LOSE4GOOD.ORG (BY TEAM 08) PROMOTE HEALTHY LIVING.

Slides:



Advertisements
Similar presentations
AmeriCorps is introducing a new online payment system for the processing of AmeriCorps forms
Advertisements

QuEdge Testing Process Delivering Global Solutions.
SP Business Suite Deployment Kick-off
PROCESS FRAMEWORK Lecture - 3. Topics covered PROCESS FRAMEWORK PROCESS MODELS DIFFERENCE.
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
A Product of Event Management, Register, Schedule & Report Entire Back to Back Event Management Solution Copyright © ANGLER.
City of LA Personnel Department Mobile Application Team 02 1.
Release & Deployment ITIL Version 3
EPayment ePayment Introduction It is the process of electronic transfer of bill data between booking and payment office Department of Post collects.
TRR ARB Presentation Women at Work Website Redesign.
Software Enhancements Operations keeps the lights on, strategy provides a light at the end of the tunnel, but project management is the train engine that.
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
A database driven socially connected website (By Team 08)
1 Lender Development Program Requirement Understanding Document September 17, 2008.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
Software System Engineering: A tutorial
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
Portal User Group Meeting June 29, Agenda Introduction (Angela Taetz) Ulogin (Mario Mezzio) Database Breakup (Mario Mezzio) New Help Desk Forms.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
LOSE4GOOD.ORG (BY TEAM 08) PROMOTE HEALTHY LIVING.
Elockbox Team08 Fall2014 Jian Lei Role(s): Project Manager / Builder Da Lu Role(s): Prototyper / System/Software Architect Cheng Role(s):Feasibility Analyst.
Volunteer Management System Presented by Team SE18-08S.
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
Healthy Kids Zone Team Operational Concept Description Xu Zhang 2.
Redesigning the Website Matt “The Cat” Pittner Dr. Carl “Arizona” Rebman MSIT 573 Summer 2005.
IT Requirements Management Balancing Needs and Expectations.
© Mahindra Satyam 2009 Configuration Management QMS Training.
MSA Science Online Testing MAG Conference November 16, 2006.
Free Powerpoint Templates Page 1 Free Powerpoint Templates FP7 – Secure Enterprise Remote Banking System (SERBS) Small or medium scale focused research.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Mission Science By Team Team 07 Members Jiashuo Li Chen Li Sergey Mukhin Hanadi Mardah Yun Shao Farica Mascarenhas 2.
1 Based on PMI the Methodology. 2 This document has a sole propriety owner. © 2015 i-Clipse Technology, a Private Canadian Corporation. All rights reserved.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
T Iteration Demo Tikkaajat [PP] Iteration
LOSE4GOOD.ORG CORE CAPABILITY DRIVE-THRU (CCD) TEAM 08.
T Project Review Muuntaja I1 Iteration
Thrdplace Social Networking Team #7 1. TRR Outline Operational Concept Overview System benefits to Customer 1.Introduction Demo of System Operational.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Travesoft A web product developed for Travel & Tours Companies by Gridaxis softwares travesoft.gridaxis.in Gridaxis Softwares.
LOSE4GOOD.ORG (BY TEAM 08) PROMOTE HEALTHY LIVING.
... Transform young lives through Music
Cash Doctor 3.0 Mobile Application
Image Processing Platform
Transitional Readiness Review Team 08
ShareTheTraining TRR ARB Presentation Team 11
DCR ARB Presentation Team 5: Tour Conductor.
IEEE Std 1074: Standard for Software Lifecycle
Description of Revision
Diabetes Health Platform
Team - 03 Transition Readiness Review
1 Making you aware CS577a 17Fall Team 04.
Team 07-Fuppy Krupa Patel Adil Assouab Yiyuan Chen(Kevin)
Diabetes Health Platform
Engineering Processes
Correcting Entries Training
Mission Science By Team 07.
ARB Schedule Locations
Metrics Stats n’ Stuff.
Correcting Entries Training
Real Estate Investment & Review Tool
Family Proud TRR ARB Presentation
Team 7- SCRIPTONOMICS Advanced movie script analytics made simple
Transition Readiness Review
Transition Readiness Review
Team 7- SCRIPTONOMICS Advanced movie script analytics made simple
TEAM 4 TRR PRESENTATION.
{Project Name} Organizational Chart, Roles and Responsibilities
Project Name Here Kick-off Date
NMDWS Internship Portal
Presentation transcript:

