Emulsion Gluing Bologna Group Outline: - Adhesive tape - PVC frames - Vacuum supports for emulsion - 2 nd gluing machine.

Slides:



Advertisements
Similar presentations
D-Cal production preparations in Japan Dec. 16, 2009, D-Cal meeting at CERN Tatsuya Chujo (Univ. of Tsukuba) for the D-Cal Project 1.
Advertisements

Shear Tests - DIPTEM Genova Adhesive tape NITTO DENKO 30 µm thick Adhesive tape NITTO DENKO 30 µm thick Adhesive tape 3M 9461P – 30 µm thick Adhesive tape.
Gluing Tests - DIPTEM Genova - Adhesives Shear tests with four different adhesive types: Adhesive tape NITTO DENKO 30 µm thick Adhesive tape NITTO DENKO.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
MAGIC II Mirrors and reflector M. Doro Udine. MAGIC Collaboration Meeting. 2006/05/10-13.
Status Update on Mechanical Prototype in Rome November 6,
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Edge Scanning: new plate design for the European Scanning System G. Sirri for Bologna group.
PEANUT Brick Scanning for NETSCAN by S-UTS Kunihiro Morishima F-Lab Nagoya University BL118 Peanut Fermi Lab 2007/01/22-23.
November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
Study of the fragmentation of Carbon ions for medical applications Protons (hadrons in general) especially suitable for deep-sited tumors (brain, neck.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
PEANUT exposure summary and brick distribution and Situation of PEANUT analysis Fermilab.
CSd scanning report from LNGS Nagoya OPERA workshop January 22 nd, 2008.
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Aluminum bellows for experiments
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Hybrid Integrated Circuit
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
G.Sirri – INFN Bologna videconf Fiducial Mark Finding with ESS 1/6 VersionDateBinarySourceConfigNote zip same as 62 Recommended.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
LNGS 25 May 2005 G. Sirri – INFN BO1 Test of a dry objective with correction collar Dry objectives having an high numerical aperture give aberration when.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
PLATE CHANGER for OIL microscopes Gabriele Sirri INFN Bologna for INFN Bologna and LNGS.
Status of European Scanning System (Bari, Bern, Bologna, Lyon, Napoli, Neuchatel, Roma, Salerno) The final fast version is ready and working up to 20 cm.
G.Sirri – INFN Bologna 1/19 Lateral X-ray marks finding with ESS  Goal: implementation of the lateral mark finding in the ESS software  First Test: Plate-to-plate.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
Brick gas tightness & emulsion-lead compatibility Opera Collaboration Meeting Hamburg, June 2004 F.Laudisio, G.Romano, C.Sirignano Salerno Emulsion.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
Gluing machine (scanning at the edge…) G. Sirri for Bologna Group.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
TecnoCut PlateChanger Set Up / videoconferenceG.Sirri - INFN Bologna1 HARDWARE (complete):  both glued / not glued emulsion setup  cabling.
Shear test with irradiated samples NA62 - DIPTEM Genova – UCL
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Emulsion handling tools for plate changer oil solution N. D’Ambrosio (LNGS Group) LNGS May 2006.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Emulsion processing at Gran Sasso a brief update The new building Meetings between Company’s management and GS staff to fully define the project ‘Work.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
Company Profile UNNAM CO., LTD. unnam.koreasme.com
Update on Pavia MM mechanical prototype
Edge Scanning: new plate design for the European Scanning System
Shear test with irradiated samples
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
Beam Wire Scanners (PS prototype and LIU series)
RPC HV&LV status Introduction HV power supply tender
Module Production in Brussels
Gluing machine A semi automatic machine to glue emulsion plate on adhesive tape (as done by Japanese colleagues) was realized and delivered to Bologna.
Status of Readout Boards
Overall time schedule of SRF activities
Presentation transcript:

Emulsion Gluing Bologna Group Outline: - Adhesive tape - PVC frames - Vacuum supports for emulsion - 2 nd gluing machine

INFN Bologna LNGS Adhesive tape and PVC frame Acrylic adhesive tape: NITTO model 31RH or model 3161B (flame retardant for European market) Roll size: 128 mm, 50 m, 80 µm thickness, 1 Roll ~ 5 brick - 20 rolls available at LNGS (model 3161B) price: 60 euro/roll + IVA (20%) rolls sent from Japan to LNGS (model 31RH) Total:180 rolls ~ 900 brick PVC frame: Rigid PVC frame, 300 µm thickness Size: 155 mm x 130 mm (external) Price: 5.06 euro/brick + IVA (20%), delivering time: 3 weeks a few hundreds of frames are at LNGS 2400 frames (40 bricks) ordered, will be delivered at LNGS within 2 weeks Total: 2700 frames ~ 45 brick Manufacter: THE-MA srl, Pordenone, Italy Emulsion PVC frame

INFN Bologna LNGS Vacuum support and 2 nd gluing machine Vacuum support for emulsion New support with larger channel (size: mm x mm) designed Production: 3 prototypal plates (1 LNGS, 1 Naples, 1 Bologna) 3 plates already at LNGS 10 plates are ready and will be distributed Monday 16 th 4 plates will be finished within the next week 20 more glass already ordered at Gestione Silo, Scandicci (FI), Italy could be assembled by the INFN Bologna workshop within the end of July Second gluing machine To be ordered at CON-MED, Concordia (MO), Italy Cost: 7800 euro Delivering time: ~ 2 months