Energy Trust of Oregon Small Commercial HVAC Pilot Program Stellar Processes December 15, 2009.

Slides:



Advertisements
Similar presentations
Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30,
Advertisements

TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
eQuest Quick Energy Simulation Tool
Prestige 2.0 Commercial Thermostat with Internet Connectivity.
Entropy balance for Open Systems
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
Advanced Direct Evaporative Pre-Cooling for Air Cooled Condensers (DEPACC) Program Overview Technology Overview Energy Savings Customer Benefits 1.
Field Challenges with DCV Systems Dr. Andrey Livchak, Derek Schrock and Jimmy Sandusky Halton Group Americas
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Weatherization Program Evaluation in Vermont
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
1 Roof Top Units Saving Energy and Improving Occupant Comfort Presented by Ethan Bellavance and Mary Jane Poynter.
Action-Oriented Benchmarking Paul A. Mathew, Ph.D. Lawrence Berkeley National Laboratory Berkeley California Using CEUS Data to Identify and Prioritize.
DISTRIBUTION STATEMENT A: Approved for public release; distribution unlimited. NSWCDD-PR Will Clark Robert Snodgrass, PE Naval Surface Warfare.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Managing Operational Energy in Buildings
Green Building Demonstration Project Adam Saling City of San Diego.
Rooftop Package HVAC Operations and Maintenance Measures: David Baylon Stan Price Bob Davis.
EDISON INTERNATIONAL® SM Internal Use Only Page 1 Circulating Block Heater Alfredo Gutierrez Cal TF Work Paper Presentation October 23, 2014.
Manufactured Housing Duct Sealing Pilot - Independent Evaluation Results Tom Eckhart, Howard Reichmuth, Jill Steiner Regional Technical Forum February.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercial Windows and Insulation RTF November 2, 2010.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Northwest Ductless Heat Pump Pilot Project Impact & Process Evaluation: Billing Analysis Ecotope, Inc. February.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
EnergySmart Grocer Program Evaluation Findings Summary PWP, Inc.
BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Evaluation of the RTF Standard Protocol Fan and Cooling Savings from Commercial-Sector Heat Pump Units Rooftop Unit Working Group (RTUG) August 20, 2012.
RTU Savings Research Project RTU Savings Research Project: Findings and Recommendations Regional Technical Forum February 3, 2009 Mark Cherniack Howard.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Rooftop Unit Working Group - RTUG - January 19, 2010 Up on the Roof…”Up on the roof I've found a paradise that's trouble proof, up on the roof.” —C. King/G.
Monitoring Results – Ethelred Estate Chris Dunham, Carbon Descent 13 th July 2010.
Why Data Matters Building and Sustaining a Business Case NEAUC Conference June 18, 2014.
Grocery VSD Measure Deemed Savings Reid Hart, PE & Ken Anderson September 28, 2010.
Energy Plus & Open Studio Class
Multifamily Homes: Calibration Update Regional Technical Forum December 8 th, 2015.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF August 30, 2011.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Regional Air Source Heat Pump Performance and Savings Research and Evaluation Project Proposed Scope of Work and Estimated Budget February 10, 2004.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
State Technologies Advancement Collaborative (STAC) Status Report Current Field Study Stellar Processes and Ecotope March 9, 2016.
Page 1 IceCold Pilot Study. Page 2 Pilot Candidate: Siemens 501 Fountain Parkway 32 RTUs provide cooling to 170,000 SF of Office and Production Spaces.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
What is Voltage Optimisation? Voltage optimisation is a generic term given to the managed reduction of voltages received from a supplier down to a value.
DNV GL © 2016 SAFER, SMARTER, GREENER DNV GL © 2016 HVAC 3 Quality Maintenance Program Year Impact Evaluation.
Draft SMECO EmPOWER Plans April 15, 2011.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTUG January 19, 2010.
A Calculator for Reliably Measuring the Savings from Advanced RTU Control Retrofits August 27, 2015 Presentation to: RTF Commercial Rooftop Unit Working.
Welcome to Baity's Inc! HVAC, Heating Repairs, Cooling Services and Air Conditioning & Heating - Winston-Salem NC Baity's Inc.
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Fort Stanwix National Monument Energy Audit Contract
Welcome to the Colorado Restaurant Association Pikes Peak Chapter Energy Efficiency in the Restaurant Industry.
Best Practices in Residential Energy Efficiency
HVAC Repair - A Guide for Everyone
Health and Safety Investments to Increase Energy-Saving Opportunities
Health and Safety Investments to Increase Energy-Saving Opportunities
Enhanced Unitary HVAC Maintenance Tune-Up Program
Weather and Your Restaurant’s Operational Costs
Minimizing Heating & Cooling Costs
Newell Development HVAC Services and Preventative Maintenance Proposal
Presentation transcript:

Energy Trust of Oregon Small Commercial HVAC Pilot Program Stellar Processes December 15, 2009

Small Commercial HVAC Pilot Program Goal: test feasibility of specifying a standard repair treatment that can be applied by contractors in a production mode in order to reduce deployment costs. Install a new programmable thermostat. Set up proper scheduling and night setback. Install drop-in economizers where appropriate. Ensure that economizers are connected with two-stage control wiring. Install the new sensors that permit better economizer operation. Properly set economizer changeover point. Repair noticeable air leaks around roof curbs. Clean coils. 12/15/20092ETO Small Commercial RTU

