/South parking lot eliminated (opt: access drive east of FDC)  Existing water main to remain  Fire rate east exterior wall of Parish Hall

7 Building Concepts Faith Development Center Scheme B4  3,500 sf Addition  New Entry off North Wing  6 double classrooms (600+ sf each)  ± 1,400 sf Childcare Center & Youth Ministry  ± 1,650 sf Activity Room  Add ADA Showers near Mech. Room. Toilets/ Kitchenette added for Youth Ministry  Faith Formation Directors Office included within Workroom  Kitchen expanded with secondary exit off existing Activity Room/ new Childcare Center

8 Building Concepts Faith Development Center Scheme B4.1  3,450 sf Addition  New Entry off North Wing  6 double classrooms (600 sf ea.)  1,412 sf Childcare Center  1,464 sf Youth Ministry  1,740 sf Activity Room (can be reduced to enlarged)  Add ADA Showers near Mech. Room. Toilets/ Kitchenette added for Youth Ministry  Faith Formation Directors Office included within Workroom  Secondary exit off existing Activity Room/ new Childcare Center STOR

9 Probable Costs Size: 18,500 sq. ft. addition and 269,000 sq. ft. renovation Cost: $22.5M base bid Site Improvements  $225,000 - $275,000 Utility Modifications  $150,000 East Drive Connection  $40,000 - $50,000 Misc. Paving & Landscaping Opinion of Probable Cost - $265,000 to $325,000 Optional: Add East Drive - $415,000 to $475,000 Building & Components  Parish Hall Addition (Scheme A3.1-12,500 sf) - $2,500,000 to $2,800,000  Faith Development Ctr. Add. (Scheme B4.1 -3,500 sf) - $650,000 to $700,000  Faith Development Renovation - $150,000 to $175,000  1985 Building Renovation - $320,000 to $370,000 Opinion of Probable Cost - $3,620,000 to $4,045,000 Optional: Add Sanctuary Addition - $545,000 to $615,000 Total Estimated Cost Range - $3,885,000 to $4,370,000 (w/o Sanctuary Add.)

10 Schedule Next Steps  Incorporate information gathered to date and complete feasibility study