Relative Roles of Breeders vs ALWRs In Indias Nuclear System, and U.S.s and Indias Perceptions of the 123 Agreement Chaim Braun Consulting Professor Center.

Slides:



Advertisements
Similar presentations
Unconventional Gas and EU Energy Policy
Advertisements

US-India Civil Nuclear Relations ITRN 603 International Trade Relations Kristin Isabelli Slide 1.
EURATOM Euratom: A Regional model in Support of Global Non-proliferation ? GGP Workshop 'Assessing the Prospect of the Euratom Treaty Approach in the Middle.
Implications of the NPT on a Coordinated Approach to Triple S Dr M. S. Draper C.B.E. Past head – Non-Proliferation Policy UK Department of Energy and Climate.
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
Can Nuclear Power Meet the Challenge
Evolution and Resilience of the Nuclear Nonproliferation System Arian L. Pregenzer November 3, 2013.
1 NRC Export/Import Licensing Requirements and Procedures Jill Shepherd, Licensing Officer Export Controls and International Organizations Office of International.
Oh, I almost forgot, it packs a 150 to 170 kiloton nuclear punch It’s about the size of an office trash can Let’s start with a modern nuclear.
Excellences, allow me first to remind you of some relevant information on the present status of peaceful use of nuclear energy within global energy strategy.
India’s nuclear technology export future 1 Panel on Emerging Nuclear Powers September Presenter: S L Rao.
Graham Allison Presentation to The 35 th IFPA-Fletcher Conference on National Security Strategy and Policy October 28, 2004 Anticipating and Assessing.
Nuclear Renaissance and Nonproliferation in North-East Asia Hua HAN Associate Professor School of International Affairs Beijing University.
The Regulation of International Trade in Enriched Uranium in a New Build Era Maxine Symington.
1 Fiscal Federalism in Iraq: OIL and GAS. The oil situation: a snapshot.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Oslo, 4 March 2005Managing Nuclear Material Stockpiles in the 21 st Century 1 Nuclear Material Security and Multilateral Agreements Stephan Klement Office.
Sustainable Energy Security from Fast Breeder Reactors
Nuclear Energy and Australia Presentation by Prof Jim Falk, Australian Centre for Science, Innovation and Society.
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
Role of nuclear power in India’s power-mix Anil Kakodkar Department of Atomic Energy.
Energy Scenario 12 Nov Energy transformation.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Japan’s Nuclear Energy Program
The Nonproliferation Treaty. Atoms for Peace December 8, 1953 President Eisenhower spoke to the UN suggesting that peaceful uses of the atom be promoted.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
A Presentation by Henry Sokolski Executive Director Nonproliferation Policy Education Center Alexander Hamilton Society George Mason University.
Stephen Dembek, Section Chief Export Controls and International Organizations Section Office of International Programs Contact Info: ,
CANDU Fuel Options: Practical Adaptability Jerry Hopwood Vice President, Marketing & Product Development World Nuclear Association, Annual Symposium September.
SECURITY IN NATIONAL NUCLEAR DEVELOPMENT S.M. Anwaruddin Beloit College, Beloit, WI Abstract One of the most complicated issues in the current international.
Steven Biegalski, Ph.D., P.E. Director, Nuclear Engineering Teaching Laboratory Associate Professor, Mechanical Engineering Dusting off the Atom: Nuclear.
