4/2/2003P. Riedler/CERN SPD Team1 Testing Wafer test status Annealing tests on VTT ladder.

Slides:



Advertisements
Similar presentations
Radiation damage in silicon sensors
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
D. Elia, INFN BariALICE Offline Week - June Recent results from SPD beam test D. Elia, R. Santoro INFN Bari ALICE Collaboration - SPD Group.
UK – quad module. Experience with FE-I4 UK groups relatively new to ATLAS pixel Have 5 USBPix systems up and running now – Glasgow, Edinburgh, Manchester,
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Status and outlook of the Medipix3 TSV project
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
Charge collection studies on heavily diodes from RD50 multiplication run G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
Haga clic para modificar el estilo de texto del patrón Progress on p-type isolation technology M. Lozano, F. Campabadal, C. Fleta, S. Martí *, M. Miñano.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
16/11/01GS/ALICE SPD/LHCC Referees1 ALICE Silicon Pixel Detector (SPD) G. Stefanini/CERN-EP General Front-end electronics – pixel bus – ALICE1 ASIC – PILOT.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
NINO RO chip qualification with the laser test system Sakari and Fadmar.
TPAC progress Jamie C 29 th July TPAC1.1 Status Submitted 17 th –Some minor DRC errors found at foundry –Corrected/waived Re-Submitted 23 rd July.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
Edge-TCT and Alibava measurements with pion and neutron irradiated micro-strip detectors V. Cindro 1, G. Kramberger 1, I. Mandić 1, M. Mikuž 1,2, M. Milovanović.
1 G. Pellegrini The 9th LC-Spain meeting 8th "Trento" Workshop on Advanced Silicon Radiation Detectors 3D Double-Sided sensors for the CMS phase-2 vertex.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
1 Silicon Testing at KSU Sergey Korjenevski Kansas State University 06/18/2002 (11 slides total)
13 January 2004V. Manzari - Quark Matter Oakland1 The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the.
Report on CMS 3D sensor tests Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
3rd NoRDHia 1 TITLE INVESTIGATION OF DIAMOND SAMPLES UNDER HIGH DOSES OF ELECTROMAGNETIC IRRADIATION (at S-DALINAC) Wolfgang Lange, DESY Zeuthen.
Glass slide Micropipettes Starting Materials Cut along dotted traces Plexiglas square (1.1” x 1.1”) 0.2” Interface reservoir sleeves Drummond 1-5-µL micropipette:
Wafer probing in Legnaro/Padova E. Fioretto Laboratori Nazionali di Legnaro for the LNL-Padova SPD Test Group 04/02/2003 E. Fioretto INFN - LNL SPD Meeting.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Annealing of CCE in HPK strip detectors irradiated with pions and neutrons Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko.
Central European Consortium R&D of Central European Consortium (CEC) Status & Plans (Sensor Technology) Georg Steinbrück, Hamburg University Aachen DESY.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
17 december 2003 Gert-Jan Nooren december 2003 Gert-Jan Nooren 2 ITS SSD in 2003.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
CNM double-sided 3D strip detectors before and after neutron irradiation Celeste Fleta, Richard Bates, Chris Parkes, David Pennicard, Lars Eklund (University.
P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.
The Silicon Pixel Detector (SPD) is part of the Inner Tracking System (ITS) of the ALICE experiment. ALICE is designed to study the properties of strongly.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
RD50 RD50 Workhop: CERN Katharina Kaska Epitaxial silicon detectors irradiated with protons and neutrons Katharina Kaska, Michael Moll RD50 Workshop.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
FBK 3D CMS pixel sensors preliminary lab measurements E. Alagoz 1, A. Krzywda 1, D. Bortoletto 1, I. Shipsey 1, G. Bolla 1, and G. F. Dalla Betta 2, M.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Module Assembly - Overview and SWB bumping -
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Design consideration on thin LGAD sensors
Preliminary results from 3D CMS Pixel Detectors
Update on Bump Bonding GTK-Meeting Sep. 2, 2008 pr.
Highlights of Atlas Upgrade Week, March 2011
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Results from the first diode irradiation and status of bonding tests
A Beam telescope for the EMC testbeam
Status of Hamamatsu Silicon Sensors
Presentation transcript:

4/2/2003P. Riedler/CERN SPD Team1 Testing Wafer test status Annealing tests on VTT ladder

4/2/2003P. Riedler/CERN SPD Team2 Wafer Test Status Delivery 2000:4 wafers fully tested - preliminary test criteria - installation of the setup Delivery 2001:12 wafers fully tested (from 3 lots) - 1 wafer tested in Catania - 1 wafer tested in Legnaro - test criteria applied - FO test not included Total no. of chips tested: 1376

4/2/2003P. Riedler/CERN SPD Team3 Class I, II, III chips per Wafer Delivery 2001: CLASS I: 33-74% CLASS II: 9-27% CLASS III: 22-51% *4 wafers tested and classified by NA60 ** sample of 8 wafers

4/2/2003P. Riedler/CERN SPD Team4 Annealing Tests Singles: µm detector Increased leakage current observed on most singles and ladders from VTT

4/2/2003P. Riedler/CERN SPD Team5 VTT Ladders 2001: 80V(300µm) 80V(300µm) 2002: VTT1-2002: 15V(200µm) VTT2-2002: 20V(200µm) VTT3-2002: 20V(200µm) VTT4-2002: 80V(300µm) Could the higher current be caused by humidity in the polyimide? Annealing could help……

4/2/2003P. Riedler/CERN SPD Team6 Candidate: Ladder-VTT (thin ladder) with damaged corner 99.7% 99.9% <80% 90 Sr: Leakage Current: 20V (V fd =15V) Test Procedure: measure I leak, metrology, source test -> Annealing repeat measurements

4/2/2003P. Riedler/CERN SPD Team7 1. Before Annealing: Leakage Current: 20V (V fd =15V) Long edge (on chips) Metrology:

4/2/2003P. Riedler/CERN SPD Team8 2. First Annealing Step: °C Leakage Current: V (V fd =15V) Metrology: Bow Long edge (on chips): 53.13µm 3. Second Annealing Step: °C Leakage Current: V (V fd =15V)

4/2/2003P. Riedler/CERN SPD Team9 Long edge (on chips)

4/2/2003P. Riedler/CERN SPD Team10 Leakage Current

4/2/2003P. Riedler/CERN SPD Team11

4/2/2003P. Riedler/CERN SPD Team12 Mean Threshold But baking is not without problems…….

4/2/2003P. Riedler/CERN SPD Team13 Chip 68 after baking

4/2/2003P. Riedler/CERN SPD Team14 Testbeam 2003 Proton Run: June 25 - July 9 H4 Long MD June 25/26 Short MD July 2 Setup similar to 2002 (4 reference planes, crossed?) Improvement of scintillator mounting to be done.. Program depends on progress in coming months… Thin ladders! Preparation should start well ahead

4/2/2003P. Riedler/CERN SPD Team15 Please join the testbeam crew !

4/2/2003P. Riedler/CERN SPD Team16 Short edge (on sensor)

4/2/2003P. Riedler/CERN SPD Team17 Long edge (on sensor)