LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.

Slides:



Advertisements
Similar presentations
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Advertisements

HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
LKr for the dry run (and not only…) R. Fantechi 23/5/2012.
Digital I/O Connecting to the Outside World
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Module 2: Hardware and Terminology
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
LKr readout: present and future R. Fantechi 30/8/2012.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
POWER PLANT USED IN TELECOM
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
LKR Working group Introduction R. Fantechi October 27 th, 2009.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
NA62: The LKr Electronics Matt Huszagh. Installation & Setup (1/5) Crate Setup 8 vertical columns of 4 crates Almost all installed.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
The High Voltage problem
SCADA for Remote Industrial Plant
DCS WG report 9/09/11 FV.
ATLAS MDT HV – LV Detector Control System (DCS)
DCS WG report 9/09/11 FV.
Front-end electronic system for large area photomultipliers readout
Radiation- and Magnet field- Tolerant Power Supply System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi

The basic elements in NA48 CPD Fastbus crates (Readout) Miscellaneous crates not controlled by Caenet Transceiver power supplies Preamplifier power supplies Crate temperatures Monitoring of the ventilation equipment –Temperature and status bits Thermal switches in the racks High voltage system R. Fantechi Green = for NA62

Switching on/off – The principle Anything which is not CAEN crate –Fastbus, transceiver power supplies, preamplifier power supplies –Use two independent lines One for on, one for off Send a pulse (1 sec, could be less) Specific hardware copied from Fastbus crate schematics –Safe mechanism Crates don’t change state if the control is disconnected –Manual on/off in parallel –Optoinsulated control –The controlled object gives also a status bit Read via an optocoupled input register –To be kept in NA62 for transceiver and preamplifier power supplies R. Fantechi

Preamplifier - 1 What are they? –Electronic circuits running in the liquid krypton –Need power supplies (+12V, -3.5V) + one control voltage (+6V) Implementation –4 main power supplies, giving two positive and equal voltages and one negative –Distribution cabling to the 16 boxes on top of the calorimeter –Inside the boxes, there are regulator boards to reduce the voltage to the needed one, connected directly to the connectors on the calorimeter flanges –Each board drives a small fraction of the calorimeter R. Fantechi

Preamplifier - 2 Control –Switch on/off of the 4 main power supplies –Read status bits Monitoring –4 set of analog values from the 4 main power supplies (24 channels) For each one: 2 positive voltages, 1 negative voltage and the 3 relative currents All the measurement are voltages, with suitable conversion factors –64 sets of voltages for the 64 columns of the calorimeter Each column: (one +12V, one 3.5V, one +6V) * 2 (top and bottom) A total of 384 analog channels –React if the voltage/current read is different from the nominal within a predefined delta R. Fantechi

Transceiver - 1 What are they? –Electronic circuits located just outside the LKr cryostat –Functions: shaping and differential drive for cables –Need power supplies (+6V, -6V) Implementation –28 main power supplies, giving one +6V and one – 6V –Switch on/off box located nearby Manual switch possible 220V Solid state relays with the usual switch on/off logic R. Fantechi

Transceiver - 2 Control –Switch on/off of the 28 main power supplies –Additional software interlock to inhibit switch on if the status of the ventilation is not ok Monitoring –28 sets of analog values from the power supplies The 2 voltages The 2 currents 2 temperature channels, implemented with an IC which needs a +5V power supply and provides a voltage proportional to the temperature A total of 168 analog channels –React if the voltage/current/temperature read is different from the nominal within a predefined delta R. Fantechi

Ventilation and thermal switches Ventilation –Set of analog values (temperatures) and status bits coming from various ventilation equipment –In the old system, all were displayed in a single page –Alarm to be set if bad status or temperature out of range Thermal switches –24 thermal switches on top of 24 racks Set to switch at 40 degrees Cabled to optoinsulated input registers There are also installed 24 NTCs to measure the temperature: they are cabled, I think, but never used –Alarm sent if there is a change of state of the switch –Could be easy, with an ELMB, to read also NTCs, if needed R. Fantechi

High voltage Start discussion some time ago –Custom made system –It has the particularity to have floating ADCs on the HV line –NA62 could reuse a reduced set of modules, implying a simpler programming –There is nothing ready to handle this –Even a check with CAEN failed (possible use of the OPC server for their VME HV modules) –It seems reasonable to have an “hybrid system” VME modules read by a PC with simple software Pubblication of data to PVSS via DIM Main power supply will be CAEN Easy implementation of in-burst current measurement R. Fantechi