Production Mode for Rooftop Units 12/15/20093ETO Small Commercial RTU

Energy Signature Analysis Example 12/15/20094ETO Small Commercial RTU

Short-term Monitoring Minimal metering. Short term measurements of (1) energy consumption by the HVAC unit and (2) temperature of the delivered air. Does not allow an explicit measurement of economizing or isolation of specific measures. Slope and intercept parameters from Energy Signature plot used to extrapolate savings. Are data sufficient? 12/15/20095ETO Small Commercial RTU

Site Details Strip mall site containing a representative mix of small business types. Included are two sit-down restaurants, a fast food outlet, a retail store, an office and professional services (dentist, veterinarian, hair salon). Standard repair protocol on a row of essentially the same HVAC unit. 12/15/2009ETO Small Commercial RTU6

Field Treatment Three of the HVAC units already had economizers. Only one was functional. The other two units did not have two-stage controls. With one exception, outside ventilation was disabled on all the units. None of the businesses had proper scheduling of HVAC operations. All the units received a pressure wash of the coils. Repair noticeable air leaks around roof curbs. 12/15/2009ETO Small Commercial RTU7

Implementation Challenges Metering was still a challenging task. True power to avoid any power factor issues. Equipment problems on two HVAC units. However, both of these units had an identical twin serving the same space. Data collected at one-minute intervals to bin consumption into heating or cooling events. This requires a database operation to merge all the data streams and align by time of day. 12/15/2009ETO Small Commercial RTU8

Analysis Challenges 12/15/2009ETO Small Commercial RTU9 Sometimes the model fit is not clear and the regression must be forced through a zero point. In such cases, some judgment is necessary to estimate a fit to the observed data points.

Test of Extrapolation Method 12/15/2009ETO Small Commercial RTU10 “Before” and “after” weather conditions lead to savings estimates that are similar but not exactly the same. Difference due to relative amount of change expected for compressor cooling (slope) versus the ventilation savings (flat part).

Test of Annual Extrapolation Method 12/15/2009ETO Small Commercial RTU11 Average estimated savings on an annual basis agree closely with the average of short term results.

Local Microclimate versus Long-Term Weather Data 12/15/2009ETO Small Commercial RTU12 Are the short term results representative of the 365-day weather data used for the annual extrapolation? This question is not resolved by the current study.

Summary of Electric Savings Case Pre- retrofit kWh Post- retrofit kWh KWh Saved% SavedTreatment Dentist Back5,8261,6454,18172%New economizer, new thermostat, implemented setback Dentist Front7,8272,7165,11265%New economizer, new thermostat, implemented setback Pizza Kitchen3,1921,1592,03364%New economizer, new thermostat, implemented setback Sandwich Shop15,1316,4328,69957%New economizer, new thermostat, implemented setback Shipping Store2,9491,2551,69457%New economizer, new thermostat, implemented setback Pub5,7163,3812,33441% Restored non-functioning economizer, set changeover to 63 deg, new thermostat, implemented setback Office4,6583, %New economizer, existing thermostat, implemented setback Pizza Front12,94110,6322,30918%No economizer, new thermostat, implemented setback Vet Front3,5613, % Restored non-functioning economizer, set changeover to 63 deg, new thermostat, implemented setback Hair Salon4,0263, % New economizer, new thermostat, implemented setback, increased ventilation Retail Front2,4212,371492% Existing economizer was functional, set changeover to 63 deg, new thermostat, implemented setback Vet Back4,2314,169621%New economizer, new thermostat but no setback Retail Back %Cleaning but no other treatment, unit is seldom in use Average 5,6003,4552,14538% All units (15 cases) 2,07437% 12/15/2009ETO Small Commercial RTU13

Computed Space Heat Savings 12/15/2009ETO Small Commercial RTU14 Observed instances of the warm-up length and balance temperature for seven cases. Assumed fixed percent outside air and airflow rate. Average for all units, 2.5 annual therms or 0.6% of space heat.

Program Cost Effectiveness Cases Average KWh Average Therm studied Savings Savings 13 Directly monitored2,14538%2.40.6% 15 Including all units2,07437%2.50.6% Unit cost$1,685 PV of electricity, per kWh$0.980$0.702 PV of Gas, per therm$7.872$6.078 PV of Benefits$2,052$1,471 BCR Discount Rate5.2%5.2% Lifetime1510 Levelized Cost, per kWh$0.078$ /15/2009ETO Small Commercial RTU15

Conclusions In general, the energy signature methodology appears successful. A question remains regarding the use of long-term (TMY) data for extrapolation. Savings averaged 2,074 annual kWh or 37% of VAC consumption. Estimates should still be validated with long-term billing simulation. Energy Signature method provided reasonable extrapolations to annual savings. Savings were due to a variety of treatment measures. Most important were proper scheduling and programming of night setback and the addition or repair of economizers. The verification methodology does not allow savings to be isolated to specific treatments. For about one third of the cases, the tune-up repairs did not result in savings. This is a small amount of “dry holes” and it is probably not necessary to attempt to screen out such cases. Before the repairs, most of the systems exhibited problems. Computed small gas warm-up savings averaging 2.4 annual therms. The savings are due to lockout of outside air during morning warm-up and are accomplished by the new programmable controls. Unit cost averaged $1,685 for labor and materials. The estimated Benefit Cost Ratio is 1.22 for 15-year life or 0.87 for 10-year life. 12/15/2009ETO Small Commercial RTU16