Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/20 2007 (courtesy of D. Krämer for the FAIR Design Team) Current.

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
FAIR Synchrotrons SIS100/300
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
FAIR March 20, 2007 D. Krämer GSI/FAIR Division Technical Status: status of layout status of civil engineering items under current discussions status of.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
CCC Meeting Cryogenic Current Comparator in the FAIR Project Overview of FAIR / current status Beam diagnostics work package Tasks and installation locations.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Facility for Antiproton and Ion Research
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt A Status Report Hans H. Gutbrod CBM collaboration meeting 7. July.2003.
Magnet designs for Super-FRS and CR
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
The FAIR Project Walter F.J. Müller, GSI, Darmstadt CBM Technical Coordinator FAIR Joint Core Team 2 nd CBM India Meeting, VECC, Kolkata, July 2007.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Status of GSI-FAIR Project magnets - open issues - G. Moritz GSI CARE HHH AMT November
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
Facility for Antiproton and Ion Research – Research Program and a Status Report Walter F. Henning – GSI Darmstadt & University of Frankfurt Hadronic Physics,
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
Status of the FAIR Project
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
(Procurement, testing of magnets)
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
Project "Nuclotron M" / NICA
FAIR – the Universe in the labororatory
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
and collaboration with France
Presentation transcript:

Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current Status of the FAIR Project

The Pillars of the FAIR Complex Antiproton production 100 Tm Synchotron sc SIS100 Collector & Cooler Ring Accumulator Ring Deceleration Rare isotope Production & separator sc High Energy Storage Ring HESR & PANDA nc or sc New Experimental Storage Ring Compressed Barionic Matter experiment NESR 300 Tm Stretcher Ring sc SIS300 From existing GSI UNILAC & SIS18 & new proton linac + Experiments: E-I collider Nuclear Physics Atomic Physics Plasma Physics Applied Physics sc

Technical Realization of FAIR 100 m UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR FLAIR Radioactive Ion Production Target Anti-Proton Production Target Existing facility: provides ion-beam source and injector for FAIR Existing facility: provides ion-beam source and injector for FAIR New future facility: provides ion and anti-matter beams of highest-intensity and up to high energies New future facility: provides ion and anti-matter beams of highest-intensity and up to high energies

Unprecedented System Parameters at FAIR (a multi-purpose facility) Beam Intensity: - primary heavy-ion beam intensity increases by x 100 – x secondary beam intensity increases by up to x Beam Energy: - heavy-ion energy : x 30 Beam Variety: - antiprotons - protons to uranium & radioactive ion beams Beam Precision: - cooled antiproton beams - intense cooled radioactive ion beams Beam Pulse structure: - optimized for experiments: from dc to 50 ns Parallel Operation: - full accelerator performance for up to four different and independent experiments and experimental programs

The International Committee Structure (for XFEL & FAIR) PAC QCD PAC NUSTAR PAC APPA TAC Observes: FCI Full Cost Issues AFI Working Group Administrative + Funding Issues LFI Legal Framework Issus STI Working Group Scientific + Technical Issues ISC International Steering Committee Delegates from partner states CORE Cost Review Groups Reviews Cryogenics Warm magnets Cold magnets Power Supplies Beam Instrumentation p-Linac Austria China Finland France Germany Greece India Italy Poland Spain Sweden Russia Great Britain Romania Baseline Technical Report - accelerator TR's - experiment proposals - civil construction plans (~ 3500 pages) PAC & TAC Review Reports Cost Book Cost Review Reports - accelerator & civil construction (CORE-A) - experiments (CORE-E) Convention Articles of Association By-Laws Final Act Document Legal Framework Report (LFI) Full Cost Structure Report (FCI) FAIR Project

Workshops / White Papers: exploration of science opportunities Wissenschaftsrat-Evaluation BMBF Press Release CDR Submission Preparation of CDR 700 scientists WR – ESAC – ETAC – EMAC -- EAC International SteeringCommittee ISC  STI PAC's / TAC / miniTACs CORE-A / CORE-E  AFI (LFI / FCI ) International MoU Accelerator R & D coordinated by GSI Proto-Collaborations international community Civil Construction Planning / Regulatory Processes / UVS Preparation of FBTR 2400 scientists FBTR Submission

Project Costs Accelerator investment costs 533 M€ Civil construction costs 289 M€ Baseline experimental facilities ( incl Super-FRS) 180 M€ Investment budget 1002 M€ Manpower (2400 person-years) 185 M€ Total Construction Costs 1187 M€ Commissioning Costs 28 M€ Operation Costs up to M€ Sum 2700 M€ Germany committed part of funding 25% of funds have to come from non- German partners Scrutinized by CORE, TAC, STI …

FAIR Work Packages 94 WPs defined, following WBS, FBTR and Cost Book schematics 13 subprojects 15 technical systems interest to take WP indicated in-kind

Recent decision by German Minister Ms. Schavan: Start of the International FAIR Project on November 7, 2007 together with all partners that have expressed their commitment on FAIR. Stage A: ? ; Stage B: SIS 300 and 300 Tm beamline 11/2007: official end of R&D-phase project money acc. costbook, no R&D money

SIS100/300 Design Parameters First Stage: Second Stage: Acceleration + Acceleration + Compression Stretching Reference IonsU 28+ p U 28+ U 92+ Magnet. rigidity100 Tm300 Tm Circumference1083 m Number of Particles 5 · · · /s 1 · /s Energy2.7 GeV/u 29 GeV 2.7 GeV/u 34 GeV/u Beam time structure 25 – 90ns 50 ns d.c. slow ext. Dipole flux density 2 T4.5 T Ramp Rate4 T/s1 T/s SIS300SIS100 SIS300SIS100

Straight mark I full scale dipole magnet under fabrication at BNG / Würzburg Curved mark I full scale dipole magnet under fabrication at BINP / Novosibirsk R&D continued at JINP / Dubna incl. Quadrupole prototype Progress in SIS Magnet R&D GSI001, first 4 T prototype by BNL 6 T protoype under construction at Dubna Curved 4.5 T dipole magnet under fabrication at INFN BINP Novosibirsk

SIS 100 Dipole under Construction

Layout of Super-FRS B  max =20 Tm Superferric Multiplet Superferric Multiplet 3 x 9.75° Dipole Unit MF2 MF1 Superferric Multiplet on-going magnet activities: conceptual design multiplett (Toshiba) superferric dipole (China) radiation resistant magnets (BINP)

The assembly of die First lamination punched IMP Lanzhou IPP Hefei IEE Beijing CAS Super-FRS Dipole Prototype Development in China Coil fabrication Magnet design

High Energy Storage Ring Momentum: 1.5 – 15 GeV/c Straights: Cooler and target section Ring circumference: 573 m. for antiprotons

The International Facility for Antiproton and Ion Research in 2015/2016 Austria China Finland France Germany Greece India Italy Poland Spain Sweden Russia Great Britain Romania

Estimated Total Manpower for construction as scrutinized and approved by CORE-A and STI in 2005/2006

specification QA, construction SIS 100 CR Man Power Resources (dominantly provided by GSI) 1950 man-years during 8 years required on site incl. 205 m-y for controls FAIR Div. Acc. Div.