BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Similar presentations


Presentation on theme: "BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings."— Presentation transcript:

1 BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006

2 Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings 2. Septum magnets for synchrotrons and storage rings 3. Technical design of ER and interaction region for collider mode including modification for AIC/NUSTAR 4. Luminosity monitor and electron spectrometer for ELISE/NUSTAR 5.Pbar-Target and Collection 6.Ultra Cold Electron Target for NESR 7.Prototype High Voltage Section for the NESR Electron Cooler 8.Resistive coil magnets for FAIR 9.Production of vacuum chambers for SIS18 quadrupoles (addressed in EU-FP 6 Construction contract No. 515876) 10.Study for High radiation resistant magnets for Super-FRS (R&D contract No. RU/03533872/SE-05007 is already placed) 11.Prototype Design for the RF-Cavities at SIS100 /300 (Continuation of the study with purchase order No. 4500054244) Subject and Objectives of the Contract

3 BINP for FAIR Super-FRS target high radiation resistant magnets Electron-ions collider (eA) e-linac electron spectrometer P_bar-ions collisions Electron colling: NESR (e-coller, e-target); e-cooler for P_bar –A collider, HESR e-cooler Kickers for synchrotrons and storage rings Septum for synchrotrons and storage rings Superferric dipole and quads for CR RF for SIS-100 (300) Polarized P-P_bar collider at HESR

4 target, magnets EIC AIC SIS-100(300) pulse dipole septums, kickers RF e-cool P-P_bar collider SIS-18 vacuum chamber CR quads e-cool

5 Layout and Design Parameters of the Super-FRS The main technical challenges are at the Pre-Separator The physical performance of the new facility can be directly deduced from the experience with the FRS Design Parameters

6 First stage of Super-FRS production target ΔBρ/Bρ beam Q S Q

7 High power target based on liquid lead alloy technology Operating temperature range (300-400°C) provides annealing of radiation damages in all corresponding subsystems. It provides cheap and reliable solution for bearings and rotation feed-through in high radiation area. Shaft cooling unit ( tested on 75 kW beam power)

8 High radiation resistant dipole magnet Power ~ 120 kW Weight~ 90 t Cu MO

9 High radiation resistant sextupole magnet

10 e-A collider

11 Spectrometer dp/p = 2  10 -4 Full tracking simulation including detectors 10% of full (azimuthal) angle coverage spherical abberations e A (magnets cost 1.5 MEuro)

12

13

14

15 Quads for CR CR septum quadrupole CR superferric quadrupole (wide)

16 Superconducting septums for SIS-100 1T Lambertson magnet 3T septum magnet (fast)

17 Simulations based on TR-Nov-2005 report. SIS 100 extr/emrg kicker 2D simulations. BINP proposal. Ceramic vacuum chamber Ferrite 8C11 Busbars nonhomogeneous field more homogeneous field Magnetic field, A/m, 0-10e5

18 SIS 100 extr/emrg kicker 3D simulations. Magnetic field, A/m, 0-10e5

19 Design of RF-station for SIS-100 (10-th harmonic) Frequency range 1.1-2.7 MH RF voltage 19 kV Ferrite type 400 NN-2 Number of ferrite for unit 68 Number of unit 29 Cost per unit 0.5 Euro

20 Conceptual Design for a Polarized Proton-Antiproton Collider Facility at HESR

21 Layout of the P-P_bar collider 12  12 bunches

22 …… for BINP Super-FRS target 0.5 high radiation resistant magnet 1.3 Electron-ions collider (eA) e-linac + ring 4.5 + 3.5 electron spectrometer (magnets) 1.5 P_bar-ions collisions 2.0 Electron cooling: NESR (e-cooler, e-target) 4.0 e-cooler for P_bar –A collider, 0.5 HESR e-cooler 5-7 Kickers for synchrotrons and storage rings 0.2/per unit Septum for synchrotrons and storage rings Superferric dipole and quads for CR RF for SIS-100 (300) 0.5/per unit Polarized P-P_bar collider at HESR + 17.0 M€M€