LOSE4GOOD.ORG (BY TEAM 08) PROMOTE HEALTHY LIVING

TEAM MEMBERS Paul Charron (Client)Ali Alotaibi (Project Manager)Shreyas Devaraj (Tester)Arul Samuel (Technical Lead)Abdulkareem (Quality Focal Point)Hasan Al Yousuf (IV & V)Omkar Yerunkar (Trainer) 2

AGENDA  Introduction  Operational Concept Description  Demo  Test Plan and Test Cases  Quality Management  Support and Transition Plan 3

OPERATIONAL CONCEPT DESCRIPTION

▪ Online application that potential weight-losers can use to stay motivated in their pursuit to lose weight. ▪ Motivation provided by sponsor who pledges donation to charity against weight-loser’s goal. System Purpose 5

IDCapabilityDescriptionPriority LevelIteration 1LoginLogin through the SystemMust Have1 2Facebook LoginLogin through Facebook to the SystemMust Have1 3RegisterRegister As New UserMust Have1 4Create GoalCreate New GoalMust Have1 5Track GoalTrack Existing Active GoalMust Have1 6Invite SponsorInvite Sponsor to an Existing Active GoalMust Have1 7 Respond to a sponsorship request Allow the Sponsor to Donate for Charity Organization associated with specific Goal Must Have1 8Financial Officer Reports Allow Financial Officer to View to Payment and Goal Reports Must Have1 9Financial Officer Paypal Report Allow Financial Officer to View Goal & Payment Reports Must Have1 10Monitor Payment Payments to the charity will be done after verification Should Have2 11Posting on FacebookAll the posts that will be posted on FacebookShould Have 2 12Report GenerationAll the detailed reports of payment and refunds will be generated Should Have2 6 Initial Operational Capability (IOC)

AccountFacebook PaymentReport 7 Lose4good

DEMO

CURRENT SYSTEM NAVIGATION FLOW 9 Lose4Good home page Profile Page Create Goal Page Invite Sponsor PagePersonal Details Page Pledge Money PageTransaction Result Page Paypal Financial Officer Page Pending Transaction Page Refund Page Track Goal Facebook Achieve Goal

TEST PLAN AND CASES

Unit Testing done by developers and Team Tester Acceptance testing done by client TEST PROCEDURES 11

▪ TC Verify successful Login ▪ TC Verify successful Login using Facebook credentials ▪ TC Verify unsuccessful Login ▪ TC Verify successful registration ▪ TC Verify successful goal creation ▪ TC Verify goal tracking ▪ TC Verify weight updating ▪ TC Verify achieve Goal ▪ TC Verify delete Goal ▪ TC Verify sponsor's invitation ▪ TC-06-02: Verify successful sponsor donation ▪ TC Monitor payment for a valid transaction ▪ TC Verify invalid transaction TEST CASES 12

TEST RESULTS 13 Test DateBug IDBug Description 03/26/ Track Goal Errors during CCD 04/14/ Graphs are not showing properly 04/14/ Approve transaction is not working!

QUALITY MANAGEMENT

Traceability Matrix 15

▪ Code Quality ▪ Bugzilla ▪ Dropbox ▪ Peer Reviews ▪ IIV & V ▪ GitHub QUALITY MANAGEMENT 16

▪ Progress Indicator Metric ▪ Test Case Metric METRICS 17

PROGRESS INDICATOR METRIC 18

TEST CASE METRIC 19

SUPPORT AND TRANSITION PLAN

TRANSITION STRATEGY 21 ▪ Setting up System for Production ▪ Transition Training Sessions TRANSITION PREPARATION ▪ No Hardware Preparation ▪ No Software Preparation: Heroku Cloud server, Github, PayPal ▪ No Site Preparation

TRANSITION Domain: Lose4Good.org Server: Heruko Access to Heruko Production website Deliver archive of work Access to GitHub Code Knowledge transfer to Maintainer Site Administration Manual will be provided Site Administration 22

TRANSITION MILESTONES 23 ▪ Knowledge transfer to Maintainer by 04/29/2014 ▪ Domain Name Registration by 05/05/2014 Archive Package Delivery with Github Access by 05/07/2014

TRAINING SCHEDULE 29 DateTimeLocationContents 04/29/ pm pmUSC Leavey LibraryManaging and usage of all functionalities of lose4good.org 04/29/ pm-08.00pmUSC Leavey LibraryMaintaining website on Heroku server