FEI4A Wafer Probing Andrew Stewart 21 September 2012.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

Status of Indium Bumped FE-I4B Richard Bates, Craig Buttar, Kate Doonan, John Lipp, Thomas McMullen 28/03/2014.
Practical Use of Straight line Theory Prepared by Bernie Lafferty Bsc(Hons) GIMA Mathematical Sciences.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Human Subjects Training Requirements All researchers, advisors, and research assistants must complete training. You must have an overall passing rate of.
1 Burn-in Viewer User’s Guide Version 2.0 February 17, 2005 LukasTomasek
1 Introduction to Time Dependent Dielectric Breakdown in Digital Circuits Traps generated under the influence of electric field Gate dielectric no longer.
UK – quad module. Experience with FE-I4 UK groups relatively new to ATLAS pixel Have 5 USBPix systems up and running now – Glasgow, Edinburgh, Manchester,
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
Irradiation at IUCF We irradiated 5 chips from Sintef wafer 9 (7,39,42,44,46) at Indiana University Cyclotron Facility on 30th November. Pixel 7,44 and.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
End Cap Board Testing Status at Penn July 14, 2004 Anton & Campion Mitch.
Measurement at -5 and -10 C Leakage current and depletion voltage of the irradiated chips were measured at -5 C and -10 C.
 Extraction and Critical Data Appraisal Alexa R. Wilson.
Procedure for Pro4 using Keithley
PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | | Markus Keil.
 What is Four Point Probing  How the system works  Pro 4 Set Up  Simple Calculations behind Four Point Probing  Procedure for using Pro4.
Mass production testing of the front-end ASICs for the ALICE SDD system L. Toscano a, R. Arteche Diaz b,d, S. Di Liberto b, M.I. Martínez a,c, S.Martoiu.
Pioneers in Non-contact Measurement. MTI Instruments, Inc.  Founded in now a public company listed on NASDAQ  Designs, manufactures and markets.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Vicky Piert SIMS Team v0.9 Helping to support School Census Autumn Helping to support School Summer Census Secondary.
Verigy V93000 Service Training
Procedure for Pro4 using Keithley
1 of 19 09/09/2013 FE-I4B IBL wafer probing results FE-I4 testing meeting 09 September 2013 Marlon Barbero, David-Leon Pohl Introduction Cut definitions.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
CONTROL SOFTWARE On December 11th 2006 By Juha Petäjäjärvi On December 11th 2006 By Juha Petäjäjärvi.
VTT ASSEMBLY 5 CHARACTERISATION KATE DOONAN & RICHARD BATES 2012.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Wisconsin Incident Tracking System Technical Assistance: Resetting your computer so WITS fits your screen.
Meaningful Use Office Hours Focus: MU Reports – Patient Volume, MU Performance Measures, Clinical Quality Measures Moderators: Cecelia Rosales, Carmen.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
Fast Fault Finder A Machine Protection Component.
Michał Dwużnik, for the SCT collaboration
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Noise study 6/May/’13 Kazuki Motohashi - Tokyo Tech.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
Status report of test procedures for the readout pixel chips in Catania F.Riggi ITS Meeting, June 2002.
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Wafer probing in Legnaro/Padova E. Fioretto Laboratori Nazionali di Legnaro for the LNL-Padova SPD Test Group 04/02/2003 E. Fioretto INFN - LNL SPD Meeting.
C.V. S.W. T.S. L.G. X.S. M.S. IPHC-LBL meeting, January 22, Probe Test Results for 5 wafers of Ultimate-2 sensors Outline:  Yield and wafer.
ZEBRA Tom Cobb. What is a zebra? Zebras (/ˈzɛbrə/ ZEB-rə or /ˈziːbrə/ ZEE-brə)[1] are several species of African equids (horse family) united by their.
Section 508 Refresh WCAG 2.0 A and AA Information & Comparison CB Averitt – Deque Systems.
Stave 4028 Thermal tests Electrical tests. 4028: THERMAL TESTS We have studied the effect of the liquid speed on the modules heating. Test 1: all 13 modules.
FE-I4 irradiated chip tests at low temperature M. Menouni, P. Breugnon, A. Rozanov (CPPM - Aix-Marseille Université)
M.S. February 25, Ultimate-2 sensors preliminary summary of LBL probe test results Introduction Wafer maps:  1 STD epi, full thickness  5.
Opto temperature experience in the Pixel detector C. Gemme IBL meeting, 17 March 2009.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
Introduction  Goal: Study noise occupancy of the FE-I4B chips on the quad-module mounted on the stavelet with serial power  About one month ago, observed.
UVIS TEAM MEETING 7/ Instrument Status On/Off Cycle: 26 Hours On: ~43000 hours –~4500 hours since last shut down (probe relay) HDAC Filament Modulation:
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
Further studies of the FEI3 TDAC Tuning
Jimin Kim and Austin Piehl University of Washington
MODULE QUALIFICATION STATUS AT LIVERPOOL
DCD – Measurements and Plans
PyBAR Firmware Structure and Operation Experience
Constructional requirements from ITk-Strips
VFAT hybrid and beam board noise studies
Database requirements from ITk-Strips for DAQ loads
USBPix Readout System using FE-I4/A chip Status Update: Finalization of Threshold Tuning and Minor updates Jimin Kim and Austin Piehl Department of Physics.
Tracker Station QA Acceptance Test Rig Status
الوحدة 20 مهارات التواصل مع الآخرين
Process & Product checks
Shifter Instructions regarding the ZD, Dan Peterson
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
GLAST Large Area Telescope:
Is Increased Bias Current and CMN Correlated?
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
Presentation transcript:

