9/16/2003; Revised 7/12/2004 DPI Vehicle Fleet Management IM-1 1 Use this procedure to extend material master data to another plant. 1.From the SAP R/3.

Slides:



Advertisements
Similar presentations
1 Materials Management Navigation & Display. 2 Course Content General IRIS System Navigation Demonstration  Display Material Master Data – MM03  Display.
Advertisements

September 17, 2004 Revised 11/8/2012 DPI Vehicle Fleet Management OP-1 1 Use this procedure to review and print DP02 MI/PM work orders scheduled for your.
MATERIALS STAGING AND TRACKING Session 3605 Gary Zien Bayer Corporation Pittsburgh PA.
North Carolina Department of Public Instruction Transportation Services December 2014 Craig Warren Transportation Consultant Inventory Training Module.
North Carolina Department of Public Instruction Transportation Services December 2014 Craig Warren Transportation Consultant Inventory Training Module.
Pen Inc Introduction to Your Company
Basic Navigation in SAP For the Windows Graphical User Interface (GUI) Click your mouse anywhere or select “Page Down” to scroll through the pages.
To begin a Requisition: 1.Click Main Menu 2.Click eProcurement 3.Click Create Requisition Enter a Requisition Name Select step 2: Add Items and Services.
1 Command Field: Use this field to go to transactions directly by entering the transaction code. The transaction codes can be found either in the SAP Easy.
EPerformance Module 2 – Chapter 2. Preparing the employee’s appraisal For this training: 1.The employee has submitted his/her self-appraisal. 2.Colleagues.
SAP Navigation EIN 5359, Spring 2009 R/3 SAP Integrated Solution Client / Server Open Systems Financial Accounting Controlling Fixed Assets Mgmt. Project.
A Short Course on How to Manage SLOs with TracDat.
Material Number (DOT#) Search DPI Vehicle Fleet Management IM-5
Issuing Material to Work Orders DPI Vehicle Fleet Management
DPI Vehicle Fleet Management
DPI Vehicle Fleet Management- DR-14
DPI Vehicle Fleet Management OP-7
DPI Vehicle Fleet Management DR-20
Report of All Materials Used on a Vehicle
Display Time Confirmations DPI Vehicle Fleet Management DR-5
Reviewing Daily Transactions DPI Vehicle Fleet Management DR-3
Display Material Master DPI Vehicle Fleet Management IM-3
Create Odometer Measurement Documents
Cancel Time Confirmations DPI Vehicle Fleet Management TE-4
DPI Vehicle Fleet Management DR-6
DPI Vehicle Fleet Management DR-21
DPI Vehicle Fleet Management DR-18
DPI Vehicle Fleet Management IM-4
Two methods to observe tutorial
Two methods to observe tutorial
Report of Non-Stock Purchases for Work Orders
W/o Completing a Physical Inventory DPI Vehicle Fleet Management IA-1
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
DPI Vehicle Fleet Management DR-10
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
(Work Orders W/One Operation) DPI Vehicle Fleet Management TE-2
Verify Charges under ZFB61 DPI Vehicle Fleet Management NS-3
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Presentation transcript:

9/16/2003; Revised 7/12/2004 DPI Vehicle Fleet Management IM-1 1 Use this procedure to extend material master data to another plant. 1.From the SAP R/3 System Easy Access screen or from your favorites, enter or select transaction code ZMM01Z. 2.Click or press Enter. The Create Material (Initial Screen) displays. 3.Enter Material Number; repeat material number in “Copy From” field. 4.Click or press Enter. 5.On the Select Views screen, select the following required views by clicking in the box to the left of each view. - Basic Data 1 - Basic Data 2 - Classification - Purchasing - Purchase Order Text (Do not make changes in this view) - MRP1 - MRP2 - MRP3 - MRP4 - Forecasting - General Plant Data/Storage1 - General Plant Data/Storage2 - Quality Management (Do not make changes in this view) - Accounting1 6.Place checkmark in Create views selected box. 7.Click Default values icon to save the selections. 8.Click on Organization levels to display Organizational levels screen. 9.Enter your Plant and Storage Location code. 10.Under Copy from, enter Plant 6000 and Storage location Click on the green check. Extend Material Master ZMM01Z Back Cancel Help Exit Enter Save Execute Basic Commands Notes If a warning message is received on the Create Material (Initial Screen) stating “You do not have the authorization to create a material”, you need to exit the transaction and submit a request for a new DOT number – the number you are trying to extend does not exist in the DPI catalog.

9/16/2003; Revised 7/12/2004 DPI Vehicle Fleet Management IM The Create Material XXXXXXXX (Semifinished products) screen displays. Either the Classification or Purchasing views will display based on the type of material being extended. If Classification view displays, click to proceed to the Purchasing view. Note: Each view displays as a tab. 13.Press Enter until the MRP 2 tab displays. 14.Enter or select a value for the following field: - Storage loc. for EP – enter your storage location. 15.Press Enter or click the green checkmark until the Plant data/stor. 1 tab displays. Note: Do Not just click the tab; you must press Enter through all selected tabs to properly extend the material. 16.Enter or select a value for each of the following fields: - Unit of issue – enter issuing criteria Only if different from Base Unit of Measure. - Storage bin – enter storage bin location (optional) 17.Continue to press Enter or click the green checkmark to move through the remaining required views until the system asks if you want to save your data. 18.Select Yes. Important Note! If at any point you are stopped a field requires input before you can move to the next view and you are unsure what to enter, open another session, enter transaction code MM03 and display the material in Plant Make a note of what has been entered on that screen and enter the exact same information on the ZMM01Z screen. 19.The system will return to the ripple pool screen and a message in the status bar will state that the material has been created.