East Area Day, 1 February 2012 Lau Gatignon / EN-MEF.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters.
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
East Area Secondary Beam Control User Guide L.Gatignon / AB-ATB 12 June 2008.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Reorganization of East Area Beam Lines 2 nd Status Report at IEFC Workshop L.Gatignon, 11/02/2010 EN.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
LG, 15 March 2007 ATB work for 2007 run1  Repair of ‘guillotine valves’  Repair converter (just after T4 TAX – quite radioactive !)  Invert order of.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
East Area Consolidation Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters 04 June 2015.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Lau Gatignon, EATM,  The construction of the CHARM and IRRAD zones is completed and operation at nominal intensity started yesterday.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Reorganization of East Area Beam Lines Status Report at ATOP meeting L.Gatignon, 06/03/2009 EN.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
Lau Gatignon / EN-MEF. L.Gatignon, IEFC Workshop, 22 March 2011What Future for the PS East Area 2 * Introduction * Present and foreseen activities in.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
RF separated beam and other beam issues Lau Gatignon, COMPASS workshop, 22 March 2016.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
CONS and HL-LHC day Analysis of needs from TE-EPC
CONS and HL-LHC day Analysis of needs from BE-CO
East Hall under construction
AD consolidation activities in LS2
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Joint Meeting SPS Upgrade Study Group and SPS Task Force
nuSTORM and the Physics Beyond Colliders workshop
East Hall under construction
2003 test beam with 25 ns bunched muons
How to control the local beam density
Experimental Areas – LS2 planning
Test Beamline System Requirements and Charge to PDR Committee
East Hall under construction
Presentation transcript:

East Area Day, 1 February 2012 Lau Gatignon / EN-MEF

 Introduction and Motivation - General introduction to present East Area - The different problematic issues - Changing user requirements - History of the present proposals  Design considerations for new layout  Proposal for a new layout  Overall consolidation program  Summary Lau Gatignon, The East Area of tomorrow2 Cost, staging and coordination: in a separate talk

 The East Area is among the oldest experimental areas at CERN  Its latest reincarnation dates from ~ 15 years ago (EHNL)  However, most of the infrastructure and equipment dates from the early 1960’s  Over the years the East Area has served a number of experiments and test beams, complementing facilities elsewhere at CERN.  Globally, the offer of medium and high-energy test beams has diminished dramatically over the years and the CERN test beams are almost unique world-wide.  Unfortunately the number of serious equipment failures is increasing and the repairs are often long and costly in dose …… Lau Gatignon, The East Area of tomorrow3

Lau Gatignon, The East Area of tomorrow4

Lau Gatignon, The East Area of tomorrow5 2 beams

 The driver of the present study was the repeated breakdowns of critical magnets (in particular F61S.BHZ01). W.Kalbreier pointed out in 2007 (ATC days) that the East Area requires as many resources in the magnet group as the North Area.  Some critical magnets are or were in the PS zone, difficult to access, and require a stop of the PS (+SPS + LHC) during their repairs. Examples: MNP23, SMH1,…  The majority of the other magnets are in the primary zone, covered by ~ 6 m of shielding. Any repair stops the whole of the East Area for several weeks.  The present East Area consists of 63 magnets of 22 different types, many without operational spares! Lau Gatignon, The East Area of tomorrow6

A non-exhaustive list of serious magnet failures:  End 2004: failure of F61S.BHZ01, premature end of DIRAC run  In 2006: 3new MNP23 magnets were installed, all failed within days. Each time ~1 week lost for the whole PS+SPS complex (now: +LHC!) Full year lost for DIRAC and IRRAD. Replaced by MCB magnet.  In 2010 replace MNP23 magnet in T9 by a spare. Initially leaking… Top momentum of T9 lowered from 15 to 10 GeV/c (12 GeV/c on request)  In 2011 premature end of run for T10 beam due to ZT10.BHZ1 leak plus a failure of ZT9.QDE1 (water leak, Q74magnet to be replaced by a different type)  IRRAD start in 2011 delayed by 10 days due to splitter jaw position fault  Three Q120 quadrupoles replaced in 2008/9 shutdown, two Q800 quads in T10 only hold up to 6 GeV/c (instead of 7), no spares available. Lau Gatignon, The East Area of tomorrow7

