Presentation is loading. Please wait.

Presentation is loading. Please wait.

ARB Schedule Locations

Similar presentations


Presentation on theme: "ARB Schedule Locations"— Presentation transcript:

1 ARB Schedule Locations
All will be at SAL 322, except 2:00 – 3:20 slots will be at OHE 122 Print out a copy of your presentation for your client Put your slides on team website Otherwise, -2 points Monday 11/26/2018 Friday 11/30/2018 12:30 - 1:50 2:00 - 3:20 3:30 - 4:50 5:00 - 6:20 6:30 – 7:50 Monday Nov 30, 3:30 - Team 2 5pm - Team 1 Tues Dec 1 12:30 - Team 5 3:30 - Team 3 Fri Dec 4 12:30 - Team 7 2pm - Team 4 3:30pm - Team 6

2 DCR success criteria For the selected architecture, a system built to the arch. will: Support the Ops Concept Satisfy the Requirements Be faithful to the Prototype Be buildable within the budgets and schedules in the Plan All major risks resolved or covered by risk management plan Key stakeholders committed to support full life cycle

3 DCR Expectation Less time for OCD Continue on Prototype
More time for Architecture, Plan  Fine-tuning based on FCR ARB experience  Focus on changes since FCR  Emphasize material that is relevant to 577B (or to end of class)  Risk management still fundamental

4 Presentation Outline (2 semesters)
(x,y): (presentation time, total time) (5, 5) Acceptance Test Plan and Cases; Team's strong and weak points & Overall Project Evaluation (DEN Remote Team member) (5, 5) OCD. System boundary, and desired capabilities and goals; top-level scenarios  (10,10) Prototype Update. Changes in significant capabilities (especially those with high risk if gotten wrong) (5, 5) Requirements. ALL high priority or changes in requirements; rating for all others (10, 15) Architecture. Overall and detailed architecture; design if critical; COTS/reuse selections (NOT JUST CHOICES) (10, 15) Life Cycle Plan. Focus on 577b Plan; Include plans for Construction-Transition-Support initial cycle “Plans” during 2nd Foundations Iteration; Team members’ roles & responsibilities in 577b, Iteration Plan (5, 10) Feasibility Evidence. Refined business case; major risks; general discussion (5,5) Quality Focal Point –Solved & Remaining Technical Debt, Traceability Matrix between OCD, Arch, Test cases, 2 selected metrics (10) Feedback from Instructors Focus on changes (particularly new things) since FCR

5 Transition Readiness Review
Product works as expected (or not with noted exceptions) Product will help users do job Show quality development Show sustainability  Show confidence that product is/will be ready to be used e.g. Transition plan & status

6 TRR Presentation Outline
5 minutes Operational concept overview, TRR specific outline, transition objective & strategy 25 min. Demo of Initial Operational Capability (Product status demonstration) 10 min. Test Cases, Procedures and Results  5 min Quality Focal Point - (Solved & Remaining)Technical Debt, Traceability Matrix, 2 selected Metrics 10 min. Summary of Transition Plan (as appropriate) HW, SW, site, staff preparation Operational testing, training, & evaluation Stakeholder roles & responsibilities Milestone plan Required resources Software product elements (code, documentation, etc.)

7 Marks allocation (70 points)
Quality of the presentation: 10 Quality of the project: 40 Progress: 10 Consistency: 5 Time Management: 5


Download ppt "ARB Schedule Locations"

Similar presentations


Ads by Google