An Airline Perspective on the implementation of new systems SEMINAR ON THE IMPLEMENTATION OF DATALINK AND SATCOM COMMUNICATIONS Bangkok Thailand, 17-19.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

ATC Simulation as an integral part of ensuring Operational Safety David Webb Air Systems.
ASECNA AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR
? CLASS I Candidate CSs FOM ? Class I Class II Class III Class IV
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Introduction to Aeronautical Data Links
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
FAA SATCOM Programs Briefing for
U.S. Plans for ADS-B Briefing for
FANS (Future Air Navigation System) Flight Crew Procedures
Aviation System Block Upgrades and NAV CANADA Planning 17 November 2012 Pre-AN-Conf/12 Workshop.
GLOBALink/HF Data Link
SESAR position on ATM Communication Technologies and future trends Kors VAN DEN BOOGAARD, SESAR CIT Hanspeter KULHEN, SESAR Task 2.5 R - EADS Astrium Cedric.
Voice and Data Operations in the North Atlantic
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
VDL Mode 4 Supporting Air-Ground communications November 2003Seminar on the Implementation of Datalink and SATCOM Communications1 VDL Mode 4 Supporting.
Air / Ground Communications in Europe
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
Seminar on the Implementation of Datalink and SATCOM Communications
GLOBALink/VHF Digital Link Mode 2
Economic Impact Of ATC Jeff Poole, March Air transport is critical to the global economy We are a US$450 billion industry We support US$2.9 trillion.
Presentation by K. P. Rimal, Regional Officer of the ICAO ASIA-PACIFIC Office to the Seminar on implementation of data link and SATCOM Communications in.
GENSPACE Air Traffic Management
Satellites –part of the solution for global Air Traffic Management An Airbus view Peter Potocki de Montalk – Director, Air Traffic Systems 3 March 2006.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Future Communications Roadmap
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
International Civil Aviation Organization
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Technology Roadmaps H. Sudarshan
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Global Air Navigation System ~Interoperability.
ASAS-TN ASAS-TN - what’s in it for easyJet? presented by graeme clark - strategic projects manager, easyJet 29 April 2003.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Thailand Implementation of CNS/ATM Infrastructure Thailand.
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
Air-Ground Data Link - DFS Strategy
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
Data Link & CNS/ATM: A Business Perspective
ATN Subnetwork Implementation:
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
Performance Based Navigation Aviation Industry Forum 18 November 2009.
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
GNSS Aviation Applications
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
International Air Transport Association Transition to the new CNS/ATM ATN 2000, September 2000, London Günther Matschnigg IATA Vice President Operations.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding EGNOS System Definition and Benefits.
2015 IFATCA regional meeting October 2015 Accra An Enabling Environment for Air Navigation Lindi-Lee Kirkman Manager Safety & Flight Operations Africa.
The Global Voice of ATM Building ATM Capacity in the Middle East.
Making VDL Mode 4 a Reality Bengt Moberg C.N.S. Systems AB ATN 2002 September 25th, 2002.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
September 2003 ATN Middle East Airlines CNS Developments in the Middle East Captain Ousama Balaa, Head of Technical Department Middle East Airlines.
World-Wide CNS/ATM Systems Implementation Conference
Aeronautical Communications Global Needs Global Solutions
Dave Behrens Director, Infrastructure Strategy IATA
Presentation transcript:

An Airline Perspective on the implementation of new systems SEMINAR ON THE IMPLEMENTATION OF DATALINK AND SATCOM COMMUNICATIONS Bangkok Thailand, November 2003 Kors van den Boogaard Assistant Director CNS

International Scheduled Traffic 95% of IATA Today Founded in Member Airlines in August 2003

Over 90 Offices Worldwide

Present Status Industry Total losses since 9/11 US$25 billion Expected losses 2003 US$10 billion Loading: Rising – Yield: Falling Airports and Air Navigation Charges US$40 billion annually: Rising !

Why a new system ? Safety Capacity Efficiency –Service improvement –Service costs –System costs Technology is not the driver but the enabler !

Airspace volume/capacity Communication NAVIGATIONNAVIGATION SURVEILLANCE ATM A T S Airspace Airspace V o l u m e

Air Traffic Infrastructure: Flight Efficiency CDM D/L Subnetworks (VHF, VDL M-2,3,4, UAT, Mode-S, SATCOM, HFDL, Gatelink) ATS Datalink (ATN), (AOC, ACARS) GNSS (GPS, GALILEO, GLONASS ) GBAS (LAAS)SBAS (EGNOS/WAAS) GBAS (LAAS) CPDLC + VOICE Mode-S Surv., ADS, ADS-b, ASAS A-SMGCS T.O. GuidanceRNP <= 1 RNP RNAV Landing Guidance RNP <= 1 RVSM MLS GLS ILS FLIGHT (efficiency) Block-time FUNCTIONSFUNCTIONS ENABLERSENABLERS LEGACY SYSTEMS: VHF, HF, ILS, VOR, DME (ADF, MB, OMEGA)

COMMUNICATION Function, protocol, link The function itself: partly on the ground (ATC), partly in air: (cockpit). A protocol to establish contact A link to provide connectivity All 3 elements require investment and operating cost, only the function will provide benefit.

