1 Liverpool Production Status Week of 9 February 2007.

Slides:



Advertisements
Similar presentations
LAD :,, * 50 pa 50% 50% 24
Advertisements

HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Packet Scheduling for Fairness and Performance Improvement in OFDMA Wireless Networks Nararat RUANGCHAIJATUPON and Yusheng JI The Graduate University for.
Commission 7 Annual Meeting1 Annual Meeting Commission 7 Kraków September 2003 PROGRESS REPORT CHAIR.
1 Questionnaire design Module 3 Session 3. 2 Overview (of Session) This session starts by introducing some aspects that need to be considered when designing.
Wed 20 Sept 06Spin Tracking Meeting1 Positron Capture Simulations: Runge-Kutta vs Boris Leo Jenner, Daresbury Labs.
Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.
Production Summary Tony Smith (Production Coordinator)
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
VELO Status at Liverpool T. Bowcock. Prototype Module(1) Mechanical Design Several different options Reduce complexity Dead reckoning.
1 Liverpool Production Status Week of 23 February 2007.
VELO Module Mid-Term Review T. Bowcock 11 October, 2006.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
1 Liverpool Production Status Week of 02 March 2007.
JISC Information Environment Service Registry (IESR) Amanda Hill, Pete Johnston, Ann Apps.
Silicon Detector and Micromodule Production: Present Status.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Electrical and thermal testing at Glasgow and Liverpool.
Ns-3 review meeting1 ns-3 review Tom Henderson January 11, 2007.
High tariff topics at Foundation High success rates: Number Long multiplication (50+%) Find value of a calculation given another (50-60%) Exchange rate/money.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
P.P. & APD gain ratio report— 4 month testing Ken Chiang, J.Y. Lin, Jeri Chang 2009/3/19.
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
ATLAS Module building at Glasgow
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Status of NA62 straw electronics Webs Covers Services Readout.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group.
L0 Module Testing and Analog Cable What we built so far: –No.3 First prototype with SVX4 (L1 hybrid) –No.4 with irradiated sensor –No.5 Installed on the.
Testbeam Post Mortem Immediate reflections on successes and failures Richard Plackett – University of Glasgow VELO Upgrade.
MALAYSIA Feb 21 –22 February 21.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
26-Feb-16 Test Level F – Fri 12 th Dec Chapter 13 - Decimals Revise Chapter 7 – Scientific Notation Chapter 37 – Drawing Skills Chapter 47 – Time / Distance.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Glasgow Report W. H. Bell, A. Cheplakov, F. Doherty, M. Horn, J. Melone, V. O’Shea UK-V Meeting 03/03/04 -Glasgow.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
QCG Report Francesco Forti University and INFN, Pisa.
T. Bowcock University of Liverpool
Preparations for test of
LHCb comprehensive review, Paula Collins
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
Hybrid Status/Deliveries
AIDA Asic Heatsinks Prototype received, and approved.
Financial reporting and status : University of Ljubljana
Presentation transcript:

1 Liverpool Production Status Week of 9 February 2007

9 Feb. 2006VELO Weekly Meeting2 Production Status Completion of Installed Modules Mid-term Review X-mas

9 Feb. 2006VELO Weekly Meeting3 Production Status (2) PA/Chip Gluing Beetle Bonding Sensors Full Modules Completed For Installed Modules

9 Feb. 2006VELO Weekly Meeting4 This Week 3 modules delivered this week 1 week behind schedule in steps 2 weeks behind schedule in module delivery Estimated delivery date of 42 nd module is now March 2 nd Step 16 (BE bonding) complete for installed modules with expected yields Constraint system installed

9 Feb. 2006VELO Weekly Meeting5 Thermal Studies Trying to reproduce potential cooling issue, we ran two special tests with non-production parts Over-temperature Ran hybrid up to 60 C, 65 C & 70 C Over-torquing Torqued cooling screws to 50 cNm using cookie shaped blanks In both cases, no change was seen in cooling performance Not sure what this proves

9 Feb. 2006VELO Weekly Meeting6 Next Week Potentially slow week (1-2 modules delivered) Multiple people out sick Multiple people on vacation (half-terms) A bonder needs service Will be able to make up any shortfall week after next