Thorium for Use in Plutonium Disposition, Proliferation Resistant Fuels, and Future Reactors Brian Johnson WISE 2006
Arms Control & Disarmament. AC & D two different concepts: AC refers to curbs on acquiring new Weapons – or reduction in some existing weapon types Disarmament.
Security threats in the Middle East and Northern Africa: the problem of weapons of mass destruction proliferation Dr. Vladimir A. Orlov President, PIR.
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013.
The Nuclear Security Summit and its Two Side Events Anna Péczeli CBRN Security Seminar in Budapest June 17-18, 2014.
Fundamentals of Nuclear Power. Nuclear Power Plants Nuclear power is generated using Uranium, which is a metal mined in various parts of the world. Some.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Potential Regional Nuclear Spent Fuel Management and Regional Uranium Enrichment /Reprocessing Paths for Asia Jungmin KANG CISAC, Stanford University 2007.
D J Coates, G T Parks Department of Engineering, University of Cambridge, UK Actinide Evolution and Equilibrium in Fast Thorium Reactors UNTF 2010 University.
Critical and Source Driven Subcritical Systems for: - Waste Transmutation - Fuel Breeding Phillip Finck Associate Laboratory Director for Nuclear Science.
Civil Use of Nuclear Energy with Nuclear Fuel Cycle The Challenge for the Sustainable use of Nuclear Energy in Japan Taro HOKUGO March 23, 2006 This presentation.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Nuclear Terrorism: The Ultimate Preventable Catastrophe.
Technical summary of DPRK nuclear program Siegfried S. Hecker Stanford University Center for International Security and Cooperation 2005 Carnegie International.
Nuclear Power : An inevitable option for sustainable development IAEA Scientific Forum 2007 on Global Challenges and Development of Atomic Energy, Vienna.
JORDAN ATOMIC ENERGY COMMISSION (JAEC) Building of National Safeguards Capabilities in Jordan IAEA’s Technical Meeting/Workshop on National Infrastructure.
2016 January1 Nuclear Options for the Future B. Rouben McMaster University EP4P03_6P03 Nuclear Power Plant Operation 2016 January-April.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
Nuclear Safety & Security in the DPRK Sharon Squassoni Senior Fellow & Director Proliferation Prevention Program Asan Institute “The 2012 US-North Korea.
The Egyptian Nuclear & Radiological Regulatory Authority (ENRRA)
1 Sixth ROK-UN Conference on Disarmament and Non-Proliferation Issues 3-5 December 2007 CONTROLLING SENSITIVE NUCLEAR FUEL CYCLE ACTIVITIES Mr Jeff Robinson,
Introduction to Nuclear Energy Candace Davison Senior Reactor Operator Penn State University.
Nuclear Power Group Members:
Nuclear Proliferation and Arms Control (Part 2)
DDG Nuclear Energy: Mr Zizamele Mbambo
PRIVATISATION OF NUCLEAR POWER TATA CONSULTING ENGINEERS, Mumbai
Russia and Iran’s Nuclear Program M.A. in Nonproliferation Studies
What is required for nuclear disarmament?
IAEA International Conference on Fifty Years of Nuclear Power – The next Fifty Years Moscow - Obninsk, Russian Federation - June 28, 2004 Nuclear.
A Fissile Materials Cut-off Treaty: french views
What does it take for the DPRK to be a nuclear threat?
Japan’s Nuclear Energy Program
Nuclear Power in Jordan
Submarines & Safeguards
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Access, Environmental and Economic aspects of Nuclear Energy
Presentation transcript:

