Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.

Slides:



Advertisements
Similar presentations
IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
Advertisements

NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
Heavy Concrete Construction Formwork
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Subpart R Steel Erection
Cooling Business Group 1 INSTALLATION Directions.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Muon g-2 Installation Schedule All Experimenters Meeting June 16, 2014 Aria Soha Muon g-2 I&I Manager.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
LUCOEX Large Underground Concept EXperiments 2011 – 2014 Work Package 5 KBS-3V Emplacement tests in ONKALO Progress and Plans Project Progress Meeting.
For more info visit at For more info visit at
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
LHCb Radiation Shielding Wall – Lifting Tool Overview.
Xenon Detector Installation schedule Satoshi MIHARA.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Ventilation Cooling Mark A. LaurentiMarch 2002 Modular Configuration.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
CLIC Civil Engineering Update
LBNF CAD models, Drawings and Component list
Francois and Lau EATM 17 July 2012
VELO-installation meeting CERN, January 17, 2006
Complementary ISTC Projects #3888, 3889p
MICE Partial Return Yoke Mechanical Design
INSTALLATION SEQUENCE
Endcap shielding senarios:
CE Status: Activities executed until 03/08 and ongoing
Transfer lines status 10/11/2016 O.Crespo-Lopez.
TAS at IP1 Present situation and plans
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Far Detector Activities Late 2017 – Early 2018
UK RFD Pre-Series cryomodule
Technical Support Activities in PH-ADO-PO
Material Handling Material Handling –
X-ray Pump-Probe Instrument
Assignment #3 Group 3.
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
The Mechanical Engineering & Technology (MET)
Muon Installation Status
Polarized 3He target installation
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION

Visit Gangway FromLHBIEP__0181 by Andre Coin GANGWAY POSITION

Visit Gangway INSTALLATION PROCEDURE The following list shows the proposed installation procedure, tools, access devices and timing once the gangway and stairs have been upgraded and the supports manufactured. 1.- Draw the supports positions in the wall using a lifting platform and an optical level by two persons. 2 hours. 2.- Drilling top anchors holes for each support using a lifting platform, drilling machine and vacuum machine, works must be done by two persons. 2 hours. 3.- Pre-installation and alignment supports, supports will be lift up by the cavern crane, access to the anchors will be done by lifting platform, works to be done by 2 persons plus 2 crane drivers. 4 hours. 4.- Once the supports alignment drilling bottom holes and anchoring each support, access by the lifting platform, 2 persons. 2 hours. 5.- Lift up the gangway by the cavern crane and placing it over the supports, adjustment tasks and bolted operation access by the lifting platform, 2 persons plus two crane drivers. 8 hours. 6.- Once the gangway is properly bolted to the wall supports lift up the stairs by the caver crane and bolted to the gangway access by the lifting platform, 2 persons plus two crane drivers. 8 hours. The works for the gangway and stairs upgrade as add cross beams, barriers modification and painting will be done in surface, works could be done by 2 persons and some supports from 2 crane drivers during the handling operations. 24 hours.

Visit Gangway INSTALLATION SCHEDULE The following table shows a first proposal for manufacturing, upgrade and installation for the new Gangway. Supports manufacturing:2 days in August or September Gangway and stairs upgrade:3 days in August or September Installation in the cavern:3 days in September or October * (*) Dates should be decided in agreement with the LHC shutdowns and other LHCb works.

Visit Gangway MORE INFO

Visit Gangway MORE INFO CATIA Engineering Drawing Performed by Andre COIN