1 Contact: Beth Morris 317-638-9432 beth@westindydev.org

2 Morris Street Complete Street Plan The Morris Street Complete Street Plan proposes: Continuous pedestrian and bicycle connections along Morris Street between the future Eagle Creek and White River Greenways  Improved sidewalks, street trees, medians and crosswalks at key intersections;  Curb bump-outs and planters to define parking zones and reduce crosswalk width;  Alternative stormwater management practices; GOALS

3 Morris Street Complete Street Plan The Morris Street Complete Street Plan proposes:  Enhanced transit stops;  Bicycle connection to the White River Greenway trailhead to be constructed in 2011 at I-70 and Kentucky Avenue;  Rerouting truck traffic and the reallocation of travel lanes to allow bicycle and pedestrian facilities within existing right-of-way; and  Purchase of right-of-way (or donation) from major institutions such as IPL to incorporate pedestrian accommodations and minimize the removal or relocation of major utility poles GOALS

4 Morris Street Complete Street PlanCONTEXT Alternate truck routes: From the west: exit I-70 at Holt Road. Exit/use Tibbs Avenue From the north: use Washington Street (W) or Oliver Ave (E) From the east: use Kentucky Ave South: use Minnesota / Kentucky Ave

5 Morris Street Complete Street PlanKEY PLAN Key Transitions: 1 – Eagle Creek Greenway Gateway: gateway node; connect bicycles and pedestrians to greenway system 2 – Tremont Street Gateway: transition from multi-use path to separated bike sharrow and sidewalk 3 – Belmont Village Mixed-Use Center Gateway: transition from 4 lanes to 2 lanes with dedicated parking 4 – Harding Street Intersection Gateway: improved pedestrian connectivity to Health Center and reasonable accommodation for WB50 trucks 5 – Kentucky Avenue Gateway: vehicular lane transitions, transition from bike sharrow to multi-use path 6 – White River Greenway Gateway: gateway node; extend bicycle and pedestrian facilities over the bridge

6 Morris Street Complete Street PlanKEY PLAN Neighborhood Commercial District Visualization on-street parking tree lawns where space allows improved and widened sidewalks where space allows re-routed truck traffic street furnishings: light fixtures, banners, improved transit shelters, benches

7 Morris Street Complete Street PlanIDENTITY ELEMENT CONCEPTS Identity Element Concepts identity logo enhanced bus shelters decorative street lights gateway features sitting nodes, wayfinding signage, bollards

8 Morris Street Complete Street Plan1 - EAGLE CREEK GREENWAT GATEWAY CONCEPT

9 Morris Street Complete Street Plan2 – TREMONT STREET GATEWAY CONCEPT

10 Morris Street Complete Street Plan3 – BELMONT VILLAGE MIXED-USE CENTER CONCEPT

11 Morris Street Complete Street Plan4 – HARDING STREET GATEWAY INTERSECTION CONCEPT: ROUNDABOUT * * see geometric plans for conventional intersection option

12 Morris Street Complete Street Plan5 – KENTUCKY AVENUE GATEWAY CONCEPT

13 Morris Street Complete Street Plan6 – WHITE RIVER GREENWAY GATEWAY CONCEPT

14 Contact: Beth Morris 317-638-9432 beth@westindydev.org THANK YOU! Preliminarily Geometric Layout Plans available

15 Morris Street Complete Street Plan1 - GEOMETRIC LAYOUT PLAN: Eagle Creek to Warman

16 Morris Street Complete Street Plan2 - GEOMETRIC LAYOUT PLAN: Warman to Bedford Street

17 Morris Street Complete Street Plan3 - GEOMETRIC LAYOUT PLAN: Bedford to Tremont Street

18 Morris Street Complete Street Plan4 - GEOMETRIC LAYOUT PLAN: Tremont Street to Sheffield Ave

19 Morris Street Complete Street Plan5 - GEOMETRIC LAYOUT PLAN: Belmont Intersection

20 Morris Street Complete Street Plan6 - GEOMETRIC LAYOUT PLAN: Kappes to Shepard St

21 Morris Street Complete Street Plan7 - GEOMETRIC LAYOUT PLAN: Shepard to Reisner Street

22 Morris Street Complete Street Plan8a - GEOMETRIC LAYOUT PLAN: Harding Street Roundabout Option

23 Morris Street Complete Street Plan 8b- GEOMETRIC LAYOUT PLAN: Reisner to Harding Street: Conventional Intersection

24 Morris Street Complete Street Plan9 - GEOMETRIC LAYOUT PLAN: Harding to Railroad Overpass Conventional Intersection

25 Morris Street Complete Street Plan10 - GEOMETRIC LAYOUT PLAN: Division Street Intersection

26 Morris Street Complete Street Plan11 - GEOMETRIC LAYOUT PLAN: Division to Kentucky Ave

27 Morris Street Complete Street Plan12 - GEOMETRIC LAYOUT PLAN: Kentucky Ave Intersection

28 Morris Street Complete Street Plan13 - GEOMETRIC LAYOUT PLAN: White River Parkway W Intersection

29 Morris Street Complete Street Plan14 - GEOMETRIC LAYOUT PLAN: White River Parkway E Intersection

30 Morris Street Complete Street Plan 15 - GEOMETRIC LAYOUT PLAN: Kentucky Ave Bike Lanes to Greenway Trailhead