Relative Roles of Breeders vs ALWRs In Indias Nuclear System, and U.S.s and Indias Perceptions of the 123 Agreement Chaim Braun Consulting Professor Center for International Security and Cooperation (CISAC) Stanford University Presented at the University of Reading Conference on the India – United States Nuclear Cooperation Agreement Reading, U.K., September 14, 2009

U.S.-India Nuclear Deal India agrees to: Separate civilian from military facilities Civilian sites subject to IAEA safeguards Support Fissile Material Cutoff Treaty negotiations and continue unilateral moratorium on testing U.S. agrees to: Cooperate on civilian nuclear technology development Assure reliable supply of nuclear fuel – Congressional approval obtained – Nuclear Supplier Group consensus obtained

Indias Perceptions of its Nonproliferation Status Prior to Signing of 123 Agreement India views itself as an effective Nuclear Weapons State (NWS), having in place most of the requisite attributes: - It tested both fission and fusion weapons - It developed strong indigenous materials protection control and accounting system (MPC&A) - It has a significant system of operating nuclear power plants of Indigenous design - It demonstrated and operates an entire closed nuclear fuel cycle for both military, civilian uses - It didnt export proliferating or dual-use nuclear technologies to suspect end-users

Indias Perceptions of its Nonproliferation Status Prior to Signing of 123 Agreement (Cont.) India refrains from further nuclear weapons testing despite demands from some weapons designers India, however, didnt sign the Nonproliferation Treaty (NPT) claiming the Treaty inherently unequal India refused to abide by NPT disarmament provisions (Article VI), while claiming rights of NWS under Article I, III, and IV India refuse to sign the Comprehensive Test Ban Treaty (CTBT). Unclear position on Fissile Materials Cut-off Treaty (FMCT)

Indias Plans for Nuclear Electricity Generating System India developed its Three Phases nuclear energy growth scenario: - First phase – PHWRs – (HINDU CANDU), of limited total capacity due to insufficient Uranium supplies & mining capacity. PHWRs produce Plutonium supplies to fuel Second Phase reactors - Second Phase FBRs – 1,000 Mwe breeders, high gain breeding, metallic Plutonium fuel. Large capacity growth – 250,000 MWe by Large 4,000 – 6,000 MWe FBR stations, each with dedicated fuel reprocessing & re-fabrication plant.

Indias Plans for Nuclear Electricity Generating System (Cont.) Third Phase – Transition of FBRs system to operate on Pu-Th fuel cycle. Main fissile material is U-233, bred in FBR Thorium blankets. Introduction of Advanced converter (AHWR) to burn excess fissile material. Long-term equilibrium operation of FBRs- AHWRs system based on Thorium fuel cycle Central Role of FBRs technology, first large demonstration plant – 500 MWe PFBR, now under construction in Kalpakkam. Operation by 2012 Advanced Light Water Reactors (ALWRs) viewed as limited stop-gap measures, useful until FBRs capacity takes off

India Near-Term Nuclear Capacity Projections Reactor Types and CapacitiesCapacity (MWe)Cumulative Capacity (MWe) 17 Reactors at Six Sites in Operation; Tarapur, Rawatbhata, Kalpakkam, Narora, Kakrapar, Kaiga 4,120 3 PHWRs under Constructon at: Kaiga 4 (220 MWe), RAPP 5 & 6 (2 x 220 MWe) 6604,780 2 LWRs under Construction at Kudankulam (2 x 1,000 MWe)2,0006,780 PFBR under Construction at Kalpakkam (500 MWe)5007,280 Total Installed Capacity by ~ 20127,280 Future PHWRs by (8 x 7oo MWe)5,60012, 880 Future FBRs 2012 – 2020 (4 x 500 MWe)2,00014, 880 Future AHWR (1 x 300 MWe)30015,180 Total Year 2012 Capacity Plus India Technology Nuclear Plants by , 180 Future Imported LWRs (6 x 1,000 MWe)6,00021,180 Total Installed Capacity by ,180

Projected Installed Nuclear Power Capacity build-up – Reactor Type Breakdown

336 0 MW in operation 3920 MW under construction 8800 MW new sites identified Nuclear Power Plants in India - Sites 2820 MWe 4460 MWe

Role of ALWRs in Indias Nuclear Program Imported ALWRs will have to import their lifetime Uranium fuel requirements, due to lack of indigenous fuel supplies ALWRs viewed by DAE as near-term capacity-fillers until domestic FBRs program matures DAE concerned that imported ALWRs will: - Create competition by foreign vendors, construction companies -Create regional nuclear generating corporations independent of NPCIL - Siphon-off Engineering talents from DAE reactors, R&D programs - BREAK DAEs NUCLEAR MONOPOLY Ambivalent attitude to nuclear technology imports constraining domestic nuclear development program

U.S.s Proliferation-related Perceptions Prior to Signing of 123 Agreement U.S. global nonproliferation concerns different than Indias domestic, regional positions U.S. cannot accept Indias claim for recognition as NWS status: - Impossible by NPT definitions - Similar demands could be raised by Pakistan, Israel – other NPT non-signatories - North Korea, ultimately Iran, could demand equal status based on developing capabilities - New Pandoras Box of latent nuclear weapons states could emerge, eventually claiming future similar status to India

