Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.

Slides:



Advertisements
Similar presentations
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
Advertisements

June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
LKr readout: present and future R. Fantechi 30/8/2012.
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Problems with Muon System N. Bondar O.Maev
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of NA62 straw electronics Webs Covers Services Readout.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
NA62 straw tracker readout status Georgios Konstantinou
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Straw VME Data Monitoring M. Koval Straw WG meeting
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
19 Apr 2007DAQ Readiness1 Paul Dauncey. 19 Apr 2007DAQ Readiness2 DAQ hardware layout ? More CRCs New HCAL stage May not be used.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Straw readout status Run 2016 Cover FW SRB FW.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Status of NA62 straw electronics and services
Status of NA62 straw readout
LKr status R. Fantechi.
Michal Koval (CERN) Straw WG Meeting
Vito Palladino Straw Working Group 23/3/2015
COVER Full production should arrive today
Run experience Cover FW SRB FW DAQ and monitoring
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO

Services All 4 chambers wired with HV, LV and data cables – Still need to close electrically all cable trays HV distribution – Worked from the start without a problem – Last week I cover tripping Wire, web, HV connector/cable? Data cables – Rather long but seems to be still OK for safe operation of cover link VME crates – No problems VME SBC – Had to be reinstalled with OS – Should we use boot server instead of local installation? – Painful ‘/afs’; local account? Patch panels – HV OK – LV - No lost ELMBs

Services MPOD – 4 MPODs installed and working – 1 HV module bad since delivery 3 channels + mess in crate Sent for reparation Using 2 8ch modules borrowed from Wiener instead – Safety features Safety loop works but ‘clear event’ not available on front panel Current trip works but must better understand how to set current_limit + time – Saw few trips recently Current DCS software is always disabling current limit For the rest of the run we must use factory software DSS – Using MPODs safety loop and current trip – Installed and tested

Covers 4 chambers work! – 1 cover has to be replaced Repeated from previous presentation Need to rebuild our ‘test rack’ and ‘test bench’ – VME crate from test rack is for chamber 4 – Need to keep test bench alive for (re-) tesing covers – Take 6U VME crate from the POOL – Johan will provide injection control and circuitry – In 154 we will keep Complete readout with straw prototype for development Cover test bench Spare covers, spare SRBs, patch panels (?) Components and cables

SRB Plans and reality – 1 st batch of 24 boards received end of July Good yield – 4 do not work at all, 2 some problems – 2 nd batch of 23 boards (1 not mounted) Bad yield – only ~10 working – 3 SRBs still missing to have a full detector equipped Trying to fix at least 3 boards till Wednesday

VME manager Front-End (To covers) Event Manager x2 Gb eth TTCrx Trigger Manager LOOKUP TABLE DDR3 ETH HISTOGRAM SRAM QDR CLOCK DELAY ALL COMPONENTS TESTED AND WORKING

SRB firmware Basic version with 0 bias (everything transmitted to pc- farm) seems to be now working and stable, even with high intensity beam Delayed due to number of problems mainly with FPGA compiler and IP cores – Bugs, poor or non-existent documentation – Lost cca 6 weeks Trigger matching FW – Time re-ordering code written Not tested – Still need to write DDR3 management and data packing – Debugging and testing phase – How relevant it is for this year?

Summary and plans Since July we are constantly developing and improving the straw readout system – Hardware (mainly testing and making alive new boards), DSS – Firmware (both cover and SRB) – Software (HUGE progress, DAQ, monitoring, run control, DCS, DSS, etc) Despite number of unexpected problems we have now a running stable system capable of taking data continuously even with high rate (20% nominal) in the last 2014 run week – Define procedure for T0 adjustment – Install and test data trigger matching – Define online and offline monitoring What MUST be done on SRB What can or can’t be done on SRB What must be done on PC How often and how much raw data we should store through VME interface for monitoring – Data analysis Feedback on detector performance Scan thresholds ? Scan HV ?