Kent Grebing, API SC 16 Chair

Slides:



Advertisements
Similar presentations
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Advertisements

API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
11 Ed Baniak Senior Standards Associate Washington, DC January 28, 2010 API Report API-AGA Joint Committee 2010 API ECS Winter Conference New Orleans,
GE Oil & Gas Drilling & Production API SUBCOMMITTEE 6 WORK GROUP ON API SPEC 6A May 2009 Westminster, Colorado.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
SC18:TG8 API Specification Q1 Guidance Document.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Supply Chain Management Report for SC 18 January 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
API 17X Subsea Boosting January 13, 2015
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
API 16F June 2017 Specification for Marine Drilling Riser Equipment
API S64 Summer Conference Update.
Status Update on API 16Q / 16R / 16F
API SC6 Valves and Wellhead Equipment
ISO TC64/SC4/WG2 June 2010 status
2016 Exploration & Production Standards Conference Subcommittee 10
ISO TC64/SC4/WG2 May 2011 status
RAISING PERFORMANCE. TOGETHERTM
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API Standard 53 Update June 2017
API 16 AR Specification for Drill-through Equipment Remanufacturing
Specification on float equipment
Discussion Points API RP 17A Task Group Members
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16C Choke and Kill Equipment
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
API 16RCD January 2019 Specification for Rotating Control Devices
API Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

Kent Grebing, API SC 16 Chair SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Summer Standards Meeting Kent Grebing, API SC 16 Chair

API SC16 13 Documents 10 documents being worked 3 have been balloted Resolving comments 2 new documents 1 to be issued for ballot in June 1 will be absorbed in another document 2 document not being worked SRRR work items 16A rewrite 5th edition

16A Spec: Drill-through Equipment 4Th edition Balloted and resolving comment s 750, re-ballot changes Release for publication in December, Addendums SRRR for 5th edition 16AR Std: Repair & Remanufacture of Drill-through Equipment Balloted 1st quarter 2015, resolving comments , will need to re-ballot Release for publication 4th quarter 2015 16C Spec: Choke and Kill Systems 2nd Edition 2Nd edition Published March 2015, 3Rd edition rewrite First meeting June 2015 .

16D Spec: Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment Submitted for ballot June 2015 Changes include accumulator sizing, electrical section quantity of remote panels 16F/R Spec: Marine Drilling Riser Equipment revision activity ongoing. 2 Addendum issued , Ballot 2015 16Q RP: Design, Selection, Operation and Maintenance of Marine Drilling Riser Systems First Ballot February 2015 resolving comments

16RCD Drill Through Equipment--Rotating Control Devices Balloted comments resolved and released to API for editing and legal review 16ST Coiled Tubing Well Control Equipment Systems Working on rewrite, first ballot target date 4th quarter 2016 RP64: Diverter Systems Equipment and Operations working on rewrite ,ballot 4th quarter 1015 .

Issues Bolting Consistency across documents Resources and participation