Lau Gatignon, The East Area of tomorrow8

 Up to 2006 the beam was dispatched to the North and South branches via the combination of a splitter magnet F61.SMH1 and a septum magnet (MNP23-type) F61S.BHZ01.  This allowed to serve on the same cycle the test beam complex and IRRAD (not DIRAC for beam quality reasons)  However, MNP23 is a very complex magnet (400 kW power consumption DC!) and needed extreme cooling flow. A fast interlock (20 ms sampling) ensured that the magnet would not over-heat.  At least 3 new magnets failed soon after their installation, some even before having seen first beam. The one in T9 was still running in Lau Gatignon, The East Area of tomorrow9

Lau Gatignon, The East Area of tomorrow10

 The rectifiers are very old (> 30 years for most of them). Many need to be replaced, for the more recent ones the thyristors need to be replaced.  The vacuum system is very old and has no remote control.  The marguerite targets are old, very radioactive and subject to faults. They serve not only as targets but also as TV screens, there for no monitoring of beam steering during physics. Lau Gatignon, The East Area of tomorrow11

 When the MNP23 magnet in F61S.BHZ01 was replaced by a C-shaped magnet (MCB) the facility to operate the test beams and IRRAD on the same cycle was lost.  New cycles were defined: EASTAfor the test beams (North branch) EASTBfor the DIRAC experiment EASTC for IRRAD  As at the same time the number of allowed EAST cycles was restricted because of the weakness of the PS main power supply, the East Area has suffered from a shortage of cycles since: duty cycle ~1% for the test beams for most of the time!  This shortage is aggravated by the presence of DIRAC and IRRAD Lau Gatignon, The East Area of tomorrow12

The radiation situation in the East Hall is not very pleasant, radiation levels being quite high in most of the primary one, in IRRAD and around the splitters. There are several reasons for this:  The splitter (when it was used like a splitter) leads to significant beam losses  The EASTA beam traverses partly (~50%) the North target and is dumped in or just after ZT9.BHZ1 (a delicate MNP23 magnet!), thus ‘polluting’ most of the primary zone. Equipment access in that zone is very awkward in that region.  There is no ventilation in the primary zones. The Ozone produced where the beam passes through air leads to severe oxidation of equipment  The shielding is weak in some places, e.g. around IRRAD. Lau Gatignon, The East Area of tomorrow13

Lau Gatignon, The East Area of tomorrow14 For most of the beam m0menta, the primary protons are dumped inside the MNP23 magnet ZT9.BHZ1…..

Lau Gatignon, The East Area of tomorrow15

 Until ~two years ago there was no useful instrumentation for beam tuning in the secondary lines (only XWCA chambers that provide no signal for typical test beam intensities). Now a DWC and a scintillator exists in each beam.  There are no beam loss monitors in the primary lines.  There are some old threshold Cerenkov counters(but H/W identical to WA and NA counters) in the test beams, but without electronics and only manual pressure control. PH responsibility.  Magnet control is with knobs and working sets. No useful beam file management (archives are not convenient for test beam users). No remote control for collimators. Instrumentation can only be used with expert programs. There is no local beam control in user barracks. Lau Gatignon, The East Area of tomorrow16 Suitable controls software exists in the North Area (Cesar) and can’ easily’ be adapted

 The building is ~50 years old, therefore the roof, insulation, windows are severely degraded or not up to present standards.  The presence of asbestos limits the scope of what can reasonably be done  Cooling and ventilation of the building is obsolete and not monitored. The primary zones are not ventilated.  The magnet cooling circuit is common to primary and secondary beams.  The electrical infrastructure is partly obsolete, e.g. 50 years old transformers, and needs serious consolidation. Many cables contain halogen.  Both cranes have become unreliable. There is no infrastructure attached for repairs at height (e.g.lighting)  The user barracks are obsolete, made of wood, with dangerous roofs. Lau Gatignon, The East Area of tomorrow17

