Presentation is loading. Please wait.

Presentation is loading. Please wait.

Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.

Similar presentations


Presentation on theme: "Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert."— Presentation transcript:

1 Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert Meiners for ALCPG11) Carsten Hast March 17 th 2011

2 Test Beams in Europe European AIDA initiative AIDA: Advanced European Infrastructures for Detectors and Accelerators 2011 to 2014 funds 28 Million Euros (8M from the EU) http://aida.web.cern.ch/aida/index.html Funds among many other things access to the test beams at CERN and DESY It’s a European initiative but not a closed club, so in order to participate hook up with your friends abroad… 2 C.Hast, ESTB workshop SLAC, March 2011

3 Beam Facilities at CERN North Area SPS Test Beams East Area PS Test Beams

4 East Area PS Test Beams

5 *) Intensity is for 1% momentum bite, nominal target and 2.10 11 ppp on target and intensity collimator(s) wide opened.  Spill 400 ms (could be > 500 ms at 20 GeV/c)  Some more intensity control exists for the primary beam (0.5-1.0) and via the target efficiency (~0.02-1.0). Typical Beam Parameters

6 CERN Test Beam 2010 AIDA Shifts : –600 (8h) in Test Beams –200 (8h) in Irradiation Facility Users at PS Test Beams : 20 Groups Users at SPS Test Beams : 46 Groups Users at Irradiation Facility : 18 Groups To apply for beam time and more info go to: http://sps-schedule.web.cern.ch/sps-schedule 6 C.Hast, ESTB workshop SLAC, March 2011

7 CERN Schedule Test beams are available PS T9, T10, T11, SPS H2, H4, H6, H8 2011 : begin May to mid November 2012 : begin May to mid November 2013 : no beams at all at CERN 2014 : maybe beams from the PS from mid of the year; Horst Breuker does not expect beams from the SPS 2015 : begin May to mid November everything depends on the performance of the LHC and its experiments; They have to reach 10 fb-1 in the run which started last weekend...

8 DESY Test Beam Facilities - Status and Plan Norbert Meyners, DESY ALCPG Workshop 2011 Eugene, March 19-23, 2011

9 Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, 2011 9 DESY Test Beam DESY provides three test beam lines with 1-5 (-6) GeV/c electrons Very simple system, no beam optics, just momentum selection via dipole magnet. Bremsstrahlung beam generated by a carbon fibre in the circulating beam of the electron/positron synchrotron DESY II. Photons are converted to electron/positron pairs with a metal plate. Beam is spread out into a horizontal fan with a dipole magnet. Collimator cuts out final beam.

10 Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, 2011 10 Test Beam Layout T21 T22 T24T24/1 MD Magnet MVD Telescope PCMAG AIDA Telescope

11 Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, 2011 11 Facilities for Test Beam User All three test beam lines have Interlock systems Magnet control Patch panels with preinstalled cables Gas warning systems Fast internet connection (DHCP) (100Mbit / 1Gbit possible) The user can ask for: Translation stages Premixed gases Big Dipole Magnet (1T) Superconducting Magnet (1T) Beam Telescopes: MVD Telescope MVD Telescope AIDA Telescope AIDA Telescope The users typically bring: Data Acquisition incl. computers Trigger scintillators

12 Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, 2011 12 Review 2010 13 User Groups 53 Weeks scheduled Severe accident Vacuum leak at one carbon fibre holder Unfortunately two were dismantled  lost two beams for 5 weeks (May/June)  Luckily we could squeeze all user in one beam area (24) Water leak at dipole magnet (24) (end May)  1 user lost 1 day  Provisional fix stayed until regular maintenance week Uff!  Exchange dipole magnet   Design and build new fibre holders   Installation in summer 2011 Leak Fibres Fibre Current Fibre Target

13 Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, 2011 13 Summary DESY test beam is running: Feb. 14 - July 10 and Aug. 15 - Dec. 21; 2011 Users can apply for beam time through DESY test beam coordinators  up to three weeks possible, longer terms negotiable testbeam.desy.de You can apply for test beam time at DESY Or contact: testbeam-coor@desy.de You can apply for financial support See aida.web.cern.ch

14 Summary Test Beams available: 2011 CERN, DESY, FNAL and a little bit ESTB 2012 CERN, DESY, ESTB (possibly hadrons later in ‘12) 2013 DESY, ESTB, FNAL 2014 CERN (maybe), DESY, ESTB, FNAL 2015 CERN, DESY, ESTB, FNAL ESTB will be a much appreciated addition to the dwindling portfolio of possible test beams 14 C.Hast, ESTB workshop SLAC, March 2011


Download ppt "Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert."

Similar presentations


Ads by Google