FEI4A Wafer Probing Andrew Stewart 21 September 2012

Set-up of semi-automatic wafer probing of FE-I4A wafers near completion. – Cascade S300 probe station added to STControl software. – Reasonable success of achieving a good electrical contact. In a test of probing 6 consecutive die only 1 failed to return test data. – Measurement repeatability at different probe sites looks good (see slides 5 to 11). – Currently use USBpixTestI4 to conduct Global Register, Pixel Register & Sync Scan tests and STControl to conduct Analogue, Digital and Threshold scans. – Would like to use STControl wafer test panel for all tests and automated probing. However, I have encounted a number of issues establishing a full prim list of tests.

Issues with wafer panel prim list. – Regulators On: Does this turn on analogue and digital power supplies? Doesn’t appear to work. – How are the GR & PR tests and current readings (I DDD1 etc) accessed? These results don’t appear to be displayed in the Module Analysis panel.

Wafer ID:V2AQMLHAnalogue TestDigital Test Chip No. IDDA1 (mA) IDDA2 (mA) IDDD1 (mA) IDDD2 (mA) Global Register Test Pass Pixel Register Test Analogue Pixels with Occ ≠ 200 Digital Pixels with Occ ≠ 200 Mean Threshold Threshold Sigma Comments Yes Yes Yes Many pixels fail analogue test and threshold scan Yes Yes na Many pixels fail analogue test. No meaningful threshold scan Yes Yes Many pixels fail threshold scan YesNo Yes na V high digital current during PR Test. Analogue & Digital Tests Empty 10na V high current on analogue and digital channels (>0.5A) Yes na Many pixels fail analogue test Yes na Many pixels fail analogue test Yes Yes Initial Measurement 18 Yes Measurement after reprobing Yes Initial Measurement Yes Measurement after reprobing Wafer results spreadsheet. No pass/fail criteria set yet.

Repeatability Measurements

DieBad Pixels (Analogue) Bad Pixels (Digital) Mean Threshold Sigma Threshold (Repeat) (Repeat) Summary of Repeatability Measurements

Die 18: Initial Analogue Occupancy Plot (Left) and Analogue Occupancy after re-probing (Right)

Die 18: Initial Digital Occupancy Plot (Left) and Digial Occupancy after re-probing (Right)

Die 18: Initial Threshold Scan (Left) and Threshold Scan after re-probing (right)

Die 20: Initial Analogue Occupancy Plot (Left) and Analogue Occupancy after re-probing (right)

Die 20: Initial Digital Occupancy Plot (Left) and Digital Occupancy after re-probing (Right)

Die 20: Initial Threshold Scan(Left) and Threshold Scan after re-probing (Right)