 Many safety issues are related to radiation safety (see previous slides). The situation in and around the present IRRAD facility is marginal and access requires a stop (+ cool-down) of the whole East Area. The present radiation monitoring is still based on ARCON.  There is no access control to the building.  The access to a number of magnets and other beam equipment is cumbersome, dangerous from general safety and RP point of view  The obsolete state of infrastructure has potential safety implications.  A safety file must be prepared. Lau Gatignon, The East Area of tomorrow18

 It is understood that DIRAC will end this year.  CLOUD will continue. They have quite some infrastructure in T11, but space is very (too?) limited on the long term. They require a zone where they can do installation work on their detectors without compromising beam time for other users. See Antti’s presentation  The IRRAD facility will continue with intense programs for R2E and AIDA. These projects foresee some funding for upgrades. See Michael and Markus presentations.  The test beams are as important as ever. New users are coming, e.g. LC, tests, …. An overlap in energy range with the North Area beams seems important. The fact that the present beams do not allow to select specific particle types (e/h/  ) is making life more difficult for many users. Horst will summarize the user needs.  The ease of access to the beam areas is often a real advantage ( > 6’ in many NA zones)! Lau Gatignon, The East Area of tomorrow19

 In this context the idea of renovating the East Area came up in 2007, triggered by the repeated F61S.BHZ01 failures (W.Kalbreier, ATC days).  In 2009 a conceptual layout for a new East Area was proposed that addresses most of the issues outlined before (L.G., ABOC/ATC days), leading to a recommendation to prepare a detailed design.  This technical design was presented in 2010 with a cost estimate of ~1.5 MCHF for the change of beam layout (L.G., IEFC workshop). The need for consolidation was hinted at, but the cost was not yet evaluated.  During 2010 a working group, reporting to EATM, evaluated the full consolidation costs and reported to the 2011 IEFC workshop.  Following the workshop a full document (~80 pages) has been prepared and will be updated and finalized following the outcome of this EA day. Lau Gatignon, The East Area of tomorrow20

 Use fewer, but reliable, types of magnets with sufficient spares. No splitters, septa and other complex and delicate objects.  Improve access to the equipment, also by suppressing rarely used beam lines (T7, T11). Move CLOUD to behind T9. Improve beam performance to use beam time more efficiently.  Improve significantly the RP and general safety aspects. Restrict radiation to where it is necessary, by dumping unused protons cleanly and immediately after the targets.  Reduce intervention times as much as possible, by optimizing the layout of the shielding and zone separations.  Improve instrumentation and controls (Cesar as in North Area). Lau Gatignon, The East Area of tomorrow21

 The proton beam requirements for IRRAD’ are very similar to the present DIRAC beam. Do not change this beam as seen by the user. Abandon the T7 secondary beam and IRRAD-T7.  Combine the proton and mixed field irradiations in a single zone (T8). This improves proton economy and also allows better accessibility and shielding, with enough space to manage radiation properly. Access only stops this facility and not the North branch.  Provide two better test beams with proper instrumentation and control over particle type. Cover an energy range as large as possible (from ~0.5 to 15 and 12 GeV/c). The limit comes from available length ( L ~ √p )  Prepare proper documentation for operation, maintenance, safety, etc. Lau Gatignon, The East Area of tomorrow22

 The detailed proposal has already been presented in previous workshops. Technical details will be covered by the technical presentations in the afternoon session.  Here I will repeat a few key aspects of the new layout.  The only part that has not yet been presented is the proposed layout for the new IRRAD facility in T8. The overall layout will be shown here, but details for the proton and mixed field facilities will be covered in the presentations by M.Moll and M.Brugger. Lau Gatignon, The East Area of tomorrow23

Lau Gatignon, The East Area of tomorrow24

Lau Gatignon, The East Area of tomorrow25 NEW T8 PROTON BEAM OPTICS

Lau Gatignon, The East Area of tomorrow26

L.Gatignon, ATOP, 6 March 2009Reorganisation of East Area Beam Lines27 ~5x better transmission than present lines!Uses “ dummy magnets ” e±e± pure h ± ±± GENERIC NEW EAST AREA TEST BEAM OPTICS