U.S.s Proliferation-related Perceptions Prior to Signing of 123 Agreement (Cont.) - Concessions to India on terms of 123 Agreement will complicate similar Agreements then entering review with Korea, UAE, other Middle East countries - Indias Nonproliferation record not so pristine : - India clandestinely imported centrifuge enrichment technology (not unlike Pakistan) - India tested nuclear weapons twice: In 1974 (prompting the creation of the NSG) In 1998 (Prompting testing by Pakistan) - India maintained nuclear, missile proliferation-related contacts with Iran - India refused to sign NPT, CTBT, FMCT(?), etc

U.S. Perceptions of India Nuclear Energy System India had only limited success with domestic PHWRs program – 4,000 MWe, 6 Nuclear plant sites, all developed in forty years PHWRs program afflicted by lack of Uranium fuel, reduced generation, declining capacity factors Importing ALWRs will significantly increase Indias nuclear capacity. Just three GE-Hitachi ABWRs (1,340 MWe each) equal to total PHWRs capacity India installed in forty years ALWRs are proven, commercially ready, large-scale, fast-growth, nuclear electricity option for India

U.S. Perceptions of India Nuclear Energy System (Cont.) It could be to Indias benefit to give up its experimental, proliferative PFBR, fuel cycle, in exchange for ready ALWRs, fresh Uranium supplies to existing PHWRs Giving up PFBR: - Small price to pay for large-scale benefits - Will burnish Indias nonproliferation credentials - Will hinder other countries demands for closed fuel cycle, sensitive fuel cycle facilities - Will slow the spread of dreaded Plutonium economy

Indias Proliferation-related Perceptions After Signing of the 123 Agreement India considers it got a clean i.e. unconditional exemption from Nuclear Suppliers Group (NSG) Conditions of supply: - It can import Uranium for its operating PHWRs - It requires foreign ALWR vendors to provide Uranium supplies for lifetime of reactors imported - It demand rights to import enrichment and reprocessing (ENR) technologies, given its equivalent NWS status, NSG exemption: - Enrichment plants to convert fresh Uranium supplies to Low Enriched Uranium (LEU) fuel for future ALWRS

Indias Proliferation-related Perceptions After Signing of 123 Agreement (Cont.) - Reprocessing plants to reprocess spent ALWRs, PHWRs spent fuel, extract Plutonium for its evolving FBRs program - It demands blanket approval rights to reprocess U.S. origin fuel, or spent fuel from U.S. ALWRs, as part of implementing negotiations following signing of 123 Agreement - It demand rights to export, under safeguards, its PHWRs technology to developing countries, despite proliferative characteristics of PHWR design General approach of Lets hit the iron while its hot

Indias Perceptions of Nuclear Reactor Imports Indias Singh Government paid high political price to pass the Agreement for Peaceful Nuclear Cooperation (123 Agreement) in Indian Parliament India supported U.S. positions regarding Irans nuclear program in IAEA, UN Security Council India cancelled its participation in Iran Pakistan India (IPI) natural gas pipeline project General feeling of sacrificing legitimate regional energy, security concerns, for global goals of U.S. Indias Government possibly needed to dress-up benefits obtained from 123 Agreement to justify political costs incurred

Indias Perceptions of Nuclear Reactor Imports (Cont.) Main benefits now claimed by Indias Government: - Fresh Uranium supplies to operating PHWRs - Inflated numbers of ALWRs expected to be installed by 2020 – 60 GWe, rather than 8 GWe in pre- Agreement estimate (2005) - Inflated numbers of all nuclear plants to be installed: 63 Gwe by 2030, increasing to even 470 GWe by 2050 If the Country Thinks Big and Executes its Plans Correctly per Prime Minister Singh, on September Exporting Indian PHWRs to less developed countries to demonstrate Indias technological prowess

Indias Perceptions of Nuclear Reactor Imports (Cont. II) Important role of domestic FBRs seem forgotten in irrational exuberance over importing ALWRs Introduction of foreign vendors, deals with Indian suppliers, could reduce Department of Atomic Energy (DAE)s monopoly over Indian nuclear program

U.S.s Proliferation-related Perceptions After Signing of 123 Agreement U.S. cannot accept Indias claim as effective NWS U.S. insisted on India signing comprehensive safeguards Agreement (CSA) with IAEA, filing Facility Attachment document for each reactor, fuel cycle facility, to be safeguarded, & bringing signed India-specific CSA into force U.S. still needs India nonproliferation assurances to approve nuclear technology export (Part 810) licenses U.S. not enthusiastic about blanket reprocessing approval. Issue now under discussion. Could complicate pending 123 Agreement negotiation with Korea

U.S.s proliferation-related Perceptions After Signing of 123 Agreement (Cont.) U.S. opposed to Indias requests to import ENR technologies: - On long-term policy basis (1978 NNPA) - Since India did not sign NPT - Inconsistent with NSG Conditions of Supply (Indias exemption not completely clean) - Contrary to requirements of 2006 Hyde Act - Contrary to G8 Statement of May 2009 U.S. concerned about renewed nuclear testing in India following claims of 1998 thermonuclear test fizzle. Singh Government tries to finesse situation, claiming test results were sufficient, no more required now

U.S. Perceptions on Reactor Exports to India Following Passage of 123 Agreement Very limited progress to date, but cautiously optimistic Only available, licensed sites handed to Russian, French reactor vendor Corporations U.S. nuclear vendors sites identified only in August These include Mithi Virdi in Gujarat State, Kovada in Andhra Pradesh State. Licensing status of both sites yet unclear Limited progress on third-party liability laws in India, India signing to 1998 Vienna Convention, updating coverage limits. India Government promised action by 2009 year-end Need to resolve negotiations on blanket reprocessing approvals, India ENR technologies import rights. Supporting Indias claim conflicts with G8 Statement

U.S. Perceptions on Reactor Exports to India Following Passage of 123 Agreement (Cont.) Need to de-conflict with UAEs, other Middle East countries, Draft & pending 123 Agreements, where a Return Clause has been inserted. Will U.S. insist on similar right in Indias 123 Agreement? Under what circumstances? How to implement? Part 810 export licenses to U.S. vendors not yet issued pending clarifications on open nonproliferation issues U.S. supported Indias applications, spent political capital, in securing NSG exemption, passage of 123 Agreement in Congress, yet major economic benefits promised are presently claimed by Russians, French

The Path Forward – Resolving Past Differing Interpretations – Personal Observations India could now be defined as Virtual NWS within nonproliferation regime Such definition allows each side to interpret it any way it wishes. Face is saved all around Real test is in finding acceptable solutions to specific issues, while each side maintains its basic positions On ENR technologies – India already posses rudimentary enrichment, reprocessing technologies. If India further develop these technologies using its own resources, constructs, operates its plants under IAEA safeguards – this represents best near-term option

The Path Forward – Resolving Differing Interpretations – Personal Observations (Cont.) In time, as confidence builds in implementation of 123 Agreement, & in Indias nuclear program, sensitive technology imports could be considered, as parts of large ALWRs orders India might be able to construct ~ 8-12 GWe of ALWRs by 2020, > 30 GWe by 2030 ALWRs program will buy India time in developing FBR reactor technology, FBR fuel cycle facilities commercialization, using mostly its own resources, unless FBR technology is brought under safeguards Future cooperative progress will be made, but at slower pace than currently estimated

BACKUP SLIDES Indias Breeder Program

Relative Roles of Breeders vs ALWRs In Indias Nuclear System, and U.S.s and Indias Perceptions of 123 Agreement - Introduction India and U.S. had different perceptions of Indias nonproliferation situation & expansion mode of nuclear electricity generation system These differences complicated, slowed down, negotiations for the Agreement on Peaceful Nuclear Cooperation (123 Agreement) There have occurred reversals in some of the positions of the two sides after the passage of the Agreement, as compared with the initial positions Several issues still need to be resolved before the full value of the 123 Agreement is realized

THREE STAGE NUCLEAR POWER PROGRAM Stage – I PHWRs 16- Operating 16- Operating 4- Under construction 4- Under construction Several others planned Several others planned Scaling to 700 MWe Scaling to 700 MWe Gestation period being reduced Gestation period being reduced POWER POTENTIAL 10,000 MWe POWER POTENTIAL 10,000 MWeLWRs 2 BWRs Operating 2 BWRs Operating 2 VVERs under 2 VVERs under construction construction Stage - II Fast Breeder Reactors Fast Breeder Reactors 40 MWth FBTR - Operating 40 MWth FBTR - Operating Technology Objectives realised 500 MWe PFBR- 500 MWe PFBR- construction commenced construction commenced POWER POTENTIAL 540,000 MWe POWER POTENTIAL 540,000 MWe Stage - III Thorium Based Reactors Thorium Based Reactors 30 kWth KAMINI- Operating 30 kWth KAMINI- Operating 300 MWe AHWR-Under Regulatory Examination 300 MWe AHWR-Under Regulatory Examination POWER POTENTIAL Very Large. Availability of ADS can enable early introduction of Thorium on a large scale POWER POTENTIAL Very Large. Availability of ADS can enable early introduction of Thorium on a large scale

ParametersThermal Neutron Reactors (PHWR) Fast Neutron Spectrum Reactors (PFBR) FuelNatural UO 2 (Pu-U) O 2 Clad materialZircaloy-220% CW 15Cr-15Ni-Mo-Ti CoolantHeavy WaterLiquid Sodium Core outlet temp, o C Core power density, W/cm Neutron energy0.025 ev> 100 kev Burnup6,700 MWd/t100,000 MWd/t Neutron Flux, n/cm 2 /s x10 15 Life of core ~180 Days2 Years COMPARISON OF PHWR AND PFBR CORES

FBR PROGRAMME IN INDIA Ø India started FBR program with construction of FBTR Ø FBTR is a 40 MWt (13.5 MWe) loop type reactor. Design is same as that of Rapsodie-Fortissimo except for incorporation of SG and TG (agreement signed with CEA, France in 1969). Ø FBTR is in operation since Ø 500 MWe Fast Breeder Reactor Project (PFBR) through Indigenous design and construction Ø Government. granted financial sanction for construction in Sep Ø Construction of PFBR has been undertaken by BHAVINI. Ø PFBR will be commissioned by Ø Beyond PFBR: 4 units of 500 MWe FBR (twin unit concept) similar to PFBR with improved economy, enhanced safety, by Ø Subsequent reactors would be 1000 MWe units with metallic fuel

Reactor Vault

Safety Vessel with Thermal Insulation Panels

35 Fabrication Technology for MOX Fuel Established Experimental irradiation of PFBR MOX fuel (with U-233) in FBTR: fuel has reached 60 GWd/t burn-up Fuel specifications optimized for product recovery as well as performance R&D on metallic fuel for achieving shorter doubling time PFBR type MOX pins for experimental irradiation Annular MOX pellet Fuel Fabrication for PFBR

Constraints on Implementing Indias Fast Breeder Reactors Program Successful Completion & Startup of PFBR Closing Nuclear Fuel Cycle in PFBR & Follow-up FBRs - On-site Reprocessing & Re-Fabrication Fuel Cycle Transition from Oxide to Metal Plutonium Fuels, Thorium-U-233 Fuels Funding Future FBRs, Fuel Cycle Facilities Construction Constructing ~250 GWe in Forty Five Years - Past Record ~ 7 GWe in Forty Years Managing Interfaces between FBRs constructors, Operators, Fuel Cycle Providers & Regulators at each site Opening up New FBR Sites –One to Two Sites/Year for Forty Years - Past Record - Seven New Power Plant Sites in Forty Years Training Manpower for all FBRs, Fuel Cycle Facilities, Construction corporations, regulators Industrial Fabrication Capacity dedicated to DAE Missions