28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.

Slides:



Advertisements
Similar presentations
Electronic Troubleshooting
Advertisements

24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
LV and HV status of the RPC system RPC detector and trigger group.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Status of the CSC Track-Finder Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
Power Protection for Staves/Supermodules Two Approaches Purpose of circuit: Provide an alternate current path for serial power current on the module level.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
Beam Noise APEX May 1, 2009 Carl Schultheiss Michiko Minty.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Digital CFEB (an Update) B. Bylsma, EMU at CMS Week, March 16, Ben Bylsma The Ohio State University.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
CMS livetime during last week’s runnin 11 Sep 2012G. Rakness (UCLA)1 Fills  1.02/fb delivered, 0.98/fb recorded 96.1% live ~2.4% not running.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
FONT5 digital feedback boards
Results with the RPC system of OPERA and perspectives
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
CSC EMU Muon Port Card (MPC)
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
Online Software Status
University of California Los Angeles
University of California Los Angeles
The Ohio State University
Analysis of Oct. 04 Test Beam RPC Data
University of California Los Angeles
MSP432™ MCUs Training Part 6: Analog Peripherals
CSC Turn ON Status Report by Fred B.
Configuring the Peripheral Crates
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values of currents for all on- chamber electronics components at point 5 –See later slides… –Would like to finalize values to send to Valeri to implement “out of range” alarms in DCS…

28 Jan 2009G. Rakness (UCLA)2/15 Overview (cont.)… Upgraded online software to make the flagging of configuration errors depend on the “problem_mask.” –If (configuration error != configuration error expected) then output is red –(Used to be: if (configuration error) then output is red…) Turned on full set of CSC’s underground today… –One OPFC+Maraton not working, to be addressed by Petr tomorrow… –Checked firmware on entire system… After Misha’s work, much firmware will need to be loaded… Daily CSC commissioning phone meeting started (again) – … Meeting ID = 2175 –17h30 CERN time –There is also a DCS phone meeting at 17h00, ID = 5566… Any interest in a public google calendar for CSC events? –I already have one, it is just a matter of making it public…

28 Jan 2009G. Rakness (UCLA)3/15 ALCT turn-on curves Executive summary: Features in scope traces understood No “smoking gun” seen in traces to be a likely cause of blowing fuses on the ALCT At the commissioning phone meeting Monday 26 January 2009, it was decided to power up the system as soon as we could… More scope traces and explanations can be found at…

28 Jan 2009G. Rakness (UCLA)4/15 1.8V current on ALCT as ALCT is powered on…  Blue = 1.8V current Several features seen as the ALCT powers up… 1)Large current spike 2)600msec of small current draw 3)200msec of 500mA (full) current draw 4)~30msec of small current draw 5)Full current draw Features similar on 3.3V line… To be explained on subsequent slides

28 Jan 2009G. Rakness (UCLA)5/15 Powering-On the Peripheral Crate Recall: there is a specific sequence to the voltages which are enabled when we turn ON the peripheral crate… Enable power to 1.5V… pause 150ms For (TMB/DMB pair 1 to 9) –Enable pair… pause 150ms –N.B. When DMB powers on, it enables the power to the ALCT… Additional pause 150ms Enable Crate Controller… pause 100ms Enable MPC/CCB –Clock on

28 Jan 2009G. Rakness (UCLA)6/15 Feature 1) Current spike during voltage ramp Yellow: 1.8V voltage (inverted) Blue: 1.8V current (50mV/div = 5A/div)… peak at ~30A Time scale = 200  sec/div  From this trace, I 2 T = 0.18 A 2 -sec at ALCT power-on…  Rating of ALCT fuse (A. Madorsky) = 1.6 A 2 -sec  The inrush of current at ALCT power-up is probably not causing fuses to blow… (similar for 3.3V line) ME+1/2/15  Powering on the DMB enables voltage to the ALCT. This charges up the bypass capacitors on ALCT (and capacitance of floating scope…?)

28 Jan 2009G. Rakness (UCLA)7/15 Features 2) and 3) Time between spike and large current Feature 2) The FPGA is idle until the CCB is powered on. Feature 3) When the clock is powered on, the FPGA programs… Yellow: 3.3V voltage Blue: clock at ALCT  The time between ALCT power-on and the clock depends on where the DMB is located within the crate… (The noise on 3.3V voltage curve [coinciding with clock] is due to the ungrounded scope.) ME+1/3/28

28 Jan 2009G. Rakness (UCLA)8/15 Feature 2) (detail) Hard resets seen as each TMB/DMB pair is powered on… Yellow – 3.3V power Blue – hard reset Magenta – INIT Green – DONE Note: all resets come when there is no clock, so they have no effect… ME+1/2/15 FPGA hard-resets are seen as each TMB+DMB pair is powered on…

28 Jan 2009G. Rakness (UCLA)9/15 Features 4) and 5): after FPGA programmed, ~30msec current dip followed by full current ME+1/2/15 Dip in ALCT core current from ALCT FPGA reprogramming due to hard reset sent from CCB after its FPGA is programmed Yellow – 3.3V power Blue – hard reset Magenta – INIT Green – DONE Note: This is an intentional feature of the CCB firmware…

28 Jan 2009G. Rakness (UCLA)10/15 All hard reset and clock features go away if DMB fully controls power-on… Blue: 3.3V current Note: regular FPGA power up and configuration. The first ~30 ms of low power consumption is configuration time, then normal operation. No strange artifacts as seen with CRB turn on. Is it worth the effort to rework the power-on sequence to achieve this? Probably not… ME+1/3/28

28 Jan 2009G. Rakness (UCLA)11/15 Distributions of Current for On- Chamber Components Goal: to determine values beyond which the Detector Control System (slow controls) should raise an alarm

28 Jan 2009G. Rakness (UCLA)12/15 On-chamber Currents  ALCT ALCT288ALCT384 Red lines indicate (update to) proposed high/low alarm set points for DCS… (1.8V current has been lowered from 0.4A  0.3A) Data from LVDB read through DMB using XMAS monitoring (J. Liu)  Values consistent with values in DCS database (X. Yang)

28 Jan 2009G. Rakness (UCLA)13/15 On-chamber Currents  ALCT and CFEB ALCT672CFEB … if current limits for ALCT are OK, I will send to V. Sytnik to implement after this meeting…

28 Jan 2009G. Rakness (UCLA)14/15 13 Chambers Outside of ALCT Limits 4 cases: ALCT's which have been or will be replaced –either from a blown fuse or some other problem... 4 cases: exhibit the “smoking gun” of an EEPROM losing its program, i.e., a bit going from 1  0 –1.8V current ~0.1A 4 cases: looks like a "bad read" –read 0 on both 1.8V and 3.3V line –I believe we should not error on these, but read the values again... OR, we need to read the ALCT ADC as well as the LVDB currents... 1 case: not known –Low (non-zero) values on both 3.3V and 1.8V lines –Maybe we need to read the ADC as well as the LVDB currents... Oftentimes, when it is bad on one line, it is bad on the other: ALCT288: 5 chambers bad... 3 bad on both 3.3V and 1.8V criteria ALCT384: 4 chambers bad... 2 bad on both 3.3V and 1.8V criteria ALCT672: 4 chambers bad... 2 bad on both 3.3V and 1.8V criteria

28 Jan 2009G. Rakness (UCLA)15/15 To do Continue towards getting a cosmic ray run going at point 5 Attempt to measure time-of-flight in beam- halo or CRAFT data… Upcoming talks: –CSC Trigger Primitives at L1 Trigger Online Software Review (Thursday 5 Feb.) –RAT results at RPC Detector Performance Group meeting (Tuesday 3 Feb.)

28 Jan 2009G. Rakness (UCLA)16/15 Backup

28 Jan 2009G. Rakness (UCLA)17/15 Probe Measurement Locations (ALCT288 schematic) = voltage measurement point… Voltage curves measured at power- supply input relative to ground of chamber (full bandwidth) = voltage measurement drop points (  current)… Current curve behavior seen by measuring voltage drop across (fuse+10m  resistor) at power-supply input with 20MHz bandwidth filter Curves measured with floating scope…

28 Jan 2009G. Rakness (UCLA)18/15 3.3V current when power-on the DMB (ALCT)  3.3V current spike with CRB turn on Yellow: 3.3V voltage (inverted) Blue: 3.3V current (50mv/div = 5A/div) ME+1/3/28 Similar behavior as on the 1.8V line…