FANS-1/A CPDLC/ADS ACARS VHF COMM SATCOM HFDL ACARS FANS-1/A CPDLC/ADS FUNCTIONALITYFUNCTIONALITY AIR GROUND Function Subnetwork Protocol REQUIREMENTS Air- Ground Data Link, point-to-point

ICAO CPDLC/ADS ATN VDL M-2 ATN ICAO CPDLC/ADS FUNCTIONALITYFUNCTIONALITY AIR GROUND Function Subnetwork Protocol REQUIREMENTS Air- Ground Data Link, point-to-point

Converging to one solution for ATS Data-Link? USA/CAN (ICAO) CPDLC Build 1 Build 1a Build 2 EUR(ICAO)CPDLC LINK Trans-atlantic CPDLC/ADS FANS-1/A Capacity Safety Efficiency

Communication Lines

Airlines and Communication The requirement –to ensure safety –to conduct business efficiently –to provide service to the passengers Adequate capacity –restrictions in air traffic –reduced efficiency –passengers satisfaction Increased reliance –reduction of separation –information need to support operations –new applications

The Basic Needs Adequate capacity/Radio Spectrum Global connectivity Global interoperability Scalability Support Data/Voice/Video Support for all classes of communication traffic Cost effective

How to satisfy the need ? Maintain present voice system –25 kHz –Extend the use of 8.33 kHz if necessary Encourage the introduction of data communications for ATS: –ACARS –Satcom/HF data –AOA –FANS 1/A –VDL Mode 2 –Mode ES Development of one global common communication infrastructure

European Frequency Congestion

How not to proceed /25 kHz VDL Mode 2 VDL Mode 4VDL Mode Additional capacity ? New Operational Concept

How to proceed /25 kHz VDL Mode 2 VDL Mode 4VDL Mode New Operational Concept New System Definition. Mobile. Telecom Techn ITU WRC 2007 Standards Impl.

Dependent SURVEILLANCE Function, Enabler A surveillance function resides in all aircraft (in a given (air)space) and at ANSP-facilities. Both Communication and Navigation contribute to a surveillance function. Navigation to provide the aircrafts position (4D) and Communication to relay the message to all parties interested (broadcast).

LEGACY SYSTEMS: VHF, HF, ILS, VOR, DME (ADF, MB, OMEGA) Air Traffic Infrastructure: Surveillance example D/L Subnetworks (VHF, VDL M-2,3,4, UAT, Mode-S, SATCOM, HFDL, Gatelink) ATS Datalink (ATN), (AOC, ACARS) GNSS (GPS, GALILEO, GLONASS ) GBAS (LAAS)SBAS (EGNOS/WAAS) GBAS (LAAS) Mode-S Surv., ADS, ADS-b, ASAS FLIGHT (efficiency) Block-time ADS-b 4, UAT, Mode-S GPS, GALILEO FUNCTIONSFUNCTIONS ENABLERSENABLERS

Need for ADS-B ? Safety –Ground infrastructure costs Security ? Efficiency –Enhancement present procedures Capacity –Enhancement of present procedures –New ATM regime Costs –Service/System costs

ADS-B Infrastructure costs Airborne infrastructure –One link -8 billion (80-90% integration) –Two links –10 billion Ground station infrastructure –One link 2 billion –Two links 2. 5 billion –ATC integration ?

Capacity/Efficiency Pushing the present system into a new ATM Regime Enhanced Surveillance Capacity ADS-B Single linkADS-B Second link ATM Capacity Transition to new ATM Regime Time Traffic growth Delay costs

Surveillance costs Ground Infrastructure Surveillance Costs Time ADS-B Single linkADS-B Second link Traffic growth C1C1 A1A1 C2C2 A2A2 Reduction in surveillance cost per aircraft: C 1/ A 1 C 2 /A 2

IATA position ADS-B Prime enabler of new ATM concept Early cost efficient implementation –Extension TCAS ES Phased implementation Global interoperability Business case !

Scenario TCAS VDL Mode 4 Mode ES UATMode ESTIS-B EuropeUS

Result ! Resources wasted Complexity of multiple links Double/Triple infrastructure costs

What needs to be done Clearly identify/quantify role/benefit ADS-B in new ATM concepts Plan ADS-B implementation on a Regional basis conform ATM improvements Maintain principle of global systems

What are the basic questions? When a new system Usage/Functionality Selection Standardization Certification Implementation –Voluntary/ Mandatory Capacity/Efficiency Benefits