Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.

Slides:



Advertisements
Similar presentations
LHCb Velo Construction Authorisation steps Tony Smith.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
Barrel Module Database - Status Status of upload utilities Review of uploading SCTDAQ info Flagging Hybrid re-work Module Quality uploads Module Signoff.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Database Status and Progress Dave Robinson, SCT Week, September 2003 Overview New Developments - Metrology & Datasheet uploads/reporting - Module Quality.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
UK ATLAS SCT Module Quality Assurance Joe Foster, Manchester University 04 Jan 2005 All results compiled in time for Christmas…
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
J.R. Carter SCT Barrel Module PAR - Overview 1 14th May 2003 ATLAS SCT BARREL MODULE PAR COMPONENTS AND PRODUCTION OVERVIEW Janet Carter, Cambridge TOPICS:
SCT WeekDecember 3, Block of Low Gain Analysis and Solutions A. Ciocio - LBNL.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
ATLAS pixel module assembly flow
MODULE QUALIFICATION STATUS AT LIVERPOOL
Investigation on tray MID 063 Back
HIC Assembly - Liverpool
Radiation Laboratory Meeting
UCSB Hybrid Bonding & Testing
FNAL Production Experience
US Hybrid/Module/Rod Testing Model
US Module Testing Progress Report
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
US Module Testing Progress Report
Model 4-2: The Enhanced Electronic Assembly and Test System
Model 4-2: The Enhanced Electronic Assembly and Test System
FNAL Hybrid Testing Status
Presentation transcript:

Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz

Abe Seiden December 2003 SCT Week 2 Technical Status Production started 9/02 Qualification milestone passed 4/03 Two metrology systems in full use. 2 H&K wirebonders in use. No longer using the K&S machine as the H&K works very well. Regularly building modules inside all specs. 300 modules have been started, 237 classified, 189 screened. Regularly align and glue 6 sides per day. Can align and glue 5 hybrid sides per day. Real activity has been much less due to lack of hybrids. Considerable effort and re-direction of resources to deal with hybrid gold metallization and PA problems. Can now clean gold sufficiently to use hybrids in hand. These are being used but will run out in ~1 week. Full 483 module deliverable complete by 6/04 assuming component flow OK.

Abe Seiden December 2003 SCT Week 3 Hybrid Production Strongly coupled to deliveries and required effort on side studies (cleaning…) Gold metallization problem has been a big interruption since the last SCT week. Considerable work on cleaning aspects. Now can clean in Argon plasma, requires 6 minutes. Effect of Argon on PA appears bad – bond strength decreases, need to keep PA covered!! 291 (228) started (completed) total, 66 (52) since last SCT week. Release for production of low block gain hybrids crucial for maintaining production rate.

Abe Seiden December 2003 SCT Week 4 Module Assembly and Test Lingering problems –Re-alignments due to shifts or drifts during assembly which are time consuming –Handling issues, occasional damage in fixture operations Issues –Use of lower grade detectors – some are worse that modules already on hold. Implies these (old) holds should now be considered PASS.

Abe Seiden December 2003 SCT Week 5 Status 189 Modules Completed (tested) 162Pass all electrical tests (GOOD) 13 with noisy channels (see next slide) 8 Hold/Fail for leakage current 7 Hold for mechanical 3Gone to TB/Irradiation

Abe Seiden December 2003 SCT Week 6 Modules with block of noisy channels before after Several Modules have blocks of noisy channels that correspond to a dip in the gain in some cases. By increasing the Strobe Delay (“after” plots) the noise goes back to an uniform level (see a more detailed talk tomorrow). before after

Abe Seiden December 2003 SCT Week 7 Defective ASIC’s LGS ok to use with ISH=20  A BLG (~30 hybrids on hold) curable with bigger SD ASIC’s replaced = 65

Abe Seiden December 2003 SCT Week 8 Metrology: Midyf history Plot shows history since 11/02

Abe Seiden December 2003 SCT Week 9 Midxf (10  m)

Abe Seiden December 2003 SCT Week 10 Stereo Angle (130 mrad)

Abe Seiden December 2003 SCT Week 11 Sepf and Sepb (10  m)

Abe Seiden December 2003 SCT Week 12 Hole

Abe Seiden December 2003 SCT Week 13 Slot

Abe Seiden December 2003 SCT Week 14 Bad Channels per Module

Abe Seiden December 2003 SCT Week 15 Leakage Current of 4 Wafers

Abe Seiden December 2003 SCT Week 16 Leakage Current About 7% of individual detectors show breakdown above 350V after 4 wafer assembly. Except for a few, these exhibit rapid training/conditioning in seconds to few minutes after 500V. About 10% of modules also show breakdown above 350V just after wire bonding. Again most of these, exhibit rapid training/conditioning to stable, low currents. Correlation between breakdown at 4-wafer stage and after wire bonding to hybrid is only about 50%.

Abe Seiden December 2003 SCT Week 17 IV Curves After bonding

Abe Seiden December 2003 SCT Week 18 Module Categories We both classify modules as they are in the pipeline(as we go) and after tests are complete(or if they go to Hold, Fail, Rework). The yields are given for both all modules started and those completed tested/classified As of November 24. Modules started: 300. “Pipeline yield” –Modules Good finished or in pipeline:203(68%) –Modules Good+Pass finished or in pipeline:243(81%) –Modules Good+Pass+Hold finished or in pipeline:288(96%) –Modules Good+Pass+Hold+Rework finished or in pipeline:293(98%) Modules classified(tests done + Hold, Fail, Rework): 237. “Classified yield” –Modules Good: 143(60%) –Modules Good+Pass: 180(76%) –Modules Good+Pass+Hold: 225(95%) –Modules Good+Pass+Hold+Rework: 230(97%) Assembled modules with all tests done: 189

Abe Seiden December 2003 SCT Week 19 Hold Categories Metrology: 17 with parameters outside PASS –Module thickness – one case –Stereo: 0.168, 0.165, 0.165,0.135,0.138 –Sepf -23 –Midxf: -24,-23,-13,11.9 –Mhx,y: 59, 42, -42, 64,44,88 –This problem is largely solved, hold rate much lower in last 50 modules Leakage current IV>4  A w/o MD<350V: 6 Leakage glue: 8 –4 only in gap or minimal –4 with glue on surface but not on pads –Most of these occurred early, rate now is ~once every hundred modules. May be due to shim round-off error. Other: ~5 have slight mechanical damage on PA or on edge of silicon but otherwise perform well.

Abe Seiden December 2003 SCT Week 20 Fail and Rework Categories Metrology: 2 –Completely off due to wrong DIMS file –Vacuum failure during cure Broken or damaged: 5 –Accidents Reworks: 5 –3 are hybrids too high Have fixed one so far with hot wire to cut glue under foot Expect to repair others eventually –2 are bond damage Expect to repair with some add’n bad channel or leakage

Abe Seiden December 2003 SCT Week 21 Module Yields

Abe Seiden December 2003 SCT Week 22 Modules per week

Abe Seiden December 2003 SCT Week 23 Production Model Based upon deliverable of 483 modules Based upon current rate, increasing to >2/day later in the project Include measured delay between assembly and test completion Project ends 6/04

Abe Seiden December 2003 SCT Week 24 Conclusion Running well below capacity for hybrids –Decide on “block low gain” (hopefully release) this week. Release would keep us going until Christmas. –Need schedule projection. Currently projecting 550 module starts by mid- April 2004 (assuming availability of detectors). If hybrids available in time, project completion of module assembly/test by June ’04 Yield better, will keep trying to improve