Presentation is loading. Please wait.

Presentation is loading. Please wait.

Building Committee April 20th, 2016.

Similar presentations


Presentation on theme: "Building Committee April 20th, 2016."— Presentation transcript:

1 Building Committee April 20th, 2016

2 Family Life Center (FLC) Renovations
Finding and Proposals Family Life Center (FLC) Renovations

3 Bath Rooms With Showers General Events Volley Ball Basket Ball
Family Life Center – First Floor Bath Rooms With Showers General Events Volley Ball Basket Ball Entrance Class Rooms Tables & Seating Kitchen Area Bleachers

4 apartments or additional class rooms Additional class rooms
Family Life Center – Second Floor Space is large enough for missionary apartments or additional class rooms Additional class rooms Open Below to Gym Floor Connection Attic Unfinished Spaces

5 Roof & Outer Shell Second Floor (Unfinished) First Floor Volley Ball
FLC 3D Floor Overviews Roof & Outer Shell Second Floor (Unfinished) First Floor Volley Ball Tables

6 Site Overview with FLC attached Family Life Center
Site View Site Overview with FLC attached Family Life Center FLC attached behind existing offices Youth building sort of.. Current HVAC Location Front of Church

7 Conference room relocated Library relocated
Changes to the interior to make the connection Conference room relocated Library relocated Offices will be changed Shorter distance and no stairs Seniors have a long distance & stairs to travel

8 Hall way traffic Drainage Roof maintenance FLC connection
The sum of issues lead to another concept. Hall way traffic Drainage Roof maintenance FLC connection

9 New Roof Planes New Welcome Center

10 Questions or Comments?


Download ppt "Building Committee April 20th, 2016."

Similar presentations


Ads by Google