Lau Gatignon, The East Area of tomorrow28

Lau Gatignon, The East Area of tomorrow29

Lau Gatignon, The East Area of tomorrow30

Lau Gatignon, The East Area of tomorrow31

Lau Gatignon, The East Area of tomorrow32

Lau Gatignon, The East Area of tomorrow33 PS zone Primary zone Sec. zone Open DIRAC Side shielding thickness 6 to 6.4 m (as now) 2.4 m roof shielding, i.e. 0.8 m Fe m Concrete Need ventilation (cf nTOF target area) Optimise entrance chicane Thickness of shielding 2.4 m (as shown before) Height of walls > 4 m to reduce sky-shine No roof shielding required Optimise access chicane Optimise target design (shielding vs intervention time) OK as it proposed Courtesy Thomas Otto (RP at the time)

Note: DIRAC to be replaced by IRRAD (see later)

Lau Gatignon, The East Area of tomorrow35

 Use T7 (EASTC) for protons and T8 (EASTB) for mixed field, where T8 is parasitic to DIRAC → Need two big proton users! Competition with DIRAC for proton spills.  Very limited space and shielding, limiting proton flux and leading to high doses to personnel.  No possibility to irradiate big objects or equipment requiring services  Access requires stop of the whole East Area plus long cool-down  CNRAD and H4IRRAD cannot cover all the needs Lau Gatignon, The East Area of tomorrow36 R2E proposal (mixed fields) → Markus Brugger talk AIDA proposal (protons) → Michael Moll presentation

 Use the space that will be liberated by DIRAC  Access independent of the rest of the East Area  Optimised layout for shielding and dose reduction to personnel, with ventilation, local shielding, infrastructure and space for easy accessibility  Provision for services  Can use same proton cycles for both facilities  Funding could be available from the projects  Aggressive time scale imposed by LHC needs (R2E) and AIDA project duration Lau Gatignon, The East Area of tomorrow37

Lau Gatignon, The East Area of tomorrow38

Lau Gatignon, The East Area of tomorrow39

Lau Gatignon, The East Area of tomorrow40

 The layout change per se has a cost of 1.5 kCHF + 3 FTE, the consolidation alone ≈12.4 MCHF + 15 FTE and the IRRAD upgrade ≈2 MCHF FTE  The consolidation activities will be presented in more detail in the afternoon sessions, at least for the more complex cases.  The civil engineering and CV efforts are strongly coupled and driven by the relative impossibility to remove all asbestos.  It is proposed to renovate only one of the two cranes (40 tons).  Electrical infrastructure and PVC containing cables will be consolidated respectively replaced. Lau Gatignon, The East Area of tomorrow41

 Rectifier consolidation is one of the bigger cost factors (2.8 MCHF)  The primary zone magnets shall get their own cooling circuit  The primary zone and IRRAD will be ventilated  Beam stoppers and targets will be renovated  The control rooms will be replaced by new ones conforming to safety standards (e.g. Algeco)  Migration from ARCON to RAMSES-II Details are available in the written report. Lau Gatignon, The East Area of tomorrow42

 A new layout of the East Area beam lines is proposed, that addresses a number of operational, technical, RP and safety issues  The cost of the layout change is small compared to the overall consolidation needs  The overall cost of the project is 16 MCHF, including an upgrade of the IRRAD facility which could be funded mostly by R2E and AIDA, depending on the timescales. Both request IRRAD’ in 2014  Details of costs and staging options will be discussed in the last session Lau Gatignon, The East Area of tomorrow43

 A detailed description of all aspects of the proposed renovation is available in the draft report (79 pages).  This report has been prepared with the help of many persons from different departments and groups.  The consolidation needs and proposals were discussed in many meetings through 2010 and 2011, with regular reporting to EATM.  The layout was based on many ‘private’ discussions with representatives of the user community (physics coordinators, spokespersons, test beam coordinators, important and small users, etcetera.  The purpose of today is to officially confront the proposals with the requirements, to validate or adjust the proposal in order to arrive at the best possible East Area for many years to come. Lau Gatignon, The East Area of tomorrow44

Lau Gatignon, The East Area of tomorrow45

Lau Gatignon, The East Area of tomorrow46

Lau Gatignon, The East Area of tomorrow47

Lau Gatignon, The East Area of tomorrow48

Lau Gatignon, The East Area of tomorrow49 MORE SPACE FOR T9 AND T10 AREAS