J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD 96-0042 12/8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)

Slides:



Advertisements
Similar presentations
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Advertisements

Tam Valley School Modernization - Phase 1 Summer 2011.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Administration & Finance November 18, 2014 Utility Corridor and Roadway Relocation Project Update (UCRR)
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Elevations.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
2009 The Physical Environment
drawings DRAWINGS DIFFERENT TYPES ? Architects working drawings Block Plan Site Plan General Location Plan Detail Drawing component part drawing.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Improving smoke control and protecting lives Air Sealing Industrial, Commercial, Institutional and Multi-Family Buildings to Improve Smoke Control.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011.
Lecture 23 Site Selection. Layout and Design of Grain Storage Systems  Two general (guiding) principles:  closed loop - deliver or receive grain from.
Building Plans.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
22 Elevations Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Introduction to Elevations Elevation –An.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Planometric Views (room corner). GC Credit Paper – 2002 – Question 3 An Elevation and Plan of a room layout are shown. Using the given sizes and start.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
Competency: Draw exterior elevations
Affordable housing project
FLOOR PLANS WHERE IT ALL BEGINS. FLOOR PLANS 1.Column Grids Backbone of all the documents, especially the floor plans Alpha characters horizontal Numeric.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 4.
Park Side Elementary West Side Elementary Marshall Middle School Marshall High School Proposed Security/Safety Improvements.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
R-100 Expanded View Reference Only Replace Dedicated Outside Air System, B2484 MPLS 17-A021 Drawing Index: R-100 – Project Location R-101 – Site Pictures.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
White Pigeon Community Schools
NuMI - Shutdown – Week 9 Horn 2 Repair – Successfully Tested the Repaired RAW Leak Drained and Refilled Horn 1 and 2 RAW Systems Changed Horn 2 DI Bottle.
Drawing Interpretation
Construction Project Management
Architectural Drafting
RESIDENTIAL DESIGN PROJECT
DrawING exterior elevations
Competency: Draw exterior elevations
Mission Hall Updates Ask & Learn Christine Shaff UCSF Real Estate
WHERE IT ALL BEGINS.
1 Semester Project Design A Multi Story Office Building
Troy School District Bond Program – Series 1 Construction Update
2007 Bond Issue Capital Improvement Program
Location Plans & Site Plans
G kitchen What makes you special!
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
n/o back to back kitchens
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Stoughton Public Library
Presentation transcript:

J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift) 2. Chiller line-vertical work 2 weeks (2 nd shift) 3. East side duct chase work 2 weeks (2 nd shift) (4 weeks for material and weekend delivery) 1. Phase 1 to 6 60 days per phase + 7 days for relocation per phase 4. West side duct chase work 2 weeks (2 nd shift) (4 weeks for delivery and weekend delivery) 5. Electrical pre-phase Night or weekend work performed at any time prior to phase 1 PRE-PHASE: PHASE: 1. Exterior chilled water lines (6-8 weeks +/-)

SITE LAYOUT PLAN HAFB 1305 HVAC Repair Solicitation # MXRD Drawing title: J&J #01 Description: Site layout Date: Start date: TBD upon approval Completion date: End of contract Bestic Drive Schilling Circle Building 1305 Construction trash chute (window to removed on 2 nd and 3 rd floor as needed) Proposed 30’ x 10’ storage trailer to be located on grassy area of the east side of the building. Proposed 30 yard dumpster Proposed generator location Construction staging limit Construction trash chute (window to removed on 2 nd and 3 rd floor as needed) Proposed dumpster. 3 parking spots will be taken out of commission during phases 2,4, and 6 Proposed location of Owner’s recycling and regular dumpsters

UNDERGROUND CHILLER WATER PIPING HAFB 1305 HVAC Repair Solicitation # MXRD Drawing title: J&J #01 A Description: Underground chiller water piping Date: Start date: Feb. 15 th, 2010 Completion date: TBD upon approval Chiller line BUILDING 1305 Bestic Drive Schilling Circle ***Underground chiller line to start on Feb. 15 th (weather pending). ***Traffic to be detoured at intersections to allow access to 1305 and entrance to lot. ***30 parking spots at lot around Schilling Circle to be decommissioned for excavation.

PRE-PHASING: 3 rd Floor: Chiller lines and duct chase HAFB 1305 HVAC Repair Solicitation # MXRD Drawing title: J&J #02 Description: Prephase- 3 rd Floor: chiller water lines and duct chase Date: Start date: TBD upon approval Completion date: Remove window for trash chute Chase for chilled water lines 3 rd floor west duct chase ***Refer to appendix #1 for a list of office areas affected by this work*** 3 rd floor east duct chase ***Refer to appendix #1 for a list of office areas affected by this work*** Temporary protection PRE-PHASE Duct chase East side- 3 rd floor PRE-PHASE Duct chase West side- 3 rd floor

PRE-PHASING: 2 nd FLOOR: Chiller lines and duct chase HAFB 1305 HVAC Repair Solicitation # MXRD Drawing title: J&J #03 Description: Prephase- 2 nd Floor: chiller water lines and duct chase Date: Start date: TBD upon approval Completion date: 2 nd floor west duct chase ***Refer to appendix #1 for a list of office areas affected by this work*** Chilled water line chase Removed window for trash chute 2 nd floor east duct chase ***Refer to appendix #1 for a list of office areas affected by this work*** PRE-PHASE Duct chase East side- 2 nd floor PRE-PHASE Duct chase West side- 2 nd floor

HAFB 1305 HVAC Repair Solicitation # MXRD Drawing title: J&J #04 Description: Prephase- 1 st Floor: new chiller water lines (vertical and horizontal) and duct chase east and west side Date: Start date: TBD upon approval Completion date: 1 st floor duct chase ***Refer to appendix 1 for list of office areas affected by this work*** Construction access for phases 2, 4, and 5 Dumpster location Lobby work after hours Dust partition with temp. door Elevator use before 7 am and after 5 :30 pm Not a construction entrance Corridor to be included in the first phase. ACT to be left out 1 st floor duct chase ***Refer to appendix 1 for list office areas affected by this work*** New chiller lines in the existing chase. Need access to all 3 floors prior to phasing work PRE-PHASING: 1 st FLOOR: Chiller lines (horizontal and vertical) and duct chase Chilled water line chase PRE-PHASE Duct chase East side- 1 st floor PRE-PHASE Duct chase West side- 1 st floor

PRE-PHASING: ELECTRICAL WORK FOR ALL AHU UNITS HAFB 1305 HVAC Repair Solicitation # MXRD Drawing title: J&J #05 Description: Prephase- Power to all AHU units Date: Start date: TBD upon approval Completion date: Electrical pre-phasing 1 st floor Electrical pre-phasing 3 rd floor Electrical pre-phasing 2 nd floor 2 electrical conduits require pre-phasing For the RTU to run to 2 nd floor corridor above. Piping to enclose later in the new duct chases 2 conduits from the 2 nd floor to feed RTU units New electric room 2 electrical conduits from below to be enclosed in the duct shaft (coring required) Electrical conduit run as shown will be above 2 nd floor ceiling Electrical conduit above ceiling 2 conduits entering the new 3 rd floor electric room from 2 nd floor (coring required)

HAFB 1305 HVAC Repair Solicitation # MXRD Drawing title: J&J #06 Description: Regular phasing plan Date: Start date: TBD upon approval Completion date: PHASING PLAN Phase 1 3 rd floor East Phase 2 3 rd floor West Phase 3 2 nd floor East Phase 4 2 nd floor West Phase 5 1 st floor East Phase 6 1 st floor West Temporary walls