East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
City of Cudahy Packard Avenue Streetscape Project INFORMATIONAL MEETING #2 Prepared for the City of Cudahy Common Council Packard Avenue Businesses & Property.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Contact: Beth Morris
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
SOUTH TAMA COUNTY COMMUNITY SCHOOL DISTRICT SAFE ROUTES TO SCHOOL
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Rantoul Street / 1A Reconstruction Project December 10, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
2 INTRODUCTION Town of North Andover Bruce Thibodeau, P.E. – Director of Public Works Curt Bellavance, AICP – Director of Community Development – Director.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Tuesday, November 29, 2016 Meriden Public Library
The I-465 West Leg Reconstruction Project
Hesperian Boulevard Corridor Improvement Project San Lorenzo
Marina Vista Streetscape Project
District 3 Complete Streets Projects
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
Stanford Avenue/El Camino Real Intersection Improvements Project
Clinton Street Bridge over the Maumee River
IA 122 RECONSTRUCTION PRE-BID MEETING
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Motor Row Streetscapes
SE 12th Street Roadway Improvements February 8, 2005.
SW 6th Ave. – Fairlawn to Gage
S.R. 26 Road Rehabilitation in Clinton County
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Project Location: 35th Ave HSIP8
Presentation transcript:

East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting

Design Team Introductions Nathan Thiel, City Administrator Rob Nelson, Director of Public Works Jeremy Krachey P.E. WisDOT Southwest La Crosse Quirin Klink, P.E. MSA Professional Services Brian Huibregtse, P.E. MSA Professional Services Oscar Ian Winger P.E. WisDOT Southwest La Crosse

State Street (USH 12) Anticipated Project Schedule Pubic Information Meeting #1November 2012 Pubic Information Meeting #1November 2012 Business Meeting #1November 14, 2013 Business Meeting #1November 14, 2013 Public Information Meeting #2 November 14, 2013 Public Information Meeting #2 November 14, 2013 Real Estate Acquisition Process Fall/Winter 2013 Real Estate Acquisition Process Fall/Winter 2013 Plans due to WisDOTAugust 2014 Plans due to WisDOTAugust 2014 Construction Spring thru Late Fall of 2016 Construction Spring thru Late Fall of 2016

WisDOT Project Overviews State Street, USH 12 Hanover to Pine (2016) WIS 58/82 Redesignation (Completed 2013) US 12/16 & WIS 58/82 (Completed Fall 2012) EAST WIS 82 (Completed Fall 2012)

State Street (USH 12) Project Need Deteriorating Pavement Deteriorating Pavement Crumbling Curb & Sidewalks Crumbling Curb & Sidewalks Safety Safety Congestion Congestion

State Street (USH 12) Typical Section

State Street (USH 12) Streetscape Enhancements Stamped Terraces Stamped Terraces Decorative Streetlights Decorative Streetlights Colored Crosswalks Colored Crosswalks New Traffic Signals New Traffic Signals Curb Bump-outs Curb Bump-outs

State Street (USH 12) Proposed Project

State Street (USH 12) State St & Division St Intersection Install new actuated traffic signals Install new actuated traffic signals Colored crosswalks with reduced crossing distance for pedestrians Colored crosswalks with reduced crossing distance for pedestrians Additional width for bike accommodations (Required per Federal Mandate, TRANS 75) Additional width for bike accommodations (Required per Federal Mandate, TRANS 75) Changes to parking Changes to parking West approach: Reduced 4 spots West approach: Reduced 4 spots East approach: Reduced 6 spots East approach: Reduced 6 spots Net Gain of Parking: 17 spots Net Gain of Parking: 17 spots South approach: Added 3 spots South approach: Added 3 spots City Lot: Added 24 spots City Lot: Added 24 spots

State Street (USH 12) Construction Staging Closed to Through Traffic Closed to Through Traffic  Detour Route (I90/94) Staged for Local Vehicular Access Staged for Local Vehicular Access Pedestrian Access Pedestrian Access

State Street (USH 12) Detour Route

State Street (USH 12) Construction Staging Cont. 2 Main Segments of Construction 2 Main Segments of Construction  Division St to Pine St (Stage 1)  Hanover St to Division St (Stage 2) Each segment will be ~3 Months Each segment will be ~3 Months Division Street: Mill & Overlay (Stage 3) Division Street: Mill & Overlay (Stage 3)

During Construction During Construction During Construction Be Prepared Be Prepared Be Involved Be Involved Stay Positive Stay Positive

Final Comments Known Existing Utilities Known Existing Utilities Please Remember to Sign In Please Remember to Sign In Real Estate Acquisition Real Estate Acquisition Timbers-Selissen Land Specialists, Inc. Timbers-Selissen Land Specialists, Inc.

East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting

State Street (USH 12) Detour Route With Alt I90/94 Route With Alt I90/94 Route

State Street (USH 12) State St & Division St Intersection Cont. Terrace Width Reduction/Elimination Terrace Width Reduction/Elimination  Would violate ADA guidelines  Clearance issues with lights, signs, and signals Removal of Traffic Signals Removal of Traffic Signals  Intersection Traffic Study was completed  Signal Warrants were still met  Would increase difficulty for pedestrians to cross the road Eliminate Turn Lanes Eliminate Turn Lanes  Needed to maintain safety and operational efficiency  Long queues, delay, and decreased safety if eliminated Alternatives Investigated