ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019

Similar presentations


Presentation on theme: "ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019"— Presentation transcript:

1 ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
WEST LOBBY SCHEDULE 1/8 – 1/11: P1 & P4 1/14 – 1/18: P3 & P5 1/22 – 1/25: P2 EAST LOBBY SCHEDULE 1/22 – 1/25: P9 1/28 – 2/1: P7 & P10 2/4 – 2/8: P6 & P8 GARAGE SCHEDULE 2/11 – 2/15: P18 2/18 – 2/22: P19 2/25 – 2/28: P20 As we continue our transformation of Landmark Center into 401 Park we have come to a critical juncture. In order to complete the restoration of the 1st floor lobby we will need to re-route all access from the main entrance through a new entry corridor from Park Drive into the P2 level of the garage. The new entrance as shown on the attached will bring all tenant and public foot traffic through the former staples entrance to a new corridor. We are taking great care to ensure a comfortable and efficient experience through this new path. The entry will have free access Monday through Friday 6am – 6pm functioning as the public entrance to the property and will require card access after-hours as our entry currently functions. We will station security personnel at the entry to assist visitors and provide information during this temporary condition. We anticipate this change to take place the second week of December. We will update you all with exact dates as we get closer. This change will last through the winter. Please reach out to us regarding any questions or alternate access needs in the interim. As always thank you for your patience during this process. No more than two cabs will be closed at a time remaining cabs will be available for use at all times

2 *SIGN UP FOR THE LANDMARK NEWSLETTER*
Urgent building updates sent out immediately Landmark Ledger construction progress/ photos sent every 2 weeks Upcoming events and opportunities in the area To be added to the newsletter, Nicole Moschella at

3 LANDMARK CONSTRUCTION PROGRESS
New Chiller Water Piping Time Out Market Shadow Boxes Sidewalk Prep Rail Post Installation

4 MAIN ENTRY CHANGE: SAT. DECEMBER 8TH
All access through the main entrance will be re-routed through a new entry corridor from Park Drive into the P2 level of the garage at the stairs/ elevators Free access Monday-Friday 6am-6pm Card access required after-hours Access for tower tenants will be available via the freights. Contact the management team if you require access. Security personal stationed at entry for assistance As we continue our transformation of Landmark Center into 401 Park we have come to a critical juncture. In order to complete the restoration of the 1st floor lobby we will need to re-route all access from the main entrance through a new entry corridor from Park Drive into the P2 level of the garage. The new entrance as shown on the attached will bring all tenant and public foot traffic through the former staples entrance to a new corridor. We are taking great care to ensure a comfortable and efficient experience through this new path. The entry will have free access Monday through Friday 6am – 6pm functioning as the public entrance to the property and will require card access after-hours as our entry currently functions. We will station security personnel at the entry to assist visitors and provide information during this temporary condition. We anticipate this change to take place the second week of December. We will update you all with exact dates as we get closer. This change will last through the winter. Please reach out to us regarding any questions or alternate access needs in the interim. As always thank you for your patience during this process.

5 LANDMARK CONSTRUCTION PROGRESS
Elevator Shaft Stairwell 2nd Floor Windows Bus Shelter

6 *SIGN UP FOR THE LANDMARK NEWSLETTER*
Urgent building updates sent out immediately Landmark Ledger construction progress/ photos sent every 2 weeks Upcoming events and opportunities in the area To be added to the newsletter, Nicole Moschella at

7 TEMPORARY BIKE CAGE RELOCATION: MON. DECEMBER 17TH
The temporary cage will be open for use as of Monday morning. Please remove all items from the existing bike cage no later than Monday, December 17th at 5pm. At that point, the existing bike cage will no longer be available to access and we will not be responsible for items left behind. Access will not change; your current card will open the new location. We would like to remind everyone that this cage is meant for day storage only; any overnight or long-term storage is prohibited As we continue our transformation of Landmark Center into 401 Park we have come to a critical juncture. In order to complete the restoration of the 1st floor lobby we will need to re-route all access from the main entrance through a new entry corridor from Park Drive into the P2 level of the garage. The new entrance as shown on the attached will bring all tenant and public foot traffic through the former staples entrance to a new corridor. We are taking great care to ensure a comfortable and efficient experience through this new path. The entry will have free access Monday through Friday 6am – 6pm functioning as the public entrance to the property and will require card access after-hours as our entry currently functions. We will station security personnel at the entry to assist visitors and provide information during this temporary condition. We anticipate this change to take place the second week of December. We will update you all with exact dates as we get closer. This change will last through the winter. Please reach out to us regarding any questions or alternate access needs in the interim. As always thank you for your patience during this process.

8 For questions regarding these events and other building matters, contact Nicole Moschella at or For questions after hours, contact security at