BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI 28.08.2014.

Slides:



Advertisements
Similar presentations
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Advertisements

PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
VFC-HD Andrea, Christos, Manoel, Tom, William.
SPS New Wire Scanner Mechanics Review
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Beam Wire Scanner for PS/SPS/PSB Update on Motor Supplier Investigations Dmitry Gudkov BE-BI-ML.
The Actuator and Control unit CERN wire-scanner development review J.Emery for the BWS team.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Refurbished Booster RF John Reid October 24, 2012.
Update on wire scanner impedance studies
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
The Stripping Foil Test Stand in the Linac4 Transfer Line
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Next Steps, Priorities, Strategy for Spares Ray Veness.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
News and hot topics Impedance meeting 14/04/2014.
TBTS Test Program & Schedule G. Riddone
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Impedance Working Group Update ICE meeting June 12 th 2013.
THE NEW FAST WIRE SCANNER DESIGN FOR THE PSB
Beam Wire Scanner for PS/SPS/PSB Motor Selection Dmitry Gudkov BE-BI-ML.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
News and Introduction from CERN June 15th, 2005
LIU Wire Scanner Project
Roadmap for triplet cryostats
Brief Status SPS Prototype PSB Prototype Installed in LS1
Wire Scanner / A.Demougeot
LIU Wire Scanner Milestones June 2017
Working plan for 2017 Acquisition and Control Electronics
Fast Wire Scanner Prototype Mechanical Design
Wire Scanner Mechanics
Status of the BI Work Package in the LIU-PSB frame
Renovation of the 45-year old PS magnets
Beam Wire Scanner for PSB
Tuesday 11th September LHCb dipole presently fault off
LIU Wire Scanner Series Costs
UK RFD Pre-Series cryomodule
Beam Wire Scanners (PS prototype and LIU series)
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Impedance working group update
Planning Quality control - Manufacturing logbook Photos Conclusions
LARP Rotatable Collimators for LHC Phase II Collimation
T-489: Induced Activity and Residual Dose Rates
Ferrites in BE-BI Preliminary Data
Presentation transcript:

BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI

Content test bench and acquisition system, Carlos Pereira presentation on possible break designs, Colin Grosjean consideration on the schedule, Bernd status of mechanical equipment, William BWSRE, B.Dehning 2

General Planning for the replacement of scanners in PSB, PS; SPS BWSRE, B.Dehning 3

Planning considerations Equipment BWSRE proto type 1 Consisting of vacuum tank and drum Vacuum installed in the SPS Drum to be installed in the SPS in January 2015 Missing designs RF shielding Brake (talk today by Colin Grosjean) Detailed planning needed Priority 1 BWSRE proto type 2 Consisting of vacuum tank and drum To be located in the LAB for Status, William Priority 3 Motor test set up Consisting of motor, shaft, fork To be installed in LAB, Priority 2 Pre- series (1 or 2 units) Changes to be included after redesign of existing prototype design Optimisation of inertia, fork, handling options, wire exchange procedure, motor options, brake options, thermal optimisation, RF optimisations,... Review of production cost and optimisation Priority BWSRE, B.Dehning 4

RF measurements on prototype 28/08 MORNING: Joseph and myself have finished to prepare the setup to start the measurements. We can now connect the hybrid to the carbon wire 14h00: Measurements (Christine, Nicolo, Joseph, Emiliano) 29/08 MORNING: Measurements (Christine, Nicolo, Joseph, Emiliano) 01/09: “Fritz tungsten wire” installation (Emiliano, BE- BI-ML) 02/09: Measurements (Christine, Nicolo, Joseph, Emiliano) 03/09 MORNING: Measurements (Christine, Nicolo, Joseph, Emiliano) 03/09 AFTERNOON: Short meeting in order to define the best location where we could put ferrite (ALL) 04/09 : Removing of tungsten wire + ferrite installation (Emiliano, BE-BI-ML) 05/09: Measurements (Christine, Nicolo, Joseph, Emiliano) 08/09: Meeting to discuss the results and to decide any further measurements (ALL) BWSRE